Home / Browse projects / Nagpur, Maharashtra / Mangala Estate

Registered No litigation declared Plotted project

Mangala Estate

By Raju Itkelwar

RG-MH-59889 · RERA P50500049268 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 83 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 83 months from the original
60 of 99Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

Mangala Estate is a Plotted project by Raju Itkelwar in Nagpur, Maharashtra, registered with MahaRERA as P50500049268 on 3 Feb 2023. Possession is promised by 31 Dec 2030. The completion date has moved by 83 months from the original filing. 39 of the 99 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMangala Estate
  • TypePlotted
  • Location
    • Pawangaon Dhargaon Road
    • Pawangaon
    • Kamptee
    • Nagpur
    • 441104
  • Pincode441104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500049268
  • ReraGenie IDRG-MH-59889

Builder

  • NameRaju Itkelwar
  • Entity typeIndividual
  • PartnersRaju Laxmikant Itkelwar, Rita Raju Itkelwar, Rishabh Rajiv itkelwar

Key dates

this monthRegisteredFeb 2023First promiseJan 2024Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Jan 2024)
  • BuildingsNot stated in filing
  • Documents filed112 files

Current status

39%39 of 99 units booked
85.4%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area28,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Metropolitian Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShriram tower kingsway sadar nagpur
Estimated costRs 7.71 cr
Cost incurredRs 6.58 cr
Work done85.37%
BuildingWingEstimatedIncurred
-NARs 7.71 crRs 6.58 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectC D GIRIPUNJE
EngineerC D GIRIPUNJE
Chartered AccountantPayal Taori
Chartered AccountantSaloni Bang & Associates
Chartered AccountantRishi Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Raju Itkelwar-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500019049Jan 2024 → Jan 2025

Reason as filed by the promoterWe had registered the project mangala estate in February 2023 and have completed around 75% of the work as well in the said project. And my Rera team from the office have registered with a deadline of less than a year by mistake they selected 2024 instead of 2025 This was a typo error by my team. No promoter will set such a short deadline for a new project. I got to know this only after the registration certificate was generated. I have also tried the application for change but they have directed to use the extension module. And for such typo error we have to pay such a high fees in extension

EA12052620938Jan 2024 → Dec 2030

Reason as filed by the promoterI, Shri Raju Laxmikant Itkelwar, prop. of the said project, am writing to formally request an extension for the completion date of our plotted development project located at Kh. No. 187/1/1/1, P.H.No. 18, Mouza - Pawangaon, Tah. - Kamptee, District - Nagpur; total admeasuring 28,000.00 Sq. Mtrs. The current registration for the aforementioned project is valid until 30-01-2025. We are seeking an extension of 5 years, proposing a revised completion date of 31-12-2030. - Reasons for Delay Despite our best efforts to adhere to the original timeline, the development of the layout was hindered by th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 - Architects certificate - mangala Estate - june 2025.pdf18 Jun 2026
Withdrawal Update Form 1File: form 1 - Architects certificate - Mangala Estate - sep 2025.pdf18 Jun 2026
Withdrawal Update Form 1File: form 1 - ARCHITECTS CERTIFICATE - MANGALA ESTATE - dec 2025.pdf18 Jun 2026
Withdrawal Update Form 1File: form 1- ARCHITECTS CERTIFICATE - MANGALA ESTATE - march 2026.pdf18 Jun 2026
Withdrawal Update Form 2File: form 2 - Engineer certificate - Mangala Estate - june 2025.pdf18 Jun 2026
Withdrawal Update Form 2File: form 2 - Engineer Certificate - Mangala Estate - sep 2025.pdf18 Jun 2026
Withdrawal Update Form 2File: form 2 - ENGINEER CERTIFICATE - MANGALA ESTATE - DEC 2025.pdf18 Jun 2026
Withdrawal Update Form 2File: form 2 - ENGINEER CERTIFICATE - MANGALA ESTATE - March 2026.pdf18 Jun 2026
Withdrawal Update Form 3File: form 3 - C A Certificate - Mangala Estate - june 2025.pdf18 Jun 2026
Withdrawal Update Form 3File: form 3 - C A Certificate - Mangala Estate - sep 2025.pdf18 Jun 2026
Withdrawal Update Form 3File: form 3 - C A CERTIFICATE - MANGAL ESTATE - DEC 2025.pdf18 Jun 2026
Withdrawal Update Form 3File: Form 3 - C A Certificate - Mangala Estate - March 26 revised.pdf18 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A-chintamani - 2024-2025.pdf19 May 2026
Form 5 (FY 2024-2025)File: form 5 -march 2025.pdf19 May 2026
Form 2A (FY 2022-2023)File: FORM 2A-Chintamani- 2023.pdf9 May 2026
Form 2A (FY 2023-2024)File: form 2A- CHINTAMANI- 2024.pdf9 May 2026
Form 2A (FY 2024-2025)File: FORM 2A-chintamani 2025.pdf9 May 2026
Form 5 (FY 2022-2023)File: form 5 -march 2023.pdf1 May 2026
Form 5 (FY 2023-2024)File: form 5 -march 2024.pdf1 May 2026
Form 5 (FY 2024-2025)File: form 5 -march 2025.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - March 2023.pdf29 Apr 2026
Form 1File: Form1 - Architect Certificate of Percentage of Completion of Work.pdf29 Apr 2026
Form 2File: form 2 march 2023.pdf29 Apr 2026
Form 3File: Form3 - CA Certificate march 2023.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - June 2023.pdf29 Apr 2026
Form 1File: form1 Architect certificate - june 2023.pdf29 Apr 2026
Form 2File: form2 Engineer certificate june 2023.pdf29 Apr 2026
Form 3File: form3 CA certificate compressed - june 2023.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - Sept 2023.pdf29 Apr 2026
Form 1File: FORM1 Architect certificate - SEPT 2023.pdf29 Apr 2026
Form 2File: FORM2 Engineer certificate SEPT 2023.pdf29 Apr 2026
Form 3File: FORM3 CA certificate form SEPT 2023.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - DEC 2023.pdf29 Apr 2026
Form 1File: FORM1 ARCHITECT CERTIFICATES - DEC 2023.pdf29 Apr 2026
Form 2File: FORM2 ENGINEER CERTIFICATES - DEC 2023.pdf29 Apr 2026
Form 3File: FORM3 CA CERTIFICATE_compressed - DCE 2023.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure march 2024.pdf29 Apr 2026
Form 1File: FORM1 -architect certificate- MARCH 2024.pdf29 Apr 2026
Form 2File: FORM2 - engineer certificate - MARCH 2024.pdf29 Apr 2026
Form 3File: FORM3 - CA certificate MARCH 2024.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - JUNE 2024.pdf29 Apr 2026
Form 1File: FORM1 - ARCHITECT CERTIFICATE - QPR June 24.pdf29 Apr 2026
Form 2File: FORM2 - ENGINEER CERTIFICATE - QPR June 24.pdf29 Apr 2026
Form 3File: form3 - CA - Mangala QPR June24.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - Sept 2024.pdf29 Apr 2026
Form 1File: Form1 - Architect Certificate - SEPT 2024.pdf29 Apr 2026
Form 2File: form 2 sep 2024.pdf29 Apr 2026
Form 3File: Form3 - CA Certificate - SEPT 2024.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - Dec 2024.pdf29 Apr 2026
Form 1File: form 1 dec 2024.pdf29 Apr 2026
Form 2File: form2 - engineer certificate - dec 2024.pdf29 Apr 2026
Form 3File: FORM 3 - CA CERTIFICATE - DEC 2024_compressed.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Mangala Estate - March 2025.pdf29 Apr 2026
Form 1File: form 1 march 2025.pdf29 Apr 2026
Form 2File: form 2 march 2025.pdf29 Apr 2026
Form 3File: Form 3 - CA Certificate - march 2025.pdf29 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march25 arch form 2.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 25 engineer certi form 2.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: March 25 engineer certi form 2.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 mar 2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera qpr dec 24 architect certificate .pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rera qpr dec 24 engineer certificate .pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: doc05013420250120214213_compressed.pdf20 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: form 2 rera qpr sept24.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 qpr sept 24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QPR June 24 ME arch certi 2.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QPR June 24 ME arch certi 2.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mangala form 3 QPR June24.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate apr24 .pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: architect certificate apr24 .pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Apr 24.pdf25 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 march2024.pdf20 Mar 2024
Declaration in FORM BFile: doc06348020240221204956.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATES.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: doc06348420240221212203.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARCHITECT CERTIFICATES.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate-1-3.pdf24 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate-4-5.pdf24 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate rera October 2023.pdf24 Oct 2023

How this compares with Nagpur

39%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 83 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mangala Estate on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pawangaon2,800+ in Nagpur

2 kmMangala EstateCompleted 3Lapsed / revoked 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Raju Itkelwar

Raju Itkelwar has 1 registration on MahaRERA, including Mangala Estate. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Mangala Estate is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mangala Estate?

The registered promoter entity is Raju Itkelwar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mangala Estate?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mangala Estate?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mangala Estate?

The professionals named in the filing: Architect: C D GIRIPUNJE; Engineer: C D GIRIPUNJE; Chartered Accountant: Payal Taori; Chartered Accountant: Saloni Bang & Associates; Chartered Accountant: Rishi Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mangala Estate?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mangala Estate. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mangala Estate to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.