Home / Browse projects / Dakshina Kannada, Karnataka / ROSARY COTTAGE

Registration approved Residential/Group Housing project

ROSARY COTTAGE

By Nidhi Land Infrastructure Developers pvt Ltd

RG-KA-60090 · RERA PRM/KA/RERA/1257/334/PR/171015/000816

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

ROSARY COTTAGE is a Residential/Group Housing project by Nidhi Land Infrastructure Developers pvt Ltd in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/171015/000816 on 15 Oct 2017. Possession is promised by 30 Jun 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameROSARY COTTAGE
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/171015/000816
  • ReraGenie IDRG-KA-60090

Builder

  • NameNidhi Land Infrastructure Developers pvt Ltd
  • Entity typeCompany
  • CINU45205KA2012PTC062255
  • Authorized SignatoryPRASHANTH K SANIL
  • Directorsharaschandra sanil
  • Other registrations1 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2017First promiseJun 2019Revised toJun 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2017
  • Promised completion30 Jun 2020
  • Revised completionRevised to 30 Jun 2020 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROSARY COTTAGE---51051

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,821 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.96 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/220620/000816Jun 2019 → Jun 2020

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/171015/000816 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: registration.jpeg-
Architect Certificate for Work Completion Schedule till DateFile: Architect Project Extention.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: engineer status of work.pdf-
CA Certificate for Funds UtilizationFile: CA 1FUND UTILISATION.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer pending work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA 2 FUND REQUIRED.pdf-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
License-
Plan 3-
Plan 1 (1)-
DEED OF SALE OF APARTMENT FORMAT-
AGREEMENT FOR SALE 1-
Plan 1 (1)-
Plan 3-
Legal Op RSR-
Pan 2-
Plan 1 (1)-
ALLOTMENT LETTER-
E BROCHURE-
Fire Noc RSR-
E BROCHURE-
EC-
kATHA rsr-
sale deed-
Relinquishment Deed-
Balance Sheet 2015 - 2016File: Balance sheet.jpg-
Balance Sheet 2014 - 2015File: balance sheet.jpg-
Balance Sheet 2013 - 2014File: Balance sheet.jpg-
Audited Profit and Loss Statement 2015 - 2016File: profit and loss .jpg-
Audited Profit and Loss Statement 2014 - 2015File: Profit and loss .jpg-
Audited Profit and Loss Statement 2013 - 2014File: Profit and Loss .jpg-
Director's Report 2015 - 2016File: Director 15-16.pdf-
Director's Report 2014 - 2015File: Director 14-15.pdf-
Director's Report 2013 - 2014File: Director 13-14.pdf-
Cash Flow Statement 2015 - 2016File: Cash flow .jpg-
Cash Flow Statement 2014 - 2015File: cash flow.jpg-
Auditor's Report 2015 - 2016File: Auditors Report.PDF-
Auditor's Report 2014 - 2015File: Auditor 14-15.pdf-
Auditor's Report 2013 - 2014File: Auditor 13-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income tax return.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: Income tax return .jpg-
Income Tax Return Acknowledgement 2013 - 2014File: Income tax return.jpg-
Affidavit-
Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_171015_000816.xlsx-
Stability CertificateFile: stability Report.jpeg-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: rsr mcc 25 drainage Order.pdf-
NOC issued by the Fire Force department after completion of workFile: rsr mcc 4 Fire NOC.pdf-
Occupancy CertificateFile: OCCUPANCY CERTIFICATE 34.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: rsr mcc 33-Lift.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Mescom.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: rsr mcc 26 Water.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Play Area.jpeg-
Details of undivided share of land handed over to the association of allotteesFile: Sale deed Rosline & Dixon RSR.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Completion Cert.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: C A Charted.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit RSR.pdf-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Vrindavan-Completed-No date filed
Sathvik-Completed-No date filed
Jardin-Completed-No date filed

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep ROSARY COTTAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmROSARY COTTAGEOther 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: Nidhi Land Infrastructure Developers pvt Ltd

Nidhi Land Infrastructure Developers pvt Ltd has 2 registrations on RERA Karnataka, including ROSARY COTTAGE and SAFAL HOMES. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if ROSARY COTTAGE is delayed beyond 30 Jun 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ROSARY COTTAGE?

The registered promoter entity is Nidhi Land Infrastructure Developers pvt Ltd, a company as per the filing. Its CIN U45205KA2012PTC062255 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ROSARY COTTAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in ROSARY COTTAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSARY COTTAGE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSARY COTTAGE to a free account