Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jan 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 49 documents Report an error

S cube centro is a Commercial project by S Cube Projects in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/333/PR/180611/001882 on 11 Jun 2018. Possession is promised by 30 Jan 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameS cube centro
  • TypeCommercial
  • Location
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/333/PR/180611/001882
  • ReraGenie IDRG-KA-13547

Builder

  • NameS Cube Projects
  • Entity typePartnership Firm
  • Authorized SignatorySanthosh Kumar Shetty

Key dates

this monthRegisteredJun 2018First promiseApr 2020Revised toJan 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Jun 2018
  • Promised completion30 Jan 2021
  • Revised completionRevised to 30 Jan 2021 (originally 30 Apr 2020)
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
S CUBE CENTRO---02323

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 12 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area820 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 50.00 lakh

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionApr 2020 → Jan 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed49

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/333/PR/180611/001882 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BANK STATEMENTFile: Statement-6401550751-20210408-184147-1[1].pdf12 Apr 2021
BANK STATEMENTFile: bank statement.pdf17 Mar 2021
EXTENSION CERTIFICATEFile: COVID EXTENSION.pdf17 Mar 2021
TEMPLATE 6File: template-6.PDF17 Mar 2021
COMMENCEMENT LETTERFile: Licence.pdf17 Mar 2021
SOLD & UNSOLD FLATSFile: Sold, unsold.pdf17 Mar 2021
AFFIDAVIT U/S 18(1)File: affidavit.PDF17 Mar 2021
CertificateFile: P DEED.PDF-
Architect Certificate for Work Completion Schedule till DateFile: Ex - 1.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Ex - 5.pdf-
CA Certificate for Funds UtilizationFile: Ex - 3.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Ex - 2.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Ex - 6.pdf-
CA Certificate for Funds required for Project CompletionFile: Ex - 4.PDF-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold, unsold.pdf-
Document 1File: Reason for delay.pdf-
License-
LICENSE-
LICENSE-
Agreement-
Agreement-
Land Document-
LICENSE-
Building Plan-
Brochure-
Building Plan-
EC-
Khatha-
Conve And Ec-
Land Document-
Building Plan-
Balance Sheet 2016 - 2017File: BS.pdf-
Balance Sheet 2015 - 2016File: BS 2016.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PL.pdf-
Audited Profit and Loss Statement 2015 - 2016File: PL 2016.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR-2016.pdf-
Form B-
Prospectus/BrochureFile: 22.jpg-
Advertisement Copy 1File: 22.jpg-
Tower Excel SheetFile: UPLOAD.xlsx-
Occupancy CertificateFile: OC.pdf-
Architect certificate for having completed the work(in format no 5)File: Centro 5 Rera.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4cc- SCube Centro signed.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: completion affidavit.pdf-
ENGINEER CERTIFICATEFile: Centro 6- Rera.pdf-
COMPLETION CERTIFICATEFile: Completion certificate.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 9 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep S cube centro on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmS cube centroOther 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: S Cube Projects

S Cube Projects has 1 registration on RERA Karnataka, including S cube centro. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if S cube centro is delayed beyond 30 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of S cube centro?

The registered promoter entity is S Cube Projects, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in S cube centro?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in S cube centro?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About S cube centro. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save S cube centro to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.