Home / Browse projects / Thane, Maharashtra / Royal Heritage

Registered No litigation declared Residential / Group Housing project

Royal Heritage

By MUMBAI PROMOTERS PRIVATE LIMITED

RG-MH-50486 · RERA P51700050170 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
13 of 198Construction stages doneacross 18 buildings; furthest along: Slabs of Super Structure, 50%
18 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Royal Heritage is a Residential / Group Housing project by MUMBAI PROMOTERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700050170 on 21 Mar 2023. Possession is promised by 25 Dec 2028. The completion date has moved by 36 months from the original filing. 0 of the 18 units on this registration are recorded sold or booked, and 13 of 198 construction stages are filed complete.

At a glance

Project

  • NameRoyal Heritage
  • TypeResidential / Group Housing
  • Location
    • Shere
    • Vasind (East)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • RERA no.P51700050170
  • ReraGenie IDRG-MH-50486

Builder

  • NameMUMBAI PROMOTERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsAKHIL BANSAL, RAMCHANDRA SAVALARAM DONGARE

Key dates

this monthRegisteredMar 2023First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Mar 2023
  • Promised completion25 Dec 2028
  • Revised completionRevised to 25 Dec 2028 (originally 25 Dec 2025)
  • Buildings18 building records
  • Documents filed78 files

Current status

0%0 of 18 units booked
10.5%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow no 9NA11101
Bungalow no 10NA11101
Bungalow no 11NA11101
Bungalow no 15NA11101
Bungalow no 16NA11101
Bungalow no 51NA11101
Bungalow no 55NA11101
Bungalow no 61NA11101
Bungalow no 62NA11101
Bungalow no 63NA11101
Bungalow no 64NA11101
Bungalow no 65NA11101
Bungalow no 66NA11101
Bungalow no 67NA11101
Bungalow no 69NA11101
Bungalow no 70NA11101
Bungalow no 83NA11101
Bungalow no 84NA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building18

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 198 construction stages are filed complete across 18 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Bungalow no 90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 510%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 550%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 6123%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 6218%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 639%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 6411%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 659%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 669%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth3%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 670%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 6918%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 7036%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 830%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow no 840%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36
BuildingClosed/CoveredTotal
Bungalow no 922
Bungalow no 1022
Bungalow no 1122
Bungalow no 1522
Bungalow no 1622
Bungalow no 5122
Bungalow no 5522
Bungalow no 6122
Bungalow no 6222
Bungalow no 6322
Bungalow no 6422
Bungalow no 6522
Bungalow no 6622
Bungalow no 6722
Bungalow no 6922
Bungalow no 7022
Bungalow no 8322
Bungalow no 8422

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,339 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Sep 2025

Approvals and building plan

Sanctioning authorityMUMBAI PR0MOTERS PVT LTD
Permissible FSI2122.5
Proposed, not sanctioned2,122 sq m
Buildings approved18
Buildings sanctioned18

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDhrvankur, shriram nagar, shahpur, vashind 421604
Estimated costRs 4.79 cr
Cost incurredRs 50.33 lakh
Work done10.51%
BuildingWingEstimatedIncurred
Bungalow no 9NARs 26.60 lakhRs 2.80 lakh
Bungalow no 10NARs 26.60 lakhRs 2.80 lakh
Bungalow no 11NARs 26.60 lakhRs 2.80 lakh
Bungalow no 15NARs 26.60 lakhRs 2.80 lakh
Bungalow no 16NARs 26.60 lakhRs 2.80 lakh
Bungalow no 51NARs 26.60 lakhRs 2.80 lakh
Bungalow no 55NARs 26.60 lakhRs 2.80 lakh
Bungalow no 61NARs 26.60 lakhRs 2.80 lakh
Bungalow no 62NARs 26.60 lakhRs 2.80 lakh
Bungalow no 63NARs 26.60 lakhRs 2.80 lakh
Bungalow no 64NARs 26.60 lakhRs 2.80 lakh
Bungalow no 65NARs 26.60 lakhRs 2.80 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastu Arcade
ArchitectPARIN SHAH
EngineerHarishchandra Kondu Dongare
EngineerJACOB DSOUZA
Chartered AccountantNEHALI & CO
PartnerRole in project
MUMBAI PROMOTERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13102518095Dec 2025 → Dec 2028

Reason as filed by the promoterWe would like to respectfully bring to your attention that the project has encountered certain unforeseen technical challenges that have adversely impacted the originally proposed timelines for completion. We wish to place on record the following reasons for the delay: 1. Structural Redesign or Change in Planning Based on technical site evaluations and safety audits, certain aspects of the structural layout and MEP systems had to be redesigned to meet updated technical standards and ensure long-term safety and quality.& delay in Sale We would like to assure the Authority that despite these una

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Dec 2028

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT FORM 1.pdf15 Jul 2026
Withdrawal Update Form 2File: ENGINEER FORM 2.pdf15 Jul 2026
Withdrawal Update Form 3File: output.pdf15 Jul 2026
Withdrawal Update Form 1File: form 1.pdf30 Apr 2026
Withdrawal Update Form 2File: form 2.pdf30 Apr 2026
Withdrawal Update Form 3File: ca march 26.pdf30 Apr 2026
Building plan approvalFile: Plans.pdf20 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf19 Jan 2026
Withdrawal Update Form 1File: form 1 sep 25.pdf15 Oct 2025
Withdrawal Update Form 2File: form 2 sep 25.pdf15 Oct 2025
Withdrawal Update Form 3File: form 3 sep 25.pdf15 Oct 2025
Withdrawal Update Form 1File: form 1.pdf13 Oct 2025
Withdrawal Update Form 2File: ROYAL HERITAGE FORM 2 JUNE 25.pdf13 Oct 2025
Withdrawal Update Form 3File: form 3 25.pdf13 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 03 24.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (23-24).pdf6 May 2024
Disclosure of sold/ booked inventoryFile: disclosure of inventory.pdf23 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer form 2A 22-23.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 03 23.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 06 23.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 09 23.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 12 23.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 03 23.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 06 23.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 09 23.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 12 23.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3 03 23.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3 06 23.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3 09 23.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3 12 23.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Ca Certificate Form 5.pdf13 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: TLR 1.pdf1 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: TLR 2.pdf1 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Updated layout plan undertaking.pdf28 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Final tax receipt 1.pdf27 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Final tax receipt 2.pdf27 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Updated Form 1.pdf27 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Updated Form 2-1.pdf27 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Updated Form 2-2.pdf27 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Letter and CC.pdf24 Feb 2023
Other - TechnicalFile: Final highlighted layout plan.pdf13 Feb 2023
Layout approvalFile: Highlighted layout plus undertaking.pdf18 Jan 2023
Building plan approvalFile: Bungalow layout plus undertaking.pdf18 Jan 2023
PAN CardFile: Pan Card.pdf18 Jan 2023
Copy of the legal title reportFile: updated legal title report.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Dec Fin and Legal.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance Dec Fin and Legal.pdf18 Jan 2023
Copy of Layout Approval (in case of layout)File: Highlighted layout plus undertaking.pdf18 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Bungalow layout plus undertaking.pdf18 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Updated NA Order.pdf18 Jan 2023
Declaration about Commencement CertificateFile: Updated CC Declaration PDF.pdf18 Jan 2023
Declaration in FORM BFile: Updated Form B - 1.pdf18 Jan 2023
Declaration in FORM BFile: Updated Form B - 2.pdf18 Jan 2023
CERSAI detailsFile: CERSAI Report.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: updated form 3.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Akhil Bansal.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - RS Dongre.pdf18 Jan 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf18 Jan 2023
Proforma of Allotment letterFile: Allotment letter final.pdf18 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Account Declaration.pdf18 Jan 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter Deviation Report.pdf18 Jan 2023
Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report.pdf18 Jan 2023

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Royal Heritage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasind (East)7,600+ in Thane

Builder: MUMBAI PROMOTERS PRIVATE LIMITED

MUMBAI PROMOTERS PRIVATE LIMITED has 1 registration on MahaRERA, including Royal Heritage. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Royal Heritage is delayed beyond 25 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Royal Heritage?

The registered promoter entity is MUMBAI PROMOTERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Royal Heritage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Royal Heritage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Royal Heritage?

The professionals named in the filing: Architect: Vastu Arcade; Architect: PARIN SHAH; Engineer: Harishchandra Kondu Dongare; Engineer: JACOB DSOUZA; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Royal Heritage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Royal Heritage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Royal Heritage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.