Completed No litigation declared Mixed project

ROSE GARDEN

By URICH GRACE INFRASTRUCTURE PVT LTD

RG-MH-00361 · RERA P50500003460 · Last updated on MahaRERA portal: 18 Sep 2019

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2019Possession promisedregistration recorded completed
100 of 561Construction stages doneacross 52 buildings; furthest along: Internal walls, 90%
18 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

ROSE GARDEN is a Mixed project by URICH GRACE INFRASTRUCTURE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500003460 on 5 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2019. 0 of the 18 units on this registration are recorded sold or booked, and 100 of 561 construction stages are filed complete.

At a glance

Project

  • NameROSE GARDEN
  • TypeMixed
  • Location
    • Rui
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500003460
  • ReraGenie IDRG-MH-00361

Builder

  • NameURICH GRACE INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedMar 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion31 Mar 2019
  • Revised completionNone
  • Buildings51 building records
  • Documents filed122 files

Current status

0%0 of 18 units booked

Figures as on 18 Sep 2019, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HOUSE NO 18NA20000
HOUSE NO 19NA20000
HOUSE NO 20NA20000
HOUSE NO 21NA20000
HOUSE NO 22NA20000
HOUSE NO 23NA20000
HOUSE NO 26NA20000
HOUSE NO 27NA20000
HOUSE NO 28NA20000
HOUSE NO 29NA20000
HOUSE NO 31NA20000
HOUSE NO 36NA20000
HOUSE NO 37NA20000
HOUSE NO 24NA30000
HOUSE NO 25NA30000
HOUSE NO 32NA30000
HOUSE NO 35NA30000
HOUSE NO 39NA30000
HOUSE NO 40NA20000
HOUSE NO 30NA20000
HOUSE NO 6NA20000
HOUSE NO 7NA20000
HOUSE NO 8NA30000
HOUSE NO 9NA20000
HOUSE NO 12NA20000
HOUSE NO 13NA20000
HOUSE NO 14NA20000
HOUSE NO 46NA20000
HOUSE NO 47NA20000
HOUSE NO 48NA20000
HOUSE NO 49NA20000
HOUSE NO 50NA20000
HOUSE NO 51NA20000
HOUSE NO 54NA20000
HOUSE NO 55NA20000
HOUSE NO 56NA20000
HOUSE NO 57NA20000
HOUSE NO 58NA20000
HOUSE NO 59NA20000
HOUSE NO 10NA30000
HOUSE NO 11NA30000
HOUSE NO 15NA30000
HOUSE NO 45NA30000
HOUSE NO 52NA30000
HOUSE NO 53NA30000
HOUSE NO 60NA30000
HOUSE NO 38NA20000
HOUSE NO 41NA20000
HOUSE NO 42NA20000
HOUSE NO 43NA20000
HOUSE NO 17NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 18 Sep 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 52 buildings; the table lists the first 20.

100 of 561 construction stages are filed complete across 52 buildings. The stage furthest along is Internal walls, at 90%.

HOUSE NO 1845%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 1945%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2045%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2145%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2245%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2345%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2645%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2745%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2845%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2945%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 3145%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 3645%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 3745%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2457%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 2545%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 3245%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 3545%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 3945%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSE NO 4056%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
HOUSE NO 3045%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities23

As on 18 Sep 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes10%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
SWIMMING POOLYes0%
PRAY AREAYes0%
PLAY FIELD 2Yes0%
PLAY FIELDYes0%
JOGGING TRACKYes0%
GARDENYes0%
MULTIPURPOSE HALLYes0%
CHILD PLAY AREAYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50
BuildingOpen SpaceTotal
HOUSE NO 1811
HOUSE NO 1911
HOUSE NO 2011
HOUSE NO 2111
HOUSE NO 2211
HOUSE NO 2311
HOUSE NO 2611
HOUSE NO 2711
HOUSE NO 2811
HOUSE NO 2911
HOUSE NO 3111
HOUSE NO 3611
HOUSE NO 3711
HOUSE NO 2411
HOUSE NO 2511
HOUSE NO 3211
HOUSE NO 3511
HOUSE NO 3911
HOUSE NO 4011
HOUSE NO 3011
HOUSE NO 611
HOUSE NO 711
HOUSE NO 811
HOUSE NO 911
HOUSE NO 1211
HOUSE NO 1311
HOUSE NO 1411
HOUSE NO 4611
HOUSE NO 4711
HOUSE NO 4811
HOUSE NO 4911
HOUSE NO 5011
HOUSE NO 5111
HOUSE NO 5411
HOUSE NO 5511
HOUSE NO 5611
HOUSE NO 5711
HOUSE NO 5811
HOUSE NO 5911
HOUSE NO 1011
HOUSE NO 1111
HOUSE NO 1511
HOUSE NO 4511
HOUSE NO 5211
HOUSE NO 6011
HOUSE NO 3811
HOUSE NO 4111
HOUSE NO 4211
HOUSE NO 4311
HOUSE NO 1711

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,036 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI29360.14
Proposed, not sanctioned4,040 sq m
Buildings approved51
Buildings sanctioned25

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANK OF INDIA SHANKAR NAGAR, DHARAMPETH, NAGPUR

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIRENDRA KHARE
EngineerRAJESH KATANE
PartnerRole in project
URICH GRACE INFRASTRUCTURE PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Sep 2019

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf18 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Release of Plots.pdf18 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Release of Plots.pdf18 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Release of Plots.pdf18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.PDF18 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_Rose.pdf20 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng_Rose.pdf20 May 2019
Certificates of CA (Form 3)File: Rose_CA (1).pdf20 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ROSE-Architects-Crtificate-31march.pdf28 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ROSE-EngCertificate-31march.pdf28 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ROSE-EngCertificate-31march.pdf28 May 2018
Certificates of CA (Form 3)File: ROSE-CA-Certificate-31march.pdf28 May 2018
Certificates of CA (Form 3)File: ROSE-CA-Certificate-31march.pdf28 May 2018
Declaration in FORM BFile: Rose- Declearation Form B.pdf2 Aug 2017
Copy of the legal title reportFile: Rose Title Report.pdf28 Jul 2017
Proforma of Allotment letterFile: Rose- Letter for ATS.pdf27 Jul 2017
Layout approvalFile: Rose- Layout Plan.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 17.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 18.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 19.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 20.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 21.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 22.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 23.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 24.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 25.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 26.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 27.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 28.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 29.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 30.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 31.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 32.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 35.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 36.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 37.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 38.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 39.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 40.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 41.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 42.pdf20 Jul 2017
Building plan approval or NA orderFile: ROSE - 43.pdf20 Jul 2017
PAN CardFile: UGI- PAN.pdf20 Jul 2017
Details of encumbrancesFile: Rose-Decleration- Encumbrances Free Land.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: Rose- Layout Plan.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 17.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 18.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 19.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 20.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 21.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 22.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 23.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 24.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 25.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 26.pdf20 Jul 2017
Building Plan Approval (IOD)File: ROSE - 27.pdf20 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
KKA Lifestyle by K K Associates Builders and DevelopersK K Associates Builders and Developers Opp. Gurudwara Amravati Road Nagpur 440023224CompletedJan 2016Jan 2016

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROSE GARDEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rui2,800+ in Nagpur

2 kmROSE GARDENCompleted 4Lapsed / revoked 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: URICH GRACE INFRASTRUCTURE PVT LTD

URICH GRACE INFRASTRUCTURE PVT LTD has 3 registrations on MahaRERA, including HIBISCUS GARDEN and ROSE GARDEN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ROSE GARDEN is delayed beyond 31 Mar 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROSE GARDEN?

The registered promoter entity is URICH GRACE INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROSE GARDEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROSE GARDEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROSE GARDEN?

The professionals named in the filing: Architect: VIRENDRA KHARE; Engineer: RAJESH KATANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROSE GARDEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSE GARDEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSE GARDEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.