Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 50%
25 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

RR Vision is a Others project by Sri Swami Samarth Infrra in Pune, Maharashtra, registered with MahaRERA as P52100080629 on 23 Jun 2025. Possession is promised by 31 Dec 2027. 0 of the 25 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameRR Vision
  • TypeOthers
  • Location
    • PLOT NO 600 SECTOR NO 25
    • NIGDI PRADHIKARAN
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411044
  • Pincode411044
  • RERA no.P52100080629
  • ReraGenie IDRG-MH-33276

Builder

  • NameSri Swami Samarth Infrra
  • Entity typePartnership

Key dates

this monthRegisteredJun 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Current status

0%0 of 25 units booked
45.0%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA88101525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

A WING: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Open Space43

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area535 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Oct 2025
LandownerVillageDistrict
MEENA BANARASIDAS AGARWALPimpri Chinchawad (M Corp.)Pune
RAJKUMAR BANARASIDAS AGARWALPimpri Chinchawad (M Corp.)Pune
VIJAY BANARASIDAS AGARWALPimpri Chinchawad (M Corp.)Pune
DHARMENDRA BANARASIDAS AGARWALPimpri Chinchawad (M Corp.)Pune
POONAM RAJKUMAR AGARWALPimpri Chinchawad (M Corp.)Pune
RUPNARAYAN DHANILAL KHATRIPimpri Chinchawad (M Corp.)Pune
SATISH VASANT CHAUDHARIPimpri Chinchawad (M Corp.)Pune
MEENA SATISH CHAUDHARIPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Muncipal Corporation
Permissible FSI2262.76
Proposed, not sanctioned2,263 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1, SECTOR 27APRADHIKARANNIGDIPUNEMAHARASHTRA411044
Estimated costRs 7.00 cr
Cost incurredRs 3.15 cr
Work done45.0%
BuildingWingEstimatedIncurred
A WINGNARs 7.00 crRs 3.15 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShekhar Kokane
EngineerVijay ramani
EngineerTaank Vijay Ramani
Chartered AccountantPMRD & ASSOCIATES LLP
Chartered AccountantS S Bora & Co
PartnerRole in project
Sri Swami Samarth Infrra-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf12 May 2026
Form 5 (FY 2025-2026)File: Form 5 FY 25-26.pdf8 May 2026
Layout approvalFile: 01_02 Upload.pdf23 Apr 2026
Building plan approvalFile: 02_02.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1 Q4 FY 25-26.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 25-26.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf13 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf8 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf8 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf8 Oct 2025
Layout approvalFile: Plan Sanction 1 upload.pdf4 May 2025
Copy of the legal title reportFile: LTR Upload.pdf4 May 2025
Copy of Layout Approval (in case of layout)File: Plan Sanction 1 upload.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 rr vision.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 upload.pdf4 May 2025
Declaration about Commencement CertificateFile: circular 32 rr vis.pdf4 May 2025
CERSAI detailsFile: CERSAI Report.pdf4 May 2025
CERSAI detailsFile: cersai undertaking rr vision.pdf4 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format A bank letter.pdf4 May 2025
Other - FinanceFile: declaration for not opening bank account.pdf4 May 2025
Other - TechnicalFile: declaration for not opening bank account.pdf4 May 2025
Other - TechnicalFile: order 50.pdf4 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: pd rakhee.pdf4 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: pd rishabh.pdf4 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: pd gawade.pdf4 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: pd pritm.pdf4 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: pd vivan.pdf4 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B bank letter.pdf4 May 2025
Details of encumbrances concerned to FinanceFile: finance legal enc.pdf1 May 2025
Proforma of Allotment letterFile: allotment letter rr vision.pdf1 May 2025
Declaration in FORM BFile: form B promoter RRvision.pdf1 May 2025
Deviation Report with respect to Allotment letterFile: no dev allotment letter.pdf1 May 2025
Details of encumbrances concerned to LegalFile: finance legal enc.pdf1 May 2025
Deviation Report with respect to model copy of AgreementFile: no deviation agreement.pdf1 May 2025
Proforma of Agreement for saleFile: AGREEMENT FORMAT_1 revised.pdf1 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: disclosure sec unsec.pdf1 May 2025
Building plan approvalFile: 2.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf15 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf15 Oct 2024
PAN CardFile: FIRM PAN.pdf13 Oct 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RR Vision on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NIGDI PRADHIKARAN13,700+ in Pune

Builder: Sri Swami Samarth Infrra

Sri Swami Samarth Infrra has 1 registration on MahaRERA, including RR Vision. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RR Vision is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RR Vision?

The registered promoter entity is Sri Swami Samarth Infrra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RR Vision?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RR Vision?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RR Vision?

The professionals named in the filing: Architect: Shekhar Kokane; Engineer: Vijay ramani; Engineer: Taank Vijay Ramani; Chartered Accountant: PMRD & ASSOCIATES LLP; Chartered Accountant: S S Bora & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RR Vision?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RR Vision. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RR Vision to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.