Royal Entrada Phase II

By Five Star Construction Company

RG-MH-01201 · RERA P52100000526 · Last updated on MahaRERA portal: 15 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
26 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Royal Entrada Phase II is a Others project by Five Star Construction Company in Pune, Maharashtra, registered with MahaRERA as P52100000526 on 18 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRoyal Entrada Phase II
  • TypeOthers
  • Location
    • Hinjewadi Bhumkar Chowk Road
    • Wakad
    • Mulshi
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000526
  • ReraGenie IDRG-MH-01201

Builder

  • NameFive Star Construction Company
  • Entity typePartnership
  • PartnersSunil Harumal Adwani, Manohar Jaduram Pherwani, Tanuj Manohar Pherwani, Sourabh Sunil Adwani
  • Other registrations8 more →
  • Completed6 of 9
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings3 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BuildingNA130000
E BuildingNA130000
F BuildingNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

D Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E Building73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered3
Open Space103
BuildingClosed/CoveredOpen SpaceTotal
D Building14243
E Building11920
F Building14243

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,495 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Vishal Thakurdas NankaniPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI12731.16
Proposed, not sanctioned12,731 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor,DSK Rohit building,Shivaji Nagar,Jangli Maharaj Road ,Pune 411004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Arun Solapurkar
EngineerInvental Construction Management Groupg
Chartered AccountantSharma Vora and Associates
Chartered AccountantCA Mahavir Kothari
PartnerRole in project
Five Star Construction Company-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000096316Bhagat Singh RajputFive Star Construction Company28/11/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Apr 2023

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE F BLDG.pdf15 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE D BLDG.pdf15 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation E Building.pdf15 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation F Building Entrada.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ROYAL ENTRADA PH II FSCC FORM2 31-03-2020.pdf9 Aug 2021
Certificates of CA (Form 3)File: ROYAL ENTRADA PH II FSCC FORM3 31-03-2020.pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ROYAL ENTRADA PH II FSCC FORM5 31-03-2020.pdf9 Aug 2021
Certificates of Architect (Form 4)File: ENTRADA E- FORM 4.pdf3 Feb 2020
Certificates of Architect (Form 4)File: Royal Entrada E building Completion.pdf3 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Royal Entrada 23012020.pdf23 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Royal Entrada E building Completion.pdf18 Oct 2019
OtherFile: COMPLETION CERTIFICATE D BLDG.pdf5 Jul 2019
OtherFile: COMPLETION CERTIFICATE F BLDG.pdf5 Jul 2019
Certificates of CA (Form 5)File: Form5.pdf22 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: D- society formation certificate Royal Entrada Dwing.pdf19 Oct 2018
Certificates of Architect (Form 4)File: FORM 4 ARCHITECT S CERTIFICATE Royal Entrada D Building.pdf21 Mar 2018
Certificates of Architect (Form 4)File: Entrada D building Completion certificate.pdf21 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: CC REVISED 29 04 2017.pdf19 Mar 2018
Building plan approvalFile: scan03265.pdf14 Jul 2017
Building plan approvalFile: scan03266.pdf14 Jul 2017
Building plan approvalFile: scan03267.pdf14 Jul 2017
Building plan approvalFile: scan03268.pdf14 Jul 2017
Layout approvalFile: Royal Entrada Layout Revised 2017.pdf14 Jul 2017
Building plan approvalFile: scan03255.pdf14 Jul 2017
Building plan approvalFile: scan03257.pdf14 Jul 2017
Building plan approvalFile: scan03256.pdf14 Jul 2017
Building plan approvalFile: scan03258.pdf14 Jul 2017
Building plan approvalFile: scan03260.pdf14 Jul 2017
Building plan approvalFile: scan03261.pdf14 Jul 2017
Building plan approvalFile: scan03262.pdf14 Jul 2017
Building plan approvalFile: scan03263.pdf14 Jul 2017
Building plan approvalFile: scan03259.pdf14 Jul 2017
Building plan approvalFile: scan03264.pdf14 Jul 2017
Copy of the legal title reportFile: ENTRADA TITLE SEARCH AND OPINION.pdf14 Jul 2017
Details of encumbrancesFile: Entrada Title certificate only.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: Royal Entrada Layout Revised 2017.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03256.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03255.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03257.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03258.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03259.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03260.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03261.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03262.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03263.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03264.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03265.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03266.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03267.pdf14 Jul 2017
Building Plan Approval (IOD)File: scan03268.pdf14 Jul 2017
Declaration in FORM BFile: FORM B ROYAL ENTRADA.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENTRADA Arch Certificate FORM 1.pdf14 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENTRADA Engineers Certificate.pdf14 Jul 2017
Certificates of CA (Form 3)File: entrada ca form 3.pdf14 Jul 2017
Certificates of CA (Form 3)File: ENTRADA ANNEX A Sold Inv.pdf14 Jul 2017
Certificates of CA (Form 3)File: entrada ca annex A.pdf14 Jul 2017
Proforma of Allotment letterFile: entrada draft agreement.pdf14 Jul 2017
PAN CardFile: PAN_FCC.PDF10 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Royal MajesticSurvey No. 29 part Rahatani Haveli Pune 1766CompletedMar 2018Mar 2017
Royal Entrada Phase I138 Part 139 Part 140 Part 141 Part Wakad Taluka Mulshi Pune 411057234CompletedOct 2016Oct 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Royal Entrada Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmRoyal Entrada Phase IICompleted 118Lapsed / revoked 45Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 230 registered projects within 2 km.

Builder: Five Star Construction Company

Five Star Construction Company has 9 registrations on MahaRERA, including Royal Entrada Phase II and ROYAL MAJESTIC. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Royal Entrada Phase II is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Royal Entrada Phase II?

The registered promoter entity is Five Star Construction Company, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Royal Entrada Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Royal Entrada Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Royal Entrada Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Royal Entrada Phase II?

The professionals named in the filing: Architect: Pankaj Arun Solapurkar; Engineer: Invental Construction Management Groupg; Chartered Accountant: Sharma Vora and Associates; Chartered Accountant: CA Mahavir Kothari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Royal Entrada Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Royal Entrada Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Royal Entrada Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.