Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RSG - WEST END is a Plotted project by R SANDESH INFRASTRUCTURES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500049231 on 3 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 90 of the 90 units on this registration are recorded sold or booked.
At a glance
Project
- NameRSG - WEST END
- TypePlotted
- Location
- KH NO 189-5
- JAMTHA
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500049231
- ReraGenie IDRG-MH-65945
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Feb 2023
- Promised completion31 Dec 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed83 files
Current status
Figures as on 30 Jan 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 30 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH LAMGE |
| Engineer | HEMANT MOHOD |
| Engineer | SANJAY BIRLA |
| Chartered Accountant | CA ANKIT TALREJA |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| R SANDESH INFRASTRUCTURES PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Jan 2026
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Completion CertificateFile: FINAL OC RSG WEST END MERGED.pdf | 30 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 AMENDED SCANNED.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 RSG - WEST END december 2025.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_RSG-WEST END_DECEMBER 2025.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 RSG -WEST END DECEMBER 2025.pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (78).pdf | 19 Oct 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (78).pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (53).pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (54).pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3 RSG WEST END JUN-25 COMPRESSED.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3 SEPT-25 RSG WEST END SCANNED COMPRESSED.pdf | 19 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RSGW.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RSGW.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold RSGW.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RSG West End_Marc-2025.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 4 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD_.pdf | 4 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RSG-WEST END_Form-1- Architect Certificate_Dec-24.pdf | 4 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 2nd RL Letter.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 1st RL letter.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 1st RL letter.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 189-5 2nd RL Letter.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-SEP-24.pdf | 6 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-JUNE-24.pdf | 6 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-MAR-24.pdf | 6 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD-DEC-23.pdf | 6 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-S-24.pdf | 22 Oct 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 RSG West End_2023-24.pdf | 22 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSG-WEST END_FORM-3_.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG-WEST END_Form-2-.pdf | 21 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RSG-WEST END_Form-2A_Mar-24.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSG-WEST END_FORM-3_June-24.pdf | 21 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG-WEST END_Form-2-Engineers Certificate_June-24.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RSG-WEST END_Form-1- Architect Certificate_June-24.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 2.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG West End Form 2 Dec 23.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RSG West End Form 2 March 24.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RSG-WEST END_FORM-3_Mar-24.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Dec-23_page-0001.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_RSG WEST END FORM 1 31-12-22.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_RSG WEST END FORM 1 31-03-23.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Form 1 30-6-23.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1 30-9-23.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_RSG WEST END FORM 2 Q-3 22-23.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_RSG WEST END FORM 2 Q-4 22-23.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_RSG WEST END FORM 2 Q-1 23-24.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_RSG WEST END FORM 2 Q-2 23-24.pdf | 30 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RSG WEST END FORM 2A FY 22-23.pdf | 30 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: 1_RSG WEST END SOLD UNSOLD 31-12-22.pdf | 30 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: 2_RSG WEST END SOLD UNSOLD 31-3-23.pdf | 30 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: 3_RSG WEST END SOLD UNSOLD 30-6-23.pdf | 30 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: 4_RSG WEST END SOLD UNSOLD 30-9-23.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_RSG WEST END FORM 3 31-12-22-min.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_RSG WEST END FORM 3 31-3-23-min.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_RSG WEST END FORM 3 30-6-23-min.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_RSG WEST END FORM 3 30-9-23-min.pdf | 30 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RSG WEST END FORM 5 FY 22-23.pdf | 30 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCES.pdf | 19 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBERANCES.pdf | 19 Jan 2023 |
| Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCES.pdf | 19 Jan 2023 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBERANCES.pdf | 19 Jan 2023 |
| Declaration about Commencement CertificateFile: COMMMENCEMENT CERTIFICATE.pdf | 19 Jan 2023 |
| Declaration in FORM BFile: FORM B_compressed.pdf | 19 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200257873866_For_Asset_Based_Search_18_01_2023_17_52_36_938.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed-1.pdf | 19 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE _compressed.pdf | 19 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_compressed.pdf | 19 Jan 2023 |
| Proforma of Allotment letterFile: _ALLOTMENT LETTER _compressed.pdf | 19 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION SEPARATE BANK ACCOUNT.pdf | 19 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: DECLARATION ALLOTMENT LETTER .pdf | 19 Jan 2023 |
| Layout approvalFile: SANCTION MAP RSG WEST END.pdf | 18 Jan 2023 |
| Building plan approval or NA orderFile: SANCTION MAP RSG WEST END.pdf | 18 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: SANCTION MAP RSG WEST END.pdf | 18 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION MAP RSG WEST END.pdf | 18 Jan 2023 |
| PAN CardFile: R SANDESH COMPANY PAN CARD.pdf | 16 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NMRDA SANCTION.pdf | 16 Jan 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SANDESH CITY APARTMENT-1 | KH NO 167-2 & 168 MOUZA JAMTHA | 378 | Completed | Dec 2023 | Sep 2021 |
| SANDESH CITY APARTMENT 4 | CTS NO 186-1 186-2 186-3 186-5 188-1 188-2 189-1 189-2 189-3 MOUZA JAMTHA NAGPUR 441122 | 51 | Completed | Dec 2023 | Jan 2020 |
| SANDESH CITY APARTMENT 3 | CTS NO 186-1 & 186-2 & 186-3 & 186-5 & 188-1 & 189-1 & 189-2 & 189-3 MOUZA JAMTHA NAGPUR 441122 | 23 | Completed | Dec 2023 | Sep 2021 |
| SANDESH DAWA BAZAR | 2A CITY SURVEY NO. 422-1 MOUZA NAGPUR | 302 | Completed | Mar 2022 | Jan 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
Keep RSG - WEST END on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JAMTHA2,800+ in Nagpur
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: R SANDESH INFRASTRUCTURES PRIVATE LIMITED
R SANDESH INFRASTRUCTURES PRIVATE LIMITED has 7 registrations on MahaRERA, including OFFICERS ENCLAVE and RSG - WEST END. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if RSG - WEST END is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RSG - WEST END?
The registered promoter entity is R SANDESH INFRASTRUCTURES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RSG - WEST END?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RSG - WEST END?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RSG - WEST END?
The professionals named in the filing: Architect: UMESH LAMGE; Engineer: HEMANT MOHOD; Engineer: SANJAY BIRLA; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RSG - WEST END?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback