Registered No litigation declared Mixed project

RUDRA DREAM CITY

By SAI ASHIRWAD

RG-MH-33170 · RERA PM1270002500392 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
2 of 18Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
202 of 231Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 13 documents Report an error

RUDRA DREAM CITY is a Mixed project by SAI ASHIRWAD in Raigarh, Maharashtra, registered with MahaRERA as PM1270002500392 on 28 Jul 2025. Possession is promised by 30 Jun 2030. 29 of the 231 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete.

At a glance

Project

  • NameRUDRA DREAM CITY
  • TypeMixed
  • Location
    • SURVEY NO 9/5
    • PISARVE ROAD TALOJE MAJKUR
    • Taloje Majkur
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1270002500392
  • ReraGenie IDRG-MH-33170

Builder

  • NameSAI ASHIRWAD
  • Entity typePartnership
  • GSTIN27AFIFS2127K1ZR
  • PartnersMOHAN KUMAR JH, ANITA GAJRAJ SINGH RATHORE

Key dates

this monthRegisteredJul 2025PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jul 2025
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed13 files

Current status

13%29 of 231 units booked
4.5%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUDRA DREAM CITYBUILDING NO 11413701888
RUDRA DREAM CITYBUILDING NO 214121430143

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

RUDRA DREAM CITY · wing BUILDING NO 111%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RUDRA DREAM CITY · wing BUILDING NO 211%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed216

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots216
Stilt / Ground121
Podiums / Upper Parking Floor95
BuildingStilt / GroundPodiums / Upper Parking FloorTotal
RUDRA DREAM CITY BUILDING NO 14363106
RUDRA DREAM CITY BUILDING NO 27832110

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,590 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI15434.95
Proposed, not sanctioned12,527 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No.1 to 05, Ground Floor, Kinjal Paradise. Plot No. 43, Sector.35D, Kharghar, Navi Mumbai.410210, Maharashtra
Estimated costRs 36.08 cr
Cost incurredRs 1.64 cr
Work done4.55%
BuildingWingEstimatedIncurred
RUDRA DREAM CITYBUILDING NO 2Rs 18.85 crRs 90.20 lakh
RUDRA DREAM CITYBUILDING NO 1Rs 15.42 crRs 73.80 lakh
-NARs 1.80 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEETAL PRASHANT NEMANE
EngineerBAHUBALI TATYASO DHAMANE
Chartered AccountantDEEPESH ASHWIN SHAH
Chartered AccountantASHOK TATYASA UPADHYE
PartnerRole in project
SAI ASHIRWAD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed13

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate SA Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate SA Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate SA Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate SA.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate SA.pdf16 Jan 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf30 Oct 2025
Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf30 Oct 2025
Withdrawal Update Form 3File: Form-3 CA Certificate.pdf30 Oct 2025
Building plan approvalFile: Approved Plan for Upload-1-4.pdf23 Jul 2025
Building plan approvalFile: Approved Plan for Upload-5-8.pdf23 Jul 2025
Declaration and undertaking (Annexure A)File: 12 Annexure A.pdf11 Jul 2025
Building plan approvalFile: 7 No Layout Certificate.pdf23 Jun 2025

How this compares with Raigarh

13%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUDRA DREAM CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PISARVE ROAD TALOJE MAJKUR5,900+ in Raigarh

2 kmRUDRA DREAM CITYCompleted 62Lapsed / revoked 35Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: SAI ASHIRWAD

SAI ASHIRWAD has 1 registration on MahaRERA, including RUDRA DREAM CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if RUDRA DREAM CITY is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUDRA DREAM CITY?

The registered promoter entity is SAI ASHIRWAD, a partnership as per the filing. Its GSTIN 27AFIFS2127K1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUDRA DREAM CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUDRA DREAM CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUDRA DREAM CITY?

The professionals named in the filing: Architect: SHEETAL PRASHANT NEMANE; Engineer: BAHUBALI TATYASO DHAMANE; Chartered Accountant: DEEPESH ASHWIN SHAH; Chartered Accountant: ASHOK TATYASA UPADHYE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUDRA DREAM CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUDRA DREAM CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUDRA DREAM CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.