Home / Browse projects / Mumbai Suburban, Maharashtra / Ruparel Pride
Ruparel Pride
By Shree Siddhivinayak Classic Construction Private Limited
RG-MH-03158 · RERA P51800020602 · Last updated on MahaRERA portal: 28 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 9 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ruparel Pride is a Residential / Group Housing project by Shree Siddhivinayak Classic Construction Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800020602 on 26 Apr 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 9 complaints are on record with the regulator.
At a glance
Project
- NameRuparel Pride
- TypeResidential / Group Housing
- Location
- Nehru Nagar
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- RERA no.P51800020602
- ReraGenie IDRG-MH-03158
Builder
- NameShree Siddhivinayak Classic Construction Private Limited
- Entity typeCompany
- CINU45201MH2015PTC267518
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsAmit Ruparel, Parikshit Sharma, Pradeep Ahire
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Apr 2019
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed43 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ruparel Pride | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
Ruparel Pride: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 28 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Shree Siddhivinayak Classic Construction Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterM/s. Shree Siddhivinayak Classic Construction Pvt. Ltd., the promoter of Ruparel Pride (RERA Registration No. P51800020602), respectfully submits a request for an extension of the project completion date to December 31, 2025 due to unforeseen regulatory constraints. Project Overview Ruparel Pride is a single high-rise residential project initially planned with a stilt + 22 floors and a height of 77.21 meters AMSL. However, height restrictions by the Airports Authority of India (AAI) limited it to 56.90 meters AMSL (16 floors). The commencement certificate for the stilt floor was issued on Apri
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000089873 | RAMKRISHNA SHRIDHAR PHANSEKAR | MS RE BUILT | 09/07/2019 |
| CC006000000171535 | Mayur C Shikhare | Shree Siddhivinyak Classic Construction Pvt. Ltd. | 13/11/2019 |
| CC006000000395904 | jamuna s charania | Ruparel reality | 23/05/2023 |
| CC006000000251545 | NEHRU NAGAR SHANTI BHUVAN CHSL SOCIETY | AMIT MAHENDRA RUPAREL | 22/06/2022 |
| CC006000000261936 | Dr Jayaben S Charania | Ruparel Realty | 15/07/2022 |
| CC006000000292477 | Dr Jayaben S Charania | Ruparel realty | 26/08/2022 |
| CC006000000303109 | Dr Jayaben S Charania | Santokben Charania, Jamuna Charania | 19/10/2022 |
| CC12602884 | Swapnil Subhash Bhalerao | Shree Siddhivinayak Classic Construction Private Limited | 16/05/2026 |
| CC12603469 | HANSA AMIT MAKWANA | Shree Siddhivinayak Classic Construction Private Limited | 05/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Apr 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Apr 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed43
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Ruparel Pride-Form-1 31032025.pdf | 28 May 2025 |
| Form 2File: Ruparel Pride Form 2 31032025.pdf | 28 May 2025 |
| Form 3File: Form 3 Ruparel Pride 31032025 Compressed.pdf | 28 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Ruparel Pride Sold Unsold Inventory 31032025.pdf | 28 May 2025 |
| Self-declaration of Quarterly ProgressFile: Ruparel Pride Self Declaration Letter.pdf | 28 May 2025 |
| Disclosure of sold/ booked inventoryFile: Ruparel Pride Sold Unsold Inventory 31122024.pdf | 11 Mar 2025 |
| CERSAI detailsFile: CERSAI Search Report SSCCPL.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ruparel Pride Form 2A FY 2023 24.pdf | 11 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Ruparel Pride A22-M23.pdf | 8 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Ruparel Pride A23-M24.pdf | 8 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: 1 Legal and Financial Encumbrances Pride F.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Ruparel Pride Dec 2024 signed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Ruparel Pride Final.pdf | 18 Jan 2025 |
| CERSAI detailsFile: 6 CERSAI Declaration Ruparel Pride F.pdf | 18 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about all RERA Designated Bank Accounts (Format A).pdf | 18 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report to Allotment Letter.pdf | 18 Jan 2025 |
| Details of encumbrances concerned to LegalFile: 1 Legal and Financial Encumbrances Pride F.pdf | 18 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf | 18 Jan 2025 |
| Proforma of Agreement for saleFile: Ruparel Pride AFS Final.pdf | 18 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: 1 Legal and Financial Encumbrances-Pride F.pdf | 15 Jan 2025 |
| Declaration in FORM BFile: 3 Form B Afifdavit cum declaration Shree Siddhivinayak Classic Construction Pvt Ltd Pride | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 Architect Certificate 31 12 24 Pride.pdf | 15 Jan 2025 |
| Declaration about Commencement CertificateFile: 2 Format D Declartion about CC Ruparel Pride F.pdf | 15 Jan 2025 |
| CERSAI detailsFile: 6 CERSAI Declaration Ruparel Pride F.pdf | 15 Jan 2025 |
| Details of encumbrances concerned to LegalFile: 1 Legal and Financial Encumbrances-Pride F.pdf | 15 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 8 Disclosure of Interest -Pride F.pdf | 15 Jan 2025 |
| CERSAI detailsFile: CERSAI REPORT RUPAREL PRIDE.pdf | 4 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Pride 2019-20.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Pride 2020-21.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Pride 2021-22.pdf | 24 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: PrideCC.pdf | 29 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A Pride compressed.pdf | 3 Feb 2020 |
| Building plan approvalFile: IOA.pdf | 19 Apr 2019 |
| Building Plan Approval (IOD)File: IOA.pdf | 19 Apr 2019 |
| Declaration in FORM BFile: Form-B (Pride)_compressed.pdf | 19 Apr 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 19 Apr 2019 |
| Proforma of Allotment letterFile: allotment Letter.pdf | 19 Apr 2019 |
| Layout approvalFile: Lay Out_compressed.pdf | 18 Apr 2019 |
| Copy of the legal title reportFile: Tital Certificate-compressed.pdf | 18 Apr 2019 |
| Details of encumbrancesFile: Encrumbrance.pdf | 18 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: Lay Out_compressed.pdf | 18 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-Pride.pdf | 18 Apr 2019 |
| PAN CardFile: PAN of SSCCPL.pdf | 13 Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 43 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Ruparel Pride on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla6,700+ in Mumbai Suburban
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Ruparel Crest
BHARAT MAHAN DEVELOPERS & BUILDERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
See every Mumbai Suburban project, with the district possession charts
Builder: Shree Siddhivinayak Classic Construction Private Limited
Shree Siddhivinayak Classic Construction Private Limited has 3 registrations on MahaRERA, including Ruparel Pride and Ruparel Primero. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Ruparel Pride shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Ruparel Pride is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ruparel Pride?
The registered promoter entity is Shree Siddhivinayak Classic Construction Private Limited, a company as per the filing. Its CIN U45201MH2015PTC267518 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ruparel Pride?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ruparel Pride?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ruparel Pride?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Ruparel Pride?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback