Home / Browse projects / Raigarh, Maharashtra / RUKHMINI COMPLEX 1
RUKHMINI COMPLEX 1
RG-MH-19058 · RERA P52000078090 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RUKHMINI COMPLEX 1 is a Others project by NAGESH ANNASAHEB SURVASE in Raigarh, Maharashtra, registered with MahaRERA as P52000078090 on 25 Nov 2024. Possession is promised by 31 Dec 2028. 12 of the 50 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameRUKHMINI COMPLEX 1
- TypeOthers
- Location
- PLOT NO 91 SECTOR 08 PUSHPAK NAGAR
- DAPOLI PANVEL
- Dapoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000078090
- ReraGenie IDRG-MH-19058
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Nov 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed55 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RUKHMINI COMPLEX 1 | NA | 6 | 6 | 42 | 8 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.
RUKHMINI COMPLEX 1: 65% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership15
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VANITA RAMESH PATIL | Vaghivali | Raigarh |
| LAHU BALARAM SURATE | Vaghivali | Raigarh |
| MINABAI BALARAM SURATE | Vaghivali | Raigarh |
| SUSHMA VASANT PARDESHI | Chinchpada | Raigarh |
| RAMDAS KRISHNA SURATE | Vaghivali | Raigarh |
| BHARAT KRISHNA SURATE | Vaghivali | Raigarh |
| SMT SUMAN @ MANISHA MADAN KENI | Vaghivali | Raigarh |
| ANIT DILAKHUSH NAIK | Vaghivali | Raigarh |
| GANGABAI BABURAO SURATE | Vaghivali | Raigarh |
| SANGITA DILIP BHAGAT | Vaghivali | Raigarh |
| SHARMILA PRAQBHAKAR GHATE | Vaghivali | Raigarh |
| PUSHPA ANKUSH SURATE | Vaghivali | Raigarh |
| VAISHALI BALARAM SURATE @ VAISHALI RAJESH BENARE | Vaghivali | Raigarh |
| SANJAY BALIRAM SURATE | Vaghivali | Raigarh |
| BALIRAM SHANTARAM SURTE | Vaghivali | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RUKHMINI COMPLEX 1 | NA | Rs 5.50 cr | Rs 4.85 cr |
| - | NA | Rs 20.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TRIARCH DESING STUDIO |
| Engineer | STRUCON CONSULTING ENGINEERS |
| Chartered Accountant | MADANE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| OM CIVIL CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Oct 2024
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 March 26 - Rukmini Complex.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: Rukmini Complex 1 Form 2 March 26.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Mar 2026_Rukmini Complex.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 DECEMBER 2025 - Rukmini Complex.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: 91-8 P5 Form 2 December 2025.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: Form 3 December 2025_ Rukmini Complex 1.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 2025 - Rukmini Complex.pdf | 21 Nov 2025 |
| Withdrawal Update Form 2File: 91-8 P3 FORM-2 ( Sept-2025 ).pdf | 21 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Sept 2025_ Rukmini Complex 1.pdf | 21 Nov 2025 |
| Form 1File: Form 1 Dec 2024-Rukmini Complex.pdf | 13 Aug 2025 |
| Form 2File: 91-8 P1 FORM-2 ( DEC-2024 ).pdf | 13 Aug 2025 |
| Form 3File: Form 3 Dec 2024_Rukmini Complex 1.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DECLARATION DEC 2024.pdf | 13 Aug 2025 |
| Form 1File: Form 1 March 2025 - Rukmini Complex.pdf | 13 Aug 2025 |
| Form 2File: 91-8 P2 FORM-2 ( MARCH-2025 ).pdf | 13 Aug 2025 |
| Form 3File: Form 3 Mar 2025_Rukmini Complex.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DECLARATION MARCH 2025.pdf | 13 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 21 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FARMAT A ACCOUNT DECLERATION.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLERATION PROMOTER FINANCE 1.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLERATION UNSQUERED FINANCE .pdf | 18 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: ENCNB FINANCE.pdf | 14 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: land owner decleration.pdf | 14 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: DECLERATION PROMOTER FINANCE.pdf | 14 Nov 2024 |
| Details of encumbrances concerned to LegalFile: ENCNB FINANCE.pdf | 14 Nov 2024 |
| Details of encumbrances concerned to LegalFile: DECLERATION PROMOTER FINANCE.pdf | 14 Nov 2024 |
| Details of encumbrances concerned to LegalFile: land owner decleration.pdf | 14 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: farmat bb rukhmini.pdf | 14 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: devidition afs rukhmini COMPLEX 1.pdf | 30 Oct 2024 |
| Other - FinanceFile: DECLATARION OF ENCONBANCES OF FINANCE.pdf | 23 Oct 2024 |
| Other - TechnicalFile: decleration landowner for oc rukhmini.pdf | 23 Oct 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 23 Oct 2024 |
| Building plan approvalFile: PLAN COPY.pdf | 16 Oct 2024 |
| Layout approvalFile: PLAY APPROVAL CIDCO.pdf | 16 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: encomb.pdf | 16 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: PLAY APPROVAL CIDCO.pdf | 16 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY.pdf | 16 Oct 2024 |
| CERSAI detailsFile: CERSAI.pdf | 16 Oct 2024 |
| Details of encumbrances concerned to LegalFile: encomb.pdf | 16 Oct 2024 |
| Proforma of Allotment letterFile: ALLOTMENT NEW .pdf | 13 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf | 13 Oct 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 12 Oct 2024 |
| Copy of the legal title reportFile: 2 Copy of the legal title report.pdf | 12 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Allotment letter .pdf | 12 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: DECL AL.pdf | 26 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: DECLERATION ENCUMBANCE.pdf | 26 Jul 2024 |
| PAN CardFile: adhar nagesh survashe.pdf | 24 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: DECLERATION ENCUMBANCE.pdf | 24 Jul 2024 |
| Declaration in FORM BFile: from B promotor.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf | 24 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 24 Jul 2024 |
| Other - LegalFile: TRIPARTY AGREEMENT.pdf | 24 Jul 2024 |
| Declaration about Commencement CertificateFile: DECLERATION CC.pdf | 24 Jul 2024 |
| Details of encumbrances concerned to LegalFile: DECLERATION ENCUMBANCE.pdf | 24 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest Other Real Estate Orga2.pdf | 24 Jul 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| RUKHMINI COMPLEX 1 | PLOT NO 91 SECTOR 08 PUSHPAK NAGAR DAPOLI PANVEL RAIGAD | 50 | Ongoing | Dec 2028 | Not due yet |
| JAY VITHAL COMPLEX | PLOT NO 299 SECTOR R-3 PUSHPAK NODE VADGHAR | 1 | Completed | Jan 2023 | Dec 2022 |
| UBHA VITEVARI | PLOT NO 97 SECTOR R3 PUSHPAK NODE VADGHAR PANVEL | 1 | Completed | Oct 2022 | Aug 2022 |
| RUKHMINI COMPLEX | PLOT NO 88C SECTOR R3 | 1 | Completed | Jan 2022 | Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RUKHMINI COMPLEX 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAPOLI PANVEL5,900+ in Raigarh
Filed coordinates, straight-line distance. 143 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: NAGESH ANNASAHEB SURVASE
NAGESH ANNASAHEB SURVASE has 2 registrations on MahaRERA, including HARI VITTHAL COMPLEX 1 and RUKHMINI COMPLEX 1. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if RUKHMINI COMPLEX 1 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RUKHMINI COMPLEX 1?
The registered promoter entity is NAGESH ANNASAHEB SURVASE, a proprietor as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RUKHMINI COMPLEX 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RUKHMINI COMPLEX 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RUKHMINI COMPLEX 1?
The professionals named in the filing: Architect: TRIARCH DESING STUDIO; Engineer: STRUCON CONSULTING ENGINEERS; Chartered Accountant: MADANE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RUKHMINI COMPLEX 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback