Royal Dreamland

By SURAJ ESTATE DEVELOPERS

RG-MH-17519 · RERA P53000029051 · Last updated on MahaRERA portal: 25 Jun 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
21 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Royal Dreamland is a Others project by SURAJ ESTATE DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000029051 on 23 Apr 2021. The registration is recorded completed; possession was promised by 31 Mar 2026.

At a glance

Project

  • NameRoyal Dreamland
  • TypeOthers
  • Location
    • A ward
    • Phulewadi
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416012
  • Pincode416012
  • RERA no.P53000029051
  • ReraGenie IDRG-MH-17519

Builder

  • NameSURAJ ESTATE DEVELOPERS
  • Entity typePartnership
  • PartnersChetan Hasmukhbhai Vasa, Sunit Chinubhai Parikh, Anand Shankarrao Mane, Divyaraj Hasmukhbhai Vasa
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredApr 2021PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Apr 2021
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA80000
Building BNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered113
BuildingClosed/CoveredTotal
Building A55
Building B108108

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,926 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI18158.58
Proposed, not sanctioned8,866 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShahupuri Kolhapur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGap Associates
EngineerMr Nikhil Rambhia
Chartered AccountantGaurav Phadnis & Co
PartnerRole in project
SURAJ ESTATE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 May 2024

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD 1.pdf25 Jun 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD 2.pdf25 Jun 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD 3.pdf25 Jun 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD 4.pdf25 Jun 2024
Status of ConveyanceFile: Royal Dreamland Saledeed Indexes.pdf25 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf15 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2024.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Building A.pdf15 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Formation of Association.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory Dreamland.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-2023.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Royal Dreameland.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold - Royal Dreameland.pdf6 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Royal Dreamland.pdf11 May 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventary-Royal Dreamland.pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-Royal Dreamland.pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Dream land.pdf6 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Sunflower01282023.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Sunflower01282023.pdf28 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventary01282023.pdf28 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5- Royal Dreameland01282023.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf17 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf17 Nov 2022
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Parikh.pdf26 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_0001.pdf6 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf6 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_0002_11zon.pdf6 May 2022
Building plan approvalFile: 1.pdf16 Mar 2022
Building plan approvalFile: 2.pdf16 Mar 2022
Building plan approvalFile: 3.pdf16 Mar 2022
Building plan approvalFile: 4.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf16 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Rev Building Permission.pdf16 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate16032022.pdf16 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate16032022.pdf16 Mar 2022
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory16032022.pdf16 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate16032022.pdf16 Mar 2022
Details of encumbrancesFile: Encumbrances Declaration14042021.pdf14 Apr 2021
Declaration in FORM BFile: Form B Suraj Eatate14042021.pdf14 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Nikhil Rambhiya (1).pdf14 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Suraj Estate final.pdf14 Apr 2021
OtherFile: Proposed plan Declaration14042021.pdf14 Apr 2021
Copy of the legal title reportFile: TITLE SEARCH REPORT (2)-compressed_compressed.pdf12 Apr 2021
Layout approvalFile: Final Layout suraj.pdf9 Apr 2021
Building plan approvalFile: Sheet No 1 A Block.pdf9 Apr 2021
Building plan approvalFile: Sheet No 2 B Block.pdf9 Apr 2021
Building plan approvalFile: Sheet No 3 B Block.pdf9 Apr 2021
Building plan approvalFile: Sheet No 4 B Block.pdf9 Apr 2021
PAN CardFile: Pan Card.pdf9 Apr 2021
Copy of the legal title reportFile: Legal title report.pdf9 Apr 2021
Copy of Layout Approval (in case of layout)File: Final Layout suraj.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 1 A Block.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 2 B Block.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 3 B Block.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 4 B Block.pdf9 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf9 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf9 Apr 2021
Proforma of Allotment letterFile: AGREEMENT TO SALE - ROYAL DREAMLAND.pdf9 Apr 2021
Proforma of Allotment letterFile: Allottment letter.pdf9 Apr 2021

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Royal Dreamland on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Phulewadi880+ in Kolhapur

Builder: SURAJ ESTATE DEVELOPERS

SURAJ ESTATE DEVELOPERS has 3 registrations on MahaRERA, including Royal Dreamland and ROYAL 09 TOURIST BUSINESS HUB. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Royal Dreamland is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Royal Dreamland?

The registered promoter entity is SURAJ ESTATE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Royal Dreamland?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Royal Dreamland?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Royal Dreamland?

The professionals named in the filing: Architect: Gap Associates; Engineer: Mr Nikhil Rambhia; Chartered Accountant: Gaurav Phadnis & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Royal Dreamland?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Royal Dreamland. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Royal Dreamland to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.