Home / Browse projects / Palghar, Maharashtra / SADGURU HEIGHTS

Registered No litigation declared Residential / Group Housing project

SADGURU HEIGHTS

By SHREE SADGURU BUILDERS & DEVELOPERS

RG-MH-29466 · RERA P99000028439 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
15 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
57 of 99Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

SADGURU HEIGHTS is a Residential / Group Housing project by SHREE SADGURU BUILDERS & DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000028439 on 2 Mar 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 42 of the 99 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.

At a glance

Project

  • NameSADGURU HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Mayekar wadi Virat Nagar
    • Virar west
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000028439
  • ReraGenie IDRG-MH-29466

Builder

  • NameSHREE SADGURU BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersNITIN BABUBHAI JAIN, KANHAIYALAL KARTARAM PARIHAR, RAVINDRA SURYAKANT CHAVAN

Key dates

this monthRegisteredMar 2021First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Mar 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings2 building records
  • Documents filed90 files

Current status

42%42 of 99 units booked
137.1%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SADGURU HEIGHTS WING ANA141455661
SADGURU HEIGHTS WING BNA8835338

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SADGURU HEIGHTS WING A80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
SADGURU HEIGHTS WING B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Closed/Covered2
Open Space79
BuildingClosed/CoveredOpen SpaceTotal
SADGURU HEIGHTS WING A14041
SADGURU HEIGHTS WING B13940

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,428 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Nov 2025
LandownerVillageDistrict
OM SHRI HARI CHS LTDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation (VVCMC)
Permissible FSI5141.04
Proposed, not sanctioned1,338 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12 TO 15 SWASTIK PARADISE OPP OLD VIVA COLLEGE VIRAR WEST 401303
Estimated costRs 11.45 cr
Cost incurredRs 15.70 cr
Work done137.12%
BuildingWingEstimatedIncurred
SADGURU HEIGHTS WING ANARs 11.45 crRs 15.70 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKuldeep Patil
EngineerChirag H Makani
EngineerAashish Paresh Desai
Chartered AccountantK L CHURI
Chartered AccountantMISHRA MAYEKAR & CO.
PartnerRole in project
SHREE SADGURU BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23072621848Jun 2026 → Jun 2027

Reason as filed by the promoterProject work has been completed 100% and application submitted to VVCMC to avail Occupancy Certificate. B wing part OC already received

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Girdhari Heights June26 QRTR1.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2 June 26 QRTR1 Girdhari Heights.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 3 Girdhari Heights June 26 QRTR1.pdf23 Jul 2026
Form 5 (FY 2025-2026)File: fORM 5 2025-26 SADGURU HEIGHTS.pdf2 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Sadguru Heights 2025-26.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 Shree Sadguru QRTR 4.pdf2 Jun 2026
Withdrawal Update Form 2File: Form 2 Shree Sadguru QRTR 4.pdf2 Jun 2026
Withdrawal Update Form 3File: Form 3 Shree Sadguru QRTR 4.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1 SADGURU Heights QRTR 3.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 Sadguru Heights QRTR 3.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 SadGuru Heights QRTR 3.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 Shree sadguru 2nd QRTR.pdf26 Nov 2025
Withdrawal Update Form 1File: Form 1 Shree sadguru 2nd QRTR.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM 2 Shree sadguru 2nd QRTR.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM 2 Shree sadguru 2nd QRTR.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 Sree Sadguru 2nd QRTR.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 Sree Sadguru 2nd QRTR.pdf26 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-2025.pdf26 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Shree Sadguru 2024-25.pdf26 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Sadguru (2).pdf2 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sadgugru 1.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Feb 2025
Layout approvalFile: layout sadguru_compressed.pdf14 Oct 2024
Building plan approvalFile: Bldg plan sadguru_compressed (1).pdf14 Oct 2024
Layout approvalFile: layout sadguru_compressed.pdf14 Oct 2024
Building plan approvalFile: Bldg plan sadguru_compressed (1).pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 sadguru.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sadguru.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 sadguru.pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: layout sadguru_compressed.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: rdp sadguru.pdf14 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg plan sadguru_compressed (1).pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: layout sadguru_compressed.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sadguru.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 sadguru.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: rdp sadguru.pdf14 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg plan sadguru_compressed (1).pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 sadguru.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 shree sadguru.pdf17 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A shree sasdguru.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree Sadguru.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree sadguru.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 shree sadguru.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23 shree sadguru.pdf24 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1Form 3 shree sadguru.pdf24 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sadguru_compressed.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sadguru.pdf27 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: from-2A 2021-22 sree sadguru.pdf2 Jan 2023
Details of encumbrancesFile: non-encumbrance concern to financeSHREE SADGURU.pdf7 Dec 2022
Details of encumbrances concerned to FinanceFile: non encumbrance concern to legal SHREE SADGURU.pdf7 Dec 2022
Details of encumbrances concerned to FinanceFile: non encumbrance concern to legal SHREE SADGURU.pdf7 Dec 2022
Details of encumbrances concerned to FinanceFile: FINALnon-encumbrance concern to LEGAL SHREE SADGURU.pdf7 Dec 2022
Details of encumbrances concerned to LegalFile: non encumbrance concern to legal SHREE SADGURU.pdf7 Dec 2022
Details of encumbrances concerned to LegalFile: non encumbrance concern to legal SHREE SADGURU.pdf7 Dec 2022
Details of encumbrances concerned to LegalFile: FINALnon-encumbrance concern to LEGAL SHREE SADGURU.pdf7 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SHREE SADGURU 2022.pdf7 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA seperate bank SHREE SADGURU.pdf7 Dec 2022
Declaration in FORM BFile: from b promoter shree sadguru latest.pdf24 Nov 2022
Declaration in FORM BFile: new From B promoter Shree sasguru.pdf23 Nov 2022
Copy of the legal title reportFile: development agmnt 1 shree sadguru.pdf8 Nov 2022
Copy of the legal title reportFile: development ahmnt2 shree sadguru.pdf8 Nov 2022
Copy of the legal title reportFile: purchase agmnt shree sadguru.pdf8 Nov 2022
Copy of the legal title reportFile: retirement partners shree sadguru.pdf8 Nov 2022
Layout approvalFile: layout shree sadguru.pdf4 Nov 2022
Building plan approvalFile: bldg plan A shree sadguru bldrs.pdf4 Nov 2022
Building plan approvalFile: bldg plan B shree sadguru bldrs.pdf4 Nov 2022
Copy of Layout Approval (in case of layout)File: layout shree sadguru.pdf4 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan A shree sadguru bldrs.pdf4 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan B shree sadguru bldrs.pdf4 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: RDP SHREE SADGURU BLDRS.pdf3 Nov 2022
Declaration about Commencement CertificateFile: CC DECLARATION SHREE SADGURU.pdf28 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold inventory shree sadguru.pdf28 Aug 2021
Proforma of Allotment letterFile: Model Agreement Rera SADGURUBHEIGHTS.pdf28 Feb 2021
Layout approvalFile: LAYOUT SADGURU.pdf21 Feb 2021
Building plan approvalFile: PLAN 1 SADGURU.pdf21 Feb 2021
Building plan approvalFile: PLAN 2 SADGURU.PDF21 Feb 2021
PAN CardFile: PANCARD SHREE SADGURU.pdf21 Feb 2021
Copy of the legal title reportFile: TITILE REPORTS SHREE SADGURU.pdf21 Feb 2021
Copy of the legal title reportFile: development agrement shree sadguru.pdf21 Feb 2021
Details of encumbrancesFile: Non encurmbrance sadguru.pdf21 Feb 2021

How this compares with Palghar

42%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SADGURU HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar west3,200+ in Palghar

2 kmSADGURU HEIGHTSCompleted 58Lapsed / revoked 34Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 192 registered projects within 2 km.

Builder: SHREE SADGURU BUILDERS & DEVELOPERS

SHREE SADGURU BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including SADGURU HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SADGURU HEIGHTS is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SADGURU HEIGHTS?

The registered promoter entity is SHREE SADGURU BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SADGURU HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SADGURU HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SADGURU HEIGHTS?

The professionals named in the filing: Architect: Kuldeep Patil; Engineer: Chirag H Makani; Engineer: Aashish Paresh Desai; Chartered Accountant: K L CHURI; Chartered Accountant: MISHRA MAYEKAR & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SADGURU HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SADGURU HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SADGURU HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.