Home / Browse projects / Thane, Maharashtra / RUCHA VATIKA D Wing ORCHID E Wing IRIS

Registered No litigation declared Residential / Group Housing project

RUCHA VATIKA D Wing ORCHID E Wing IRIS

By MILAN HOUSING COMPLEX PVT LTD

RG-MH-05255 · RERA P51700053980 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
71 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

RUCHA VATIKA D Wing ORCHID E Wing IRIS is a Residential / Group Housing project by MILAN HOUSING COMPLEX PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700053980 on 18 Dec 2023. Possession is promised by 31 Dec 2028. 6 of the 77 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameRUCHA VATIKA D Wing ORCHID E Wing IRIS
  • TypeResidential / Group Housing
  • Location
    • OPP MONAM HEIGHTS BUILDING
    • SCHOOL
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700053980
  • ReraGenie IDRG-MH-05255

Builder

  • NameMILAN HOUSING COMPLEX PVT LTD
  • Entity typeCompany
  • DirectorsBipinchandra Ladhabhai Patel, Ladhabhai Vishram Patel, Ramniklal Naran Patel
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed89 files

Current status

8%6 of 77 units booked
27.7%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing DNA8828028
Wing ENA8849049

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

Wing D66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
Wing D22
Wing E22

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,516 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI4185.91
Proposed, not sanctioned4,186 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRajshree Plaza LBS Marg Maharashtra India
Estimated costRs 15.33 cr
Cost incurredRs 4.25 cr
Work done27.74%
BuildingWingEstimatedIncurred
Wing ENARs 9.41 crRs 1.98 cr
Wing DNARs 4.75 crRs 2.28 cr
-NARs 1.18 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKUR A SHETYE
ArchitectSPACE ENVIRO ARCHITECTS
EngineerSURENDRA VELJI PATEL
EngineerS V PATEL & ASSOCIATES
Chartered AccountantHEENA B MOMAYA
Chartered AccountantANJU PALAN & CO
PartnerRole in project
MILAN HOUSING COMPLEX PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Signed Form 1.pdf19 May 2026
Withdrawal Update Form 2File: Signed Form 2.pdf19 May 2026
Withdrawal Update Form 3File: FORM 3.pdf19 May 2026
Withdrawal Update Form 1File: Form 1 Singed copy Dec 25.pdf13 Feb 2026
Withdrawal Update Form 2File: Form 2 Signed copy Dec 25.pdf13 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf13 Feb 2026
Form 1File: Form 1.pdf8 Dec 2025
Form 2File: Form 2.pdf8 Dec 2025
Form 3File: Form 3 with Sign.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Dilsclouser of Sold unsold units.pdf8 Dec 2025
Form 1File: Architect Form 1_ D_E.pdf20 Sep 2025
Form 2File: Engineer Form 2_D_E.pdf20 Sep 2025
Form 3File: FORM 3.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Dilsclouser of Sold unsold units.pdf20 Sep 2025
Form 1File: Form 1 D wing_merged.pdf6 Aug 2025
Form 2File: Form 2 D wing_merged.pdf6 Aug 2025
Form 3File: Form-3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Dilsclouser of Sold unsold units.pdf6 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate _D Wing Form 1.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate E Wing_Form 1.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate FORM-3.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate D _Form 2.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate E _Form 2.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ WING - D.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ WING - E.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ WING - D.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ WING - E.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ WING - D.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ WING - E.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ WING - D.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ WING - E.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 D - Wing Orchid.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 E- wing Iris.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D-wing Orchid.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 E-wing Iris.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D-wing Orchid.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 E-wing Iris.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 D - Wing Orchid.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 E- wing Iris.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_D Wing.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_E Wing.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_D Wing.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_E Wing.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechture Certificate- D Wing.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate- E Wing.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: STRUCTURAL ENGGINEER - RERA CERTIFICATE OF WING - D.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: STRUCTURAL ENGGINEER RERA CERTIFICATE OF WING - E.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Milan Housing Complex_FORM 3.pdf22 Feb 2024
Other - TechnicalFile: 1 Plan Copy-1-2_final_compressed.pdf9 Dec 2023
Other - TechnicalFile: 2 Plan Copy-3_final.pdf9 Dec 2023
Declaration about Commencement CertificateFile: Revised Declaration Format D.pdf7 Dec 2023
Other - TechnicalFile: naturally Sub-divided.pdf7 Dec 2023
Other - TechnicalFile: Stand Alone.pdf7 Dec 2023
Proforma of Agreement for saleFile: MILAN HOUSING AGREEMENT.pdf17 Nov 2023
Building plan approvalFile: 1 Plan Copy-1-2_final.pdf11 Sep 2023
Building plan approvalFile: 2 Plan Copy-3_final.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Plan Copy-1-2_final.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Plan Copy-3_final.pdf11 Sep 2023
Other - TechnicalFile: 4 Declaration for Blanket Consent.pdf11 Sep 2023
Other - TechnicalFile: 3 Declaration - done.pdf11 Sep 2023
Copy of the legal title reportFile: Legal title report_Final_11zon.pdf18 Jul 2023
Proforma of Allotment letterFile: Milan Housing Allotment Letter.pdf18 Jul 2023
Deviation Report with respect to Allotment letterFile: Declaration for Allotment Letter Deviation.pdf20 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Declaration for Model Copy Agreement'.pdf20 Jun 2023
Other - LegalFile: Conveyance Deed_11zon.pdf20 Jun 2023
Other - LegalFile: Declaration for Stand Alone Project.pdf20 Jun 2023
Other - LegalFile: Declaration.pdf20 Jun 2023
Other - LegalFile: 10 712 Milan Housing.pdf20 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration for No Legal Encumbrance.pdf25 May 2023
Details of encumbrances concerned to LegalFile: Declaration for No Legal Encumbrance.pdf25 May 2023
Layout approvalFile: Plan layout.pdf19 May 2023
Copy of Layout Approval (in case of layout)File: Plan layout.pdf19 May 2023
CERSAI detailsFile: Declaration for No CERSAI.pdf6 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200267237578_For_Asset_Based_Search_28_04_2023_12_39_43_985.pdf6 May 2023
Commencement Certificates / NA Order for plotted developmentFile: 8_KDMC-CC PART 2.pdf27 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
ASTER A WING RUCHA VATIKAP51700005590Titwala, ThaneAug 2017Certificate SignedMay 2018Jan 2018

How this compares with Thane

8%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUCHA VATIKA D Wing ORCHID E Wing IRIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SCHOOL7,600+ in Thane

Builder: MILAN HOUSING COMPLEX PVT LTD

MILAN HOUSING COMPLEX PVT. LTD. has 3 registrations on MahaRERA, including ASTER A WING RUCHA VATIKA and RUCHA VATIKA TULIP C WING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RUCHA VATIKA D Wing ORCHID E Wing IRIS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUCHA VATIKA D Wing ORCHID E Wing IRIS?

The registered promoter entity is MILAN HOUSING COMPLEX PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUCHA VATIKA D Wing ORCHID E Wing IRIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUCHA VATIKA D Wing ORCHID E Wing IRIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUCHA VATIKA D Wing ORCHID E Wing IRIS?

The professionals named in the filing: Architect: ANKUR A SHETYE; Architect: SPACE ENVIRO ARCHITECTS; Engineer: SURENDRA VELJI PATEL; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: HEENA B MOMAYA; Chartered Accountant: ANJU PALAN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUCHA VATIKA D Wing ORCHID E Wing IRIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUCHA VATIKA D Wing ORCHID E Wing IRIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUCHA VATIKA D Wing ORCHID E Wing IRIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.