Completed No litigation declared Plotted project

RSG - WEST END

By R SANDESH INFRASTRUCTURES PRIVATE LIMITED

RG-MH-65945 · RERA P50500049231 · Last updated on MahaRERA portal: 30 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
0 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

RSG - WEST END is a Plotted project by R SANDESH INFRASTRUCTURES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500049231 on 3 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 90 of the 90 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRSG - WEST END
  • TypePlotted
  • Location
    • KH NO 189-5
    • JAMTHA
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500049231
  • ReraGenie IDRG-MH-65945

Builder

  • NameR SANDESH INFRASTRUCTURES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDILIP PRALHADRAI AGRAWAL, RAMDEO PRALHARAI AGRAWAL
  • Other registrations6 more →
  • Completed3 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed83 files

Current status

100%90 of 90 units booked

Figures as on 30 Jan 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes10%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,566 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY (NMRDA)

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP AGRASEN CHATTRALAYA, RAVINAGAR SQUARE, AMRAVATI ROAD, NAGPUR-440001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH LAMGE
EngineerHEMANT MOHOD
EngineerSANJAY BIRLA
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
R SANDESH INFRASTRUCTURES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jan 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: FINAL OC RSG WEST END MERGED.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 AMENDED SCANNED.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM 1 RSG - WEST END december 2025.pdf18 Jan 2026
Withdrawal Update Form 2File: FORM 2_RSG-WEST END_DECEMBER 2025.pdf18 Jan 2026
Withdrawal Update Form 3File: FORM 3 RSG -WEST END DECEMBER 2025.pdf18 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (78).pdf19 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 (78).pdf19 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (53).pdf19 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (54).pdf19 Oct 2025
Withdrawal Update Form 3File: FORM-3 RSG WEST END JUN-25 COMPRESSED.pdf19 Oct 2025
Withdrawal Update Form 3File: FORM-3 SEPT-25 RSG WEST END SCANNED COMPRESSED.pdf19 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RSGW.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RSGW.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold RSGW.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RSG West End_Marc-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD_.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RSG-WEST END_Form-1- Architect Certificate_Dec-24.pdf4 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 2nd RL Letter.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 1st RL letter.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 1st RL letter.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 2nd RL Letter.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-SEP-24.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-JUNE-24.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-MAR-24.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-DEC-23.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-S-24.pdf22 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 RSG West End_2023-24.pdf22 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSG-WEST END_FORM-3_.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG-WEST END_Form-2-.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RSG-WEST END_Form-2A_Mar-24.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSG-WEST END_FORM-3_June-24.pdf21 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG-WEST END_Form-2-Engineers Certificate_June-24.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RSG-WEST END_Form-1- Architect Certificate_June-24.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 2.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG West End Form 2 Dec 23.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG West End Form 2 March 24.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSG-WEST END_FORM-3_Mar-24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Dec-23_page-0001.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_RSG WEST END FORM 1 31-12-22.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_RSG WEST END FORM 1 31-03-23.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Form 1 30-6-23.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1 30-9-23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_RSG WEST END FORM 2 Q-3 22-23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_RSG WEST END FORM 2 Q-4 22-23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_RSG WEST END FORM 2 Q-1 23-24.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_RSG WEST END FORM 2 Q-2 23-24.pdf30 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RSG WEST END FORM 2A FY 22-23.pdf30 Nov 2023
Disclosure of sold/ booked inventoryFile: 1_RSG WEST END SOLD UNSOLD 31-12-22.pdf30 Nov 2023
Disclosure of sold/ booked inventoryFile: 2_RSG WEST END SOLD UNSOLD 31-3-23.pdf30 Nov 2023
Disclosure of sold/ booked inventoryFile: 3_RSG WEST END SOLD UNSOLD 30-6-23.pdf30 Nov 2023
Disclosure of sold/ booked inventoryFile: 4_RSG WEST END SOLD UNSOLD 30-9-23.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_RSG WEST END FORM 3 31-12-22-min.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_RSG WEST END FORM 3 31-3-23-min.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_RSG WEST END FORM 3 30-6-23-min.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_RSG WEST END FORM 3 30-9-23-min.pdf30 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RSG WEST END FORM 5 FY 22-23.pdf30 Nov 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCES.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBERANCES.pdf19 Jan 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCES.pdf19 Jan 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBERANCES.pdf19 Jan 2023
Declaration about Commencement CertificateFile: COMMMENCEMENT CERTIFICATE.pdf19 Jan 2023
Declaration in FORM BFile: FORM B_compressed.pdf19 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257873866_For_Asset_Based_Search_18_01_2023_17_52_36_938.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed-1.pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE _compressed.pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_compressed.pdf19 Jan 2023
Proforma of Allotment letterFile: _ALLOTMENT LETTER _compressed.pdf19 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION SEPARATE BANK ACCOUNT.pdf19 Jan 2023
Deviation Report with respect to Allotment letterFile: DECLARATION ALLOTMENT LETTER .pdf19 Jan 2023
Layout approvalFile: SANCTION MAP RSG WEST END.pdf18 Jan 2023
Building plan approval or NA orderFile: SANCTION MAP RSG WEST END.pdf18 Jan 2023
Copy of Layout Approval (in case of layout)File: SANCTION MAP RSG WEST END.pdf18 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION MAP RSG WEST END.pdf18 Jan 2023
PAN CardFile: R SANDESH COMPANY PAN CARD.pdf16 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: NMRDA SANCTION.pdf16 Jan 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SANDESH CITY APARTMENT-1KH NO 167-2 & 168 MOUZA JAMTHA378CompletedDec 2023Sep 2021
SANDESH CITY APARTMENT 4CTS NO 186-1 186-2 186-3 186-5 188-1 188-2 189-1 189-2 189-3 MOUZA JAMTHA NAGPUR 44112251CompletedDec 2023Jan 2020
SANDESH CITY APARTMENT 3CTS NO 186-1 & 186-2 & 186-3 & 186-5 & 188-1 & 189-1 & 189-2 & 189-3 MOUZA JAMTHA NAGPUR 44112223CompletedDec 2023Sep 2021
SANDESH DAWA BAZAR2A CITY SURVEY NO. 422-1 MOUZA NAGPUR302CompletedMar 2022Jan 2021

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RSG - WEST END on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMTHA2,800+ in Nagpur

2 kmRSG - WEST ENDCompleted 25Lapsed / revoked 1Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: R SANDESH INFRASTRUCTURES PRIVATE LIMITED

R SANDESH INFRASTRUCTURES PRIVATE LIMITED has 7 registrations on MahaRERA, including OFFICERS ENCLAVE and RSG - WEST END. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if RSG - WEST END is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RSG - WEST END?

The registered promoter entity is R SANDESH INFRASTRUCTURES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RSG - WEST END?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RSG - WEST END?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RSG - WEST END?

The professionals named in the filing: Architect: UMESH LAMGE; Engineer: HEMANT MOHOD; Engineer: SANJAY BIRLA; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RSG - WEST END?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RSG - WEST END. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RSG - WEST END to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.