Home / Browse projects / Nagpur, Maharashtra / RR INDUSTRIAL PARK

Completed No litigation declared Plotted project

RR INDUSTRIAL PARK

By R R INDUSTRIAL PARK

RG-MH-67727 · RERA P50500022821 · Last updated on MahaRERA portal: 31 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
9 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

RR INDUSTRIAL PARK is a Plotted project by R R INDUSTRIAL PARK in Nagpur, Maharashtra, registered with MahaRERA as P50500022821 on 30 Oct 2019. The registration is recorded completed; possession was promised by 30 Mar 2024. 19 of the 28 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRR INDUSTRIAL PARK
  • TypePlotted
  • Location
    • KAMPTEE
    • Gumthala
    • Nagpur (Rural)
    • Nagpur
    • 441104
  • Pincode441104
  • RERA no.P50500022821
  • ReraGenie IDRG-MH-67727

Builder

  • NameR R INDUSTRIAL PARK
  • Entity typePartnership
  • PartnersMANISHA PRAVIN SARDA, VIJAYSHREE ANIL SARDA, ARUNKUMAR RAMPRATAP SARDA, RANJANA ARUNKUMAR SARDA, KAUSHLYADEVI GOVINDRAM SARDA, GOVINDRAM BALMUKUND SARDA, PRAVINKUMAR GOVINDRAM SARDA, MANISHA PRAVIN SARDA, ARUNKUMAR RAMPRATAP SARDA, GOVINDRAM BALMUKUND SARDA, KAUSHLYADEVI GOVINDRAM SARDA, PRAVINKUMAR GOVINDRAM SARDA and 2 more

Key dates

this monthRegisteredOct 2019PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Oct 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed90 files

Current status

68%19 of 28 units booked

Figures as on 31 Dec 2024, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 31 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes97%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes96%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area93,105 sq m
Land owned byThe promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCENTRAL AVENUE,NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANAGRAM STUDIOS
EngineerADITYA INDURKAR
Chartered AccountantPALKESH KHANDELWAL
PartnerRole in project
R R INDUSTRIAL PARK-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2024

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5.pdf31 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - RR Industrial Park.pdf11 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 RR Industrial Park.pdf10 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Gram Panchayat Project OC - RR Industrial Park.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - RR Industrial Park - FY 23-24.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RR ENGI JUNE 23.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RR ENGI SEPT 23.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RR ENGI DEC 23.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (June 23)ARCH CERT Form 1.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (Sept 23)ARCH CERT Form 1.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (DEC 2023)ARCH CERT Form 1.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (March 24)ARCH CERT Form 1.pdf3 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - RR Industrial Park - FY 23-24.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: ( June 23)Sold Booked Inv.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: (Sept 23) Sold Booked Inv.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: (DEC 2023)Sold Booked Inv.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: (March 24)Sold Booked Inv.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: (JUNE 2023)CA CERTIFICATE FORM 3.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: (SEP 2023)CA CERTIFICATE FORM 3.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: (DEC 2023)CA CERTIFICATE FORM 3.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 1.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 2.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 3.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 4.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 5.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 6.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 7.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Art cert 8.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 2 Engineers certificate - RR Ind Park - 19 to 20.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 2 Engineers certificate - RR Ind Park - 20 to 21.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 2 Engineers certificate - RR Ind Park - 31-12-2021.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 2 Engineers certificate - RR Ind Park - 31-03-2022.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 2 Engineers certificate - RR Ind Park - 30-06-2022.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 2 Engineers certificate - RR Ind Park - 30-09-2022.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 2 Engineers certificate - RR Ind Park - 31-12-2022.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 2 Engineers certificate - RR Ind Park - 31-03-2023.pdf4 Jan 2024
Declaration about Commencement CertificateFile: Format D_10-04-2020.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_10-04-2021.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_08-07-2022.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_10-10-2022.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_12-01-2022.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_15-04-2022.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_10-01-2023.pdf21 Nov 2023
Declaration about Commencement CertificateFile: Format D_14-04-2023.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A_15-04-2020.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5_FY 2020-21.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A_20-04-2021.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A_12-04-2022.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A_10-04-2023.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_31-03-2021.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_31-03-2021.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_31-12-2021.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_31-03-2022.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_30-06-2022.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_30-09-2022.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold_31-12-2022.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_31-03-2023.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_FY 19-20.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_FY 20-21.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Apr21 to Dec21.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_March 2022.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_June 2022.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sep 2022.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_DEC-22.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_ March 2023.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_FY 2019-20.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_FY 2020-21.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 2021-22.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5_FY 2022-23.pdf21 Nov 2023
PAN CardFile: PAN.pdf23 Oct 2019
Layout approvalFile: SANCTION MAP.pdf15 Oct 2019
Building plan approval or NA orderFile: SANCTION MAP.pdf15 Oct 2019

How this compares with Nagpur

68%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RR INDUSTRIAL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMPTEE2,800+ in Nagpur

Builder: R R INDUSTRIAL PARK

R R INDUSTRIAL PARK has 1 registration on MahaRERA, including RR INDUSTRIAL PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if RR INDUSTRIAL PARK is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RR INDUSTRIAL PARK?

The registered promoter entity is R R INDUSTRIAL PARK, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RR INDUSTRIAL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RR INDUSTRIAL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RR INDUSTRIAL PARK?

The professionals named in the filing: Architect: ANAGRAM STUDIOS; Engineer: ADITYA INDURKAR; Chartered Accountant: PALKESH KHANDELWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RR INDUSTRIAL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RR INDUSTRIAL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RR INDUSTRIAL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.