Home / Browse projects / Palghar, Maharashtra / ROOP RAJAT BUILDING N0 5A AND 5B

Registration lapsed No litigation declared Residential / Group Housing project

ROOP RAJAT BUILDING N0 5A AND 5B

By AJASRA GROUP

RG-MH-67849 · RERA P99000046984 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
29 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

ROOP RAJAT BUILDING N0 5A AND 5B is a Residential / Group Housing project by AJASRA GROUP in Palghar, Maharashtra, registered with MahaRERA as P99000046984 on 26 Sep 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 27 of the 56 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameROOP RAJAT BUILDING N0 5A AND 5B
  • TypeResidential / Group Housing
  • Location
    • BETEGAON ROAD
    • BETEGAON
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000046984
  • ReraGenie IDRG-MH-67849

Builder

  • NameAJASRA GROUP
  • Entity typePartnership
  • PartnersRAM BALI HEERALAL YADAV, AJAY VIJAYBAHADUR DUBARI YADAV

Key dates

10 months past promisethis monthRegisteredSep 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Current status

48%27 of 56 units booked
100.0%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CITY LIFE TOWERNA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

CITY LIFE TOWER: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,911 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PRABHA GROUPVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI3283.13
Proposed, not sanctioned3,283 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC 1ST FLOOR, NEAR CARE HOSPITAL ,BOISAR TARAPUR ROAD,BOISAR-400501
Estimated costRs 8.52 cr
Cost incurredRs 8.52 cr
Work done100.0%
BuildingWingEstimatedIncurred
CITY LIFE TOWERNARs 7.81 crRs 7.81 cr
-NARs 71.00 lakhRs 71.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRANAV DESHMUKH
EngineerMESHRAM AND THUKRAL
Chartered AccountantCHANDAN CHOUDARY AND ASSOCIATES
Chartered AccountantY R & ASSOACITES
PartnerRole in project
AJASRA GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 June 2025.pdf16 Jul 2026
Withdrawal Update Form 1File: Form-1 June 2025.pdf16 Jul 2026
Withdrawal Update Form 1File: Form-1 Sep 2025.pdf16 Jul 2026
Withdrawal Update Form 1File: Form-1 Dec 2025.pdf16 Jul 2026
Withdrawal Update Form 2File: Form-2 June 2025.pdf16 Jul 2026
Withdrawal Update Form 2File: Form-2 June 2025.pdf16 Jul 2026
Withdrawal Update Form 2File: Form-2 Sep 2025.pdf16 Jul 2026
Withdrawal Update Form 2File: Form-2 Dec 2025.pdf16 Jul 2026
Withdrawal Update Form 3File: Form-3 June 2025.pdf16 Jul 2026
Withdrawal Update Form 3File: Form-3 June 2025.pdf16 Jul 2026
Withdrawal Update Form 3File: Form-3 Sep 2025.pdf16 Jul 2026
Withdrawal Update Form 3File: Form-3 Dec 2025.pdf16 Jul 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1.pdf20 Dec 2024
Disclosure of sold/ booked inventoryFile: DocScanner 27 Nov 2024 11-46 am.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (2).pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Soldunsold.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AJASRA FORM 3compressed.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Roop Rajat.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Roop rajat.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A roop rajat 5a 5b fy 2023.pdf1 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-3 roop rajat.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ROOP RAJAT 5A 5B.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Roop Rajat 5A 5B.pdf9 Oct 2023
Disclosure of sold/ booked inventoryFile: sold unsold roop rajat.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AJASRA_compressed.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: soldunsold roop rajat park 5a 5b.pdf17 Apr 2023
Building plan approvalFile: WhatsApp Image 2023 1.pdf27 Jan 2023
Building plan approvalFile: WhatsApp Image 2023.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: WhatsApp Image 2023 1.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: WhatsApp Image 2023.pdf27 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 oct-dec22.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 oct-dec 22.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: sold unsold oct -dec22.pdf20 Jan 2023
CERSAI detailsFile: Ajasra CERSAI_Search_Report.pdf14 Sep 2022
Other - LegalFile: DRAFT SALE AGREEMENT AJASRA (2).pdf10 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ajasra Form-3.pdf3 Sep 2022
Other - TechnicalFile: Explanation.pdf3 Sep 2022
Other - TechnicalFile: prabha group develped agrement _compressed-1-40-1-10.pdf3 Sep 2022
Other - TechnicalFile: prabha group develped agrement _compressed-1-40-11-20.pdf3 Sep 2022
Other - TechnicalFile: prabha group develped agrement _compressed-1-40-21-30.pdf3 Sep 2022
Other - TechnicalFile: prabha group develped agrement _compressed-1-40-31-40.pdf3 Sep 2022
Details of encumbrances concerned to FinanceFile: declaration finance.pdf27 Aug 2022
Details of encumbrances concerned to LegalFile: declaration legal.pdf27 Aug 2022
Declaration about Commencement CertificateFile: declaration about commencement .pdf27 Aug 2022
Declaration in FORM BFile: affidavit cum decLAration ajasra.pdf27 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf27 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFIACTE.pdf27 Aug 2022
Proforma of Allotment letterFile: model DRAFT ALLOTMENT_compressed_compressed.pdf27 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATIONformat A.pdf27 Aug 2022
Deviation Report with respect to Allotment letterFile: deviation report DRAFT ALLOTMENT LETTER.pdf27 Aug 2022
Deviation Report with respect to model copy of AgreementFile: deviation report DSA.pdf27 Aug 2022
Layout approvalFile: LAYOUT DRAWING WITH MARKING_compressed.pdf26 Aug 2022
Building plan approvalFile: BUILDING DRAWING compressed.pdf26 Aug 2022
Copy of Layout Approval (in case of layout)File: LAYOUT DRAWING WITH MARKING_compressed.pdf26 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING DRAWING compressed.pdf26 Aug 2022
Copy of the legal title reportFile: ajasra legal title search report_compressed_compressed.pdf25 Aug 2022
PAN CardFile: PAN CARD.pdf24 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: LATEST CC_compressed_compressed.pdf24 Aug 2022

How this compares with Palghar

48%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROOP RAJAT BUILDING N0 5A AND 5B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BETEGAON3,200+ in Palghar

2 kmROOP RAJAT BUILDING N0 5Completed 16Lapsed / revoked 13Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 71 registered projects within 2 km.

Builder: AJASRA GROUP

AJASRA GROUP has 1 registration on MahaRERA, including ROOP RAJAT BUILDING N0 5A AND 5B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that ROOP RAJAT BUILDING N0 5A AND 5B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ROOP RAJAT BUILDING N0 5A AND 5B is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROOP RAJAT BUILDING N0 5A AND 5B?

The registered promoter entity is AJASRA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROOP RAJAT BUILDING N0 5A AND 5B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROOP RAJAT BUILDING N0 5A AND 5B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROOP RAJAT BUILDING N0 5A AND 5B?

The professionals named in the filing: Architect: PRANAV DESHMUKH; Engineer: MESHRAM AND THUKRAL; Chartered Accountant: CHANDAN CHOUDARY AND ASSOCIATES; Chartered Accountant: Y R & ASSOACITES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROOP RAJAT BUILDING N0 5A AND 5B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROOP RAJAT BUILDING N0 5A AND 5B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROOP RAJAT BUILDING N0 5A AND 5B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.