Home / Browse projects / Sangli, Maharashtra / SAFALYA

Completed No litigation declared Others project

SAFALYA

By HRISHIKESH SHRIPAD DESHPANDE

RG-MH-35897 · RERA P53100048427 · Last updated on MahaRERA portal: 4 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SAFALYA is a Others project by HRISHIKESH SHRIPAD DESHPANDE in Sangli, Maharashtra, registered with MahaRERA as P53100048427 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Aug 2025.

At a glance

Project

  • NameSAFALYA
  • TypeOthers
  • Location
    • 100 FEET ROAD NEAR FEDRAL BANK
    • VISHRAMBAG
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100048427
  • ReraGenie IDRG-MH-35897

Builder

  • NameHRISHIKESH SHRIPAD DESHPANDE
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredJan 2023PromisedAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Aug 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAFALYANA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SAFALYA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered12
Open Space10

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area492 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
SMT SUNITA SUDHIR JOSHISangli Miraj Kupwad (M Corp.)Sangli
shri milind sudhir joshiPune (M Corp.)Pune
MR MAHENDRA S JOSHISangli Miraj Kupwad (M Corp.)Sangli
SHRINIVAS VASUDEO KULKARNIThane (M Corp.)Thane
BHAGWANT VASUDEO KULKARNISangli Miraj Kupwad (M Corp.)Sangli
GAJANAN KULKARNIPune (M Corp.)Pune

Approvals and building plan

Permissible FSI1529.63
Proposed, not sanctioned1,079 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGLI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMRS NANDINI DESHPANDE
Engineervishal v gaikwad
Chartered Accountantamit anil shende
PartnerRole in project
HRISHIKESH SHRIPAD DESHPANDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Mar 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2024.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-6-2023.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-12-2024.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Safalya - Form 2 - Upto 30 June 2023 01072023.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Safalya - Form 2 - Upto 30 June 2023 01072023.pdf4 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Unslod upto 31122024.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Unslod Invetary Circ 29 upto 30062023.pdf4 Mar 2025
Building plan approvalFile: REVISED PLAN SAFALYA_compressed.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 UPTO 31-03-23.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 UPTO 30-06-2023.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN SAFALYA_compressed.pdf5 Dec 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE change 7082024.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - (Quality Assurance) 2022-23.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certficate Form 1 30062024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1 30092024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3 Chartered Accountants Certificate 30 06 2024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3 Chartered Accountants Certificate 30092024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form - 2 30062024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architects Certificate Form 1 30092024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-Unslod upto 30062024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-Unslod upto 3092024.pdf22 Oct 2024
Other - TechnicalFile: declaration about area_compressed.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annaual Report Statement Of Accounts CA.pdf22 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D - 150324.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 UPTO 31-12-23.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 2 UPTO 31032024.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 UPTO 31122023.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 UPTO 31032024.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A - Engineer's Certificate (Quality Assurance) 2023-24.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: Sold-Unslod Invetary Circ 29 upto 31122023.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: Sold-Unslod Invetary Circ 29 upto 31032024.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountants Certificate 1 31122023.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountants Certificate 2 31 03 2024.pdf14 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Order NO 34 - 150324.pdf14 May 2024
Other - TechnicalFile: SMKC TO MAHARERA MAIL.pdf14 May 2024
Building plan approvalFile: Plan (1)_compressed (1).pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan (1)_compressed (1).pdf28 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Parvana.pdf28 Nov 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE (1).pdf28 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 39 Self affidevit - Safalya Revised.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Safalya Rera - Form 1 .pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Safalya RERA Form 2 Engg Certi .pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold-Unslod Invetary Circ 29.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Safalya Rera - Form 3 - CA Certificate.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23 Form 5 Safalya.pdf16 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Archi Certi March2023 2- Safalya.pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engg Certi-31_03_23.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: CIRCULAR NO 29 SOLD BOOKED-converted.pdf19 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA - CA Certif Safalya March23.pdf19 May 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES LEGAL.pdf13 Dec 2022
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES LEGAL.pdf13 Dec 2022
Layout approvalFile: 8700 CS Plan.pdf29 Nov 2022
Building plan approvalFile: SAFALYA SANCTION PLAN COPY_compressed.pdf29 Nov 2022
PAN CardFile: pan.pdf29 Nov 2022
Copy of the legal title reportFile: SEARCH TITLE INSPECTION REPORT.pdf29 Nov 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES FINANCIAL.pdf29 Nov 2022
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES FINANCIAL.pdf29 Nov 2022
Copy of Layout Approval (in case of layout)File: 8700 CS Plan.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: SAFALYA SANCTION PLAN COPY_compressed.pdf29 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: SAFALYA - BUILDING PERMISSION.pdf29 Nov 2022
Declaration about Commencement CertificateFile: DECLARATION ABT COMM CERTIFICATE.pdf29 Nov 2022
Declaration in FORM BFile: affidavit cum declaration.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf29 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf29 Nov 2022
CERSAI detailsFile: ERSAI REPORT.pdf29 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Safalya Form3 - 10122022.pdf29 Nov 2022
Proforma of Allotment letterFile: ALOTMENT LETTER FINAL SIGN.pdf29 Nov 2022
Proforma of Agreement for saleFile: agreement of sale 23122022.pdf29 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf29 Nov 2022
Deviation Report with respect to Allotment letterFile: NO DEVATION.pdf29 Nov 2022
Deviation Report with respect to model copy of AgreementFile: DEVATION REPORT AGGRIMENT TO SALE.pdf29 Nov 2022
Other - LegalFile: DEVELOPMENT AGREEMENT.pdf29 Nov 2022
Other - LegalFile: KULMUKHTYAR PATRA.pdf29 Nov 2022

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SAFALYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VISHRAMBAG790+ in Sangli

2 kmSAFALYACompleted 108Lapsed / revoked 57Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: HRISHIKESH SHRIPAD DESHPANDE

HRISHIKESH SHRIPAD DESHPANDE has 3 registrations on MahaRERA, including KAILAS HEIGHTS and Guruprasad Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SAFALYA is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAFALYA?

The registered promoter entity is HRISHIKESH SHRIPAD DESHPANDE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAFALYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAFALYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAFALYA?

The professionals named in the filing: Architect: MRS NANDINI DESHPANDE; Engineer: vishal v gaikwad; Chartered Accountant: amit anil shende. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAFALYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAFALYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAFALYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.