Home / Browse projects / Pune, Maharashtra / RUDRA SAMRUDDHI

Registered No litigation declared Residential / Group Housing project

RUDRA SAMRUDDHI

By SHIVRUDRA CONSTRUCTIONS

RG-MH-80312 · RERA P52100015465 · Last updated on MahaRERA portal: 21 Jul 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 106 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 106 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

RUDRA SAMRUDDHI is a Residential / Group Housing project by SHIVRUDRA CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100015465 on 27 Feb 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 106 months from the original filing.

At a glance

Project

  • NameRUDRA SAMRUDDHI
  • TypeResidential / Group Housing
  • Location
    • PUNE SOLAPUR ROAD
    • URULI KANCHAN
    • Haveli
    • Pune
    • 412202
  • Pincode412202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015465
  • ReraGenie IDRG-MH-80312

Builder

  • NameSHIVRUDRA CONSTRUCTIONS
  • Entity typePartnership
  • PartnersGAJANAN SAHEBRAO HARPALE, YASHWANT NIVRUTTI CHAVAN, SACHINKUMAR SHIVAJIRAO KADAM

Key dates

this monthRegisteredFeb 2018First promiseFeb 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Feb 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 1 Feb 2019)
  • Buildings2 building records
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA50000
B WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

A WING74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
B WING74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 21 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A WING11
B WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area627 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1234.91
Proposed, not sanctioned1,235 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE SASWAD ROAD, FURSUNGI,PUNE-412308

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATIT ADMULWAR
PartnerRole in project
SHIVRUDRA CONSTRUCTIONS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005421Feb 2019 → Apr 2020

Reason as filed by the promoterTHERE WAS DISPUTE BETWEEN LANDOWNER AND DEVELOPER

EXT52100014010Feb 2019 → Mar 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 100% allottees for purpose of extension of RERA registration period of the said project

EXT52100024974Feb 2019 → Dec 2027

Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by a combination of procurement issues, site conditions, and coordination challenges. By implementing the outlined action plan, we aim to mitigate these delays and move forward efficiently. However, we assure you that our utmost priority is to safeguard the interests of the allottees and ensure the successful completion of the project. In accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. We have consent of 75% allottees for purpose of extension of RERA registration

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 23 - Rudra Samruddhi.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23 - Rudra Samruddhi.pdf21 Jul 2023
Certificates of CA (Form 3)File: Form 3 Mar 23 - Rudra Samruddhi.pdf21 Jul 2023
Certificates of CA (Form 3)File: Form 3 June 23 - Rudra Samruddhi.pdf21 Jul 2023
Declaration about Commencement CertificateFile: Format D For Rudra Samruddhi.pdf19 Jul 2023
Declaration in FORM BFile: FORM -B (Promoter) Rudra Samruddhi.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - December' 2022.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March' 2023.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-2020.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-2021.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-2022.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-2023.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: Circular 29 For Rudra Samruddhi.pdf19 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - 2017-2018.pdf19 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - 2018-2019.pdf19 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 2019-2020.pdf19 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 2020-2021.pdf19 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021-2022.pdf19 Jul 2023
Building plan approvalFile: Building Plan Approval 1.pdf17 Feb 2018
Building plan approvalFile: Approval of building.pdf17 Feb 2018
Layout approvalFile: Building Plan Approval 1.pdf17 Feb 2018
Copy of the legal title reportFile: Search and Title Report 1.pdf17 Feb 2018
Copy of the legal title reportFile: Search and Title 2.pdf17 Feb 2018
Details of encumbrancesFile: Encumbrances Certificate.pdf17 Feb 2018
Copy of Layout Approval (in case of layout)File: Building Plan Approval 1.pdf17 Feb 2018
Building Plan Approval (IOD)File: Building Plan Approval 1.pdf17 Feb 2018
Building Plan Approval (IOD)File: Approval of building.pdf17 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate17022018-ilovepdf-compressed (1).pdf17 Feb 2018
Declaration in FORM BFile: Declaration in Form B.pdf17 Feb 2018
Certificates of CA (Form 3)File: Certificate of CA.pdf17 Feb 2018
Proforma of Allotment letterFile: Letter of Allotment And Draft of Agreement.pdf17 Feb 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 106 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUDRA SAMRUDDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near URULI KANCHAN13,700+ in Pune

2 kmRUDRA SAMRUDDHICompleted 5Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: SHIVRUDRA CONSTRUCTIONS

SHIVRUDRA CONSTRUCTIONS has 1 registration on MahaRERA, including RUDRA SAMRUDDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RUDRA SAMRUDDHI is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUDRA SAMRUDDHI?

The registered promoter entity is SHIVRUDRA CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUDRA SAMRUDDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUDRA SAMRUDDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUDRA SAMRUDDHI?

The professionals named in the filing: Architect: ATIT ADMULWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUDRA SAMRUDDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUDRA SAMRUDDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUDRA SAMRUDDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.