Home / Browse projects / Palghar, Maharashtra / Rustomjee Virar Avenue L1-L2 And L4 Wing C and D

Completed No litigation declared Residential / Group Housing project

Rustomjee Virar Avenue L1-L2 And L4 Wing C and D

By KEYSTONE INFRASTRUCTURE PRIVATE LIMITED

RG-MH-88203 · RERA P99000018694 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2022Possession promisedregistration recorded completed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 87%
1Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

Rustomjee Virar Avenue L1-L2 And L4 Wing C and D is a Residential / Group Housing project by KEYSTONE INFRASTRUCTURE PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000018694 on 27 Nov 2018. The registration is recorded completed; possession was promised by 31 Jul 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRustomjee Virar Avenue L1-L2 And L4 Wing C and D
  • TypeResidential / Group Housing
  • Location
    • Chikhaldongari Road
    • Avenue L1-L2
    • Dongare
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000018694
  • ReraGenie IDRG-MH-88203

Builder

  • NameKEYSTONE INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorVINCENT PATRICK RODRIGUES
  • Other registrations8 more →
  • Completed5 of 9
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2018PromisedJul 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Nov 2018
  • Promised completion31 Jul 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA180000
WING DNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 87%.

WING C56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%
WING D55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%

Progress on shared amenities30

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Designer Entrance LobbyYes0%
DG Back up for Elevators and Common area LightingYes0%
Earthquake resistant structureYes0%
ElevatorsYes0%
futsal court on podium topYes0%
multipurpose lawn on podium topYes0%
organic waster converter for recycle of wet garbageYes0%
common area lightingYes0%
common area fire sprinklersYes0%
box cricket on podium topYes0%
podium parkingYes0%
podium top landscaping and Trees plantingYes0%
Solar SystemYes0%
Staircase and lift lobbiesYes0%
walking cum jogging track on podium topYes0%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered81
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
WING C41344
WING D40444

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9695.7
Proposed, not sanctioned9,696 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch349, BUSINESS POINT BUILDING, GROUND FLOOR, ANDHERI EAST, MUMBAI 400069

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Abhikalpan Architects & Planners
EngineerM/s. J W Consultant LLP
PartnerRole in project
KEYSTONE INFRASTRUCTURE PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000011085Jul 2022 → Jul 2023

Reason as filed by the promoterTill date Promoter has completed RCC structure of the said project and other internal and external works are going on post completion of RCC structure. Further, as per the terms and conditions of sanction letter issued by our project lender (ICICI Bank), the said real estate project needs to have registration certificate validity beyond September 2022. We are therefore seeking extension of RERA registration certificate’s validity by 1 years’ period

Litigation declared1

CaseCourtStatus
7413/2017BOMBAY HIGH COURTMATTER WILL BE LISTED IN DUE COURSE

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408476Keystone Infrastructure Private LimitedSachin Mandavkar and Anr15/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 May 2022

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Virar Avenue L1 L2 and L4 Wing CD.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MAHA RERA WING CD.pdf27 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 VIRAR L WING CD SEPT 2022.pdf30 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Virar Avenue L wing C D.pdf23 Jun 2022
CERSAI detailsFile: CERSAI_REPORT- VIRAR.pdf15 Jun 2022
Details of encumbrancesFile: Encumbrance Certificate TCHFL.pdf8 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Virar Avenue L1 wing C n D OC 26042022.pdf3 May 2022
OtherFile: Virar Avenue L1 wing C n D OC 26042022.pdf3 May 2022
Declaration about Commencement CertificateFile: VIRAR L AVENUE WING C D.pdf6 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: VIRAR L AVENUE WING TOWER C D 3 files merged.pdf6 Dec 2021
Disclosure of sold/ booked inventoryFile: VIRAR L1 - L 2 Wing C D.pdf6 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 Virar avenue L wing C D.pdf30 Sep 2021
Form 2AFile: QAC MARCH 21 WING CD.pdf2 Jul 2021
Form 2AFile: QAC JUNE 21 WING C D.pdf2 Jul 2021
Details of encumbrancesFile: Virar Encumbrane Certificate 05042021.pdf7 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Virar Avenue L1 C D.pdf30 Sep 2020
Form 2AFile: RERA C n D.pdf17 Jan 2020
Building plan approvalFile: CC VIRAR DTD 5112018.pdf15 Nov 2019
Building Plan Approval (IOD)File: CC VIRAR DTD 5112018.pdf15 Nov 2019
Form 2AFile: AVENUE L WING CD.pdf7 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: KIPL L2 AVENUE C D WING.pdf30 Sep 2019
Form 2AFile: Virar L Avenue C D.pdf26 Jun 2019
Building plan approvalFile: Avenue D1 wing A n C revised VP.pdf19 Mar 2019
Building Plan Approval (IOD)File: Avenue D1 wing A n C revised VP.pdf19 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: Avenue D1 wing A n C revised VP.pdf19 Mar 2019
Building plan approvalFile: virar L1 L2 L4 LETTER DEVELOPMENT PERMISSION.pdf20 Nov 2018
Layout approvalFile: 1.pdf20 Nov 2018
Layout approvalFile: 3.pdf20 Nov 2018
Layout approvalFile: 4.pdf20 Nov 2018
Layout approvalFile: 5.pdf20 Nov 2018
Building plan approvalFile: 4.pdf20 Nov 2018
Copy of the legal title reportFile: Title Certificate Global City Avenue L1 L2 L4.pdf20 Nov 2018
Copy of Layout Approval (in case of layout)File: 1.pdf20 Nov 2018
Copy of Layout Approval (in case of layout)File: 3.pdf20 Nov 2018
Copy of Layout Approval (in case of layout)File: 4.pdf20 Nov 2018
Copy of Layout Approval (in case of layout)File: 5.pdf20 Nov 2018
Building Plan Approval (IOD)File: virar L1 L2 L4 LETTER DEVELOPMENT PERMISSION.pdf20 Nov 2018
Building Plan Approval (IOD)File: 4.pdf20 Nov 2018
Details of encumbrancesFile: Encumbrance certificate L1 L2 L4 191018.pdf6 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Permission VVCMC L1L2L4 051118.pdf6 Nov 2018
Declaration in FORM BFile: Virar Avenue L1 Wing CD.pdf6 Nov 2018
Certificates of CA (Form 3)File: CD.pdf6 Nov 2018
Proforma of Allotment letterFile: AFS RERA FINAL L1L2L4 ABR.pdf6 Nov 2018

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rustomjee Virar Avenue L1-L2 And L4 Wing C a on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Avenue L1-L23,200+ in Palghar

2 kmRustomjee Virar Avenue LCompleted 65Lapsed / revoked 42Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: KEYSTONE INFRASTRUCTURE PRIVATE LIMITED

KEYSTONE INFRASTRUCTURE PRIVATE LIMITED has 9 registrations on MahaRERA, including RUSTOMJEE VIRAR AVENUE D1 WING A AND WING B AND RETAIL BUILDING and RUSTOMJEE VIRAR AVENUE D1 WING C AND WING D. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Rustomjee Virar Avenue L1-L2 And L4 Wing C and D is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rustomjee Virar Avenue L1-L2 And L4 Wing C and D?

The registered promoter entity is KEYSTONE INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rustomjee Virar Avenue L1-L2 And L4 Wing C and D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rustomjee Virar Avenue L1-L2 And L4 Wing C and D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rustomjee Virar Avenue L1-L2 And L4 Wing C and D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rustomjee Virar Avenue L1-L2 And L4 Wing C and D?

The professionals named in the filing: Architect: M/s. Abhikalpan Architects & Planners; Engineer: M/s. J W Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rustomjee Virar Avenue L1-L2 And L4 Wing C and D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rustomjee Virar Avenue L1-L2 And L4 Wing C and D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rustomjee Virar Avenue L1-L2 And L4 Wing C a to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.