Rugveda-1

By Shalini Nagoraoji Choudhary

RG-MH-14764 · RERA P50500046308 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
2 of 94Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Rugveda-1 is a Plotted project by Shalini Nagoraoji Choudhary in Nagpur, Maharashtra, registered with MahaRERA as P50500046308 on 22 Jun 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 92 of the 94 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRugveda-1
  • TypePlotted
  • Location
    • Kh No 152/1A Part
    • P S K No 41
    • Banwadi
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500046308
  • ReraGenie IDRG-MH-14764

Builder

  • NameShalini Nagoraoji Choudhary
  • Entity typeIndividual

Key dates

7 months past promisethis monthRegisteredJun 2022First promiseMar 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Jun 2022
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
  • BuildingsNot stated in filing
  • Documents filed89 files

Current status

98%92 of 94 units booked

Figures as on 15 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes97%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,575 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Mar 2026

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority (NMRDA)

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWardha Road, Nagpur

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR DEVA BORKAR
ArchitectWIDEA ARCHITECTS PVT LTD
EngineerAR DEVA BORKAR
EngineerANKIT ASHTANKAR
EngineerMANOJ OMKAR
Chartered AccountantAMIT A AGRAWAL
Chartered AccountantASHISH LAXMINARAYAN AGARWAL
Chartered AccountantSumit R Chandwani
PartnerRole in project
Shalini Nagoraoji Choudhary-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500028063Mar 2025 → Mar 2026

Reason as filed by the promoter.DUE TO UNFORSEEN CIRCUMSTANCES, ELECTRICAL AND OTHER WORKS ARE PENDING.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect certificate March 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate March 2026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 CA certificate March 2026.pdf15 May 2026
Form 1File: Form 1 Architect certificate Dec 25.pdf9 Feb 2026
Form 2File: Form 2 Engineer Certificate Dec 25.pdf9 Feb 2026
Form 3File: Form 3 CA Certificate Dec 25.pdf9 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dec 25.pdf9 Feb 2026
Form 1File: Form 1 Architect Certificate Sept 25.pdf26 Nov 2025
Form 2File: Form 2 Engineer Certificate Sept 25.pdf26 Nov 2025
Form 3File: Form 3 CA Certificate Sept 25.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory sept 25.pdf26 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A FINAL RUGVEDA.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: Rugveda From 5 FY 24-25 (1).pdf11 Oct 2025
Form 1File: Form 1 Architects certificate.pdf12 Aug 2025
Form 2File: Form 2 Engineer Certificate.pdf12 Aug 2025
Form 3File: Form 3 CA Certificate.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf12 Aug 2025
Form 1File: Architect certificate Form 1.pdf1 Jul 2025
Form 2File: Engineer certificate Form 2.pdf1 Jul 2025
Form 3File: CA Certificate Form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf1 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca certificate mar25 Rugveda 1.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOK.pdf30 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24.pdf15 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 24.pdf15 Apr 2025
Declaration in FORM BFile: form b.pdf30 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Rugveda - Dec 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Rugveda - Dec 24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Rugveda - Dec 24.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: 5 Sold Booked Inv - Rugveda - Dec 24.pdf7 Feb 2025
Declaration about Commencement CertificateFile: 4 Form D - Rugveda - Dec 24.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Rugveda - Sep 24.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Rugveda - Sep 24.pdf15 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Rugveda - Sep 24.pdf15 Nov 2024
Disclosure of sold/ booked inventoryFile: 5 Sold Booked Inv - Rugveda - Sep 24.pdf15 Nov 2024
Declaration about Commencement CertificateFile: 4 Form D - Rugveda - Sep 24.pdf15 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Form 2A - Rugveda - FY 23-24.pdf15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Form 5 - Rugveda-1 - FY 23-24.pdf15 Nov 2024
Declaration about Commencement CertificateFile: 4 Form D - Rugveda - June 24.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Rugveda - June 24.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Rugveda - June 24.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Rugveda - June 24.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory - Rugveda_compressed.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA CERT RUGVEDA1 MAR24.pdf3 Jun 2024
Declaration about Commencement CertificateFile: FORM D (MAR 24).pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT (MAR 24).pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT (MAR 24).pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY(MAR 24).pdf26 Apr 2024
Declaration about Commencement CertificateFile: 4 Form D - Rugveda - Dec 23.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Rugveda - Dec 23.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Rugveda - Dec 23.pdf8 Feb 2024
Disclosure of sold/ booked inventoryFile: 5 Sold Booked Inventory - Rugveda - Dec 23.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Rugveda - Dec 23.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Sep-23 2_merged 1_compressed.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Rugveda - 22-23.pdf18 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Rugveda - 22-23.pdf18 Dec 2023
Declaration about Commencement CertificateFile: 4 Form D - Sept 23.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 ARCH CERT SEP 2023.pdf27 Nov 2023
Disclosure of sold/ booked inventoryFile: 5 Sold Booked Inv - Sept 23.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Rugveda - Sept 23.pdf27 Nov 2023
Declaration about Commencement CertificateFile: 4 Form D June 23.pdf23 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 June 23.pdf23 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 June 23.pdf23 Aug 2023
Disclosure of sold/ booked inventoryFile: 5 Sold Booked Inventory June 23.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rugveda- Q3 - 22-23_compressed.pdf14 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rugveda - Q4 - 22-23_compressed.pdf14 Jun 2023
Declaration about Commencement CertificateFile: FORM D dec 2022 qtr.pdf9 Jun 2023
Declaration about Commencement CertificateFile: FORM D march 2023 qtr.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dec 2022 qtr.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march 2023 qtr.pdf9 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dec 2022 qtr.pdf9 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 march 2023 qtr.pdf9 Jun 2023
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY dec 2022 qtr.pdf9 Jun 2023
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY march 2023 qtr.pdf9 Jun 2023
Layout approvalFile: 4 Copy of Layout Approval (in case of layout).pdf18 Jun 2022
Building plan approval or NA orderFile: 5 Building Plan Approval _ NA Order for plotted development.pdf18 Jun 2022
PAN CardFile: 1 PAN Card.pdf18 Jun 2022
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf18 Jun 2022
Details of encumbrancesFile: 3 Details of encumbrances.pdf18 Jun 2022

How this compares with Nagpur

98%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rugveda-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Banwadi2,800+ in Nagpur

Builder: Shalini Nagoraoji Choudhary

Shalini Nagoraoji Choudhary has 1 registration on MahaRERA, including Rugveda-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that Rugveda-1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Rugveda-1 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rugveda-1?

The registered promoter entity is Shalini Nagoraoji Choudhary, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rugveda-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rugveda-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rugveda-1?

The professionals named in the filing: Architect: AR DEVA BORKAR; Architect: WIDEA ARCHITECTS PVT LTD; Engineer: AR DEVA BORKAR; Engineer: ANKIT ASHTANKAR; Engineer: MANOJ OMKAR; Chartered Accountant: AMIT A AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rugveda-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rugveda-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rugveda-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.