Home / Browse projects / Palghar, Maharashtra / Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building

Registration lapsed No litigation declared Others project

Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building

By KEYSTONE INFRASTRUCTURE PRIVATE LIMITED

RG-MH-79522 · RERA P99000018622 · Last updated on MahaRERA portal: 5 Jan 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 39 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2023Possession promised39 months past this date
17 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 89%
1Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building is a Others project by KEYSTONE INFRASTRUCTURE PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000018622 on 22 Nov 2018. Possession was promised by 31 Jul 2023 and is now 39 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building
  • TypeOthers
  • Location
    • Chikhaldongari Road
    • Avenue L1-L2
    • Dongare
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000018622
  • ReraGenie IDRG-MH-79522

Builder

  • NameKEYSTONE INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorVINCENT PATRICK RODRIGUES
  • Other registrations8 more →
  • Completed5 of 9
  • No longer live4 lapsed, de-registered or revoked

Key dates

39 months past promisethis monthRegisteredNov 2018First promiseJul 2022Revised toJul 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Nov 2018
  • Promised completion31 Jul 2023
  • Revised completionRevised to 31 Jul 2023 (originally 31 Jul 2022)
  • Buildings3 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA180000
WING BNA180000
Retail BuildingNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 89%.

WING A74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
WING B74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
Retail Building42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises19%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks47%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11%

Progress on shared amenities30

As on 5 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
box cricket on podium topYes0%
common area fire sprinklersYes0%
common area lightingYes0%
Designer Entrance LobbyYes0%
DG Back up for Elevators and Common area LightingYes0%
Earthquake resistant structureYes0%
ElevatorsYes0%
walking cum jogging track on podium topYes0%
Staircase and lift lobbiesYes0%
Solar SystemYes0%
podium top landscaping and Trees plantingYes0%
podium parkingYes0%
organic waster converter for recycle of wet garbageYes0%
multipurpose lawn on podium topYes0%
futsal court on podium topYes0%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered81
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
WING A40444
WING B41344

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,529 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11266.3
Proposed, not sanctioned11,266 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch349, BUSINESS POINT BUILDING GROUND FLOOR, ANDHERI EAST, MUMBAI 400 069

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Abhikalpan Architects & Planners
EngineerM/s. J W Consultant LLP
PartnerRole in project
KEYSTONE INFRASTRUCTURE PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012767Jul 2022 → Jul 2023

Reason as filed by the promoterProject validity Extension is sought only in respect of the Retail building of this RERA registration. Promoter has completed the construction of Residential buildings of this project and has received Occupation Certificate for the same. The RCC work of retail building is completed and internal finishing works are going on and Promoter shall need a years time to procure Occupation certificate for the said retail building.

Litigation declared1

CaseCourtStatus
7413/2017BOMBAY HIGH COURTMATTER WILL BE LISTED IN DUE COURSE

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000397393Keystone Infrastructure Private LimitedMohandas Morangullu Rai18/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Nov 2021

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Circular-32-Declaration about Commencement Certificate.pdf5 Jan 2023
Disclosure of sold/ booked inventoryFile: Circular-29-Disclosure of Sold Booked Inventory.pdf5 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A L AVENUE VIRAR WING AB MARCH 21.pdf2 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MAHA RERA WING AB.pdf2 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 VIRAR L WING AB SEPT 2022.pdf30 Sep 2022
CERSAI detailsFile: CERSAI_REPORT- VIRAR.pdf15 Jun 2022
Details of encumbrancesFile: Encumbrance Certificate TCHFL.pdf8 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Avenue L Wing A B OC dtd 28-10-2021 upload.pdf9 Nov 2021
OtherFile: Avenue L Wing A B OC dtd 28-10-2021 upload.pdf9 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 Virar avenue L wing A B.pdf30 Sep 2021
Form 2AFile: QAC MARCH 21 WING A B.pdf2 Jul 2021
Form 2AFile: QAC JUNE 21 WING A B.pdf2 Jul 2021
Details of encumbrancesFile: Virar Encumbrane Certificate 05042021.pdf7 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Virar Avenue L1 A B.pdf30 Sep 2020
Proforma of Allotment letterFile: L avenue wing A B revused draft 27082020.pdf27 Aug 2020
Form 2AFile: RERA A n B.pdf17 Jan 2020
Form 2AFile: A B L1 Avenue.pdf7 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: KIPL L2 AVENUE A B WING.pdf30 Sep 2019
Form 2AFile: Virar L Avenue A B.pdf26 Jun 2019
Layout approvalFile: 1.pdf16 Nov 2018
Layout approvalFile: 4.pdf16 Nov 2018
Layout approvalFile: 5.pdf16 Nov 2018
Layout approvalFile: 6.pdf16 Nov 2018
Layout approvalFile: 7.pdf16 Nov 2018
Copy of Layout Approval (in case of layout)File: 1.pdf16 Nov 2018
Copy of Layout Approval (in case of layout)File: 4.pdf16 Nov 2018
Copy of Layout Approval (in case of layout)File: 5.pdf16 Nov 2018
Copy of Layout Approval (in case of layout)File: 6.pdf16 Nov 2018
Copy of Layout Approval (in case of layout)File: 7.pdf16 Nov 2018
Building plan approvalFile: Permission VVCMC L1L2L4 051118.pdf6 Nov 2018
Copy of the legal title reportFile: Report on Title.pdf6 Nov 2018
Details of encumbrancesFile: Encumbrance certificate L1 L2 L4 191018.pdf6 Nov 2018
Building Plan Approval (IOD)File: Permission VVCMC L1L2L4 051118.pdf6 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Permission VVCMC L1L2L4 051118.pdf6 Nov 2018
Declaration in FORM BFile: Virar Avenue L1 Wing ABR.pdf6 Nov 2018
Certificates of CA (Form 3)File: VIRAR L1-L2 WING AB RETAIL 2 REVISED CERTIFICATE.pdf6 Nov 2018
Proforma of Allotment letterFile: AFS RERA FINAL L1L2L4 ABR.pdf6 Nov 2018

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rustomjee Virar Avenue L1-L2 and L4 Wing A B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Avenue L1-L23,200+ in Palghar

2 kmRustomjee Virar Avenue LCompleted 66Lapsed / revoked 41Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: KEYSTONE INFRASTRUCTURE PRIVATE LIMITED

KEYSTONE INFRASTRUCTURE PRIVATE LIMITED has 9 registrations on MahaRERA, including RUSTOMJEE VIRAR AVENUE D1 WING A AND WING B AND RETAIL BUILDING and RUSTOMJEE VIRAR AVENUE D1 WING C AND WING D. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building is delayed beyond 31 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building?

The registered promoter entity is KEYSTONE INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building?

The professionals named in the filing: Architect: M/s. Abhikalpan Architects & Planners; Engineer: M/s. J W Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rustomjee Virar Avenue L1-L2 and L4 Wing A B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.