Home / Browse projects / Nashik, Maharashtra / ROONGTA SUPREMUS APARTMENT

Completed No litigation declared Commercial project

ROONGTA SUPREMUS APARTMENT

By ROONGTA HOMES LLP

RG-MH-75040 · RERA P51600022471 · Last updated on MahaRERA portal: 1 Jan 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 9 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
May 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

ROONGTA SUPREMUS APARTMENT is a Commercial project by ROONGTA HOMES LLP in Nashik, Maharashtra, registered with MahaRERA as P51600022471 on 25 Sep 2019. The registration is recorded completed; possession was promised by 30 May 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameROONGTA SUPREMUS APARTMENT
  • TypeCommercial
  • Location
    • NEAR CHANDAK CIRCLE
    • NASHIK
    • 422002
  • Pincode422002
  • RERA no.P51600022471
  • ReraGenie IDRG-MH-75040

Builder

  • NameROONGTA HOMES LLP
  • Entity typePartnership
  • GSTIN27AAUFR4502Q2ZE
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAKHIL LALIT ROONGTA, LALIT SATYANARAYAN ROONGTA, NIKHIL LALIT ROONGTA
  • Other registrations25 more →
  • Completed25 of 26
  • Declared earlier projects9 →

Key dates

this monthRegisteredSep 2019PromisedMay 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Sep 2019
  • Promised completion30 May 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROONGTA SUPREMUS APARTMENTNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ROONGTA SUPREMUS APARTMENT: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed193

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots193
Closed/Covered174
Open Space19

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,207 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10096.8
Proposed, not sanctioned10,086 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHARANPUR ROAD NASHIK

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR SAGAR ARUN KABRE
EngineerMR SANJEEV MADHUSUDAN PATEL
EngineerAMOL YADAVRAO BHALERAO
Chartered AccountantPrem R. Patil & Associates
Chartered AccountantPravin R. Rathi & Associates
Chartered AccountantANAND RATHI & ASSOICATES ,CHARTERED ACCOUNTANT
PartnerRole in project
ROONGTA HOMES LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12603746ROONGTA HOMES LLPMR SHAMKANT SHIVDAS MARATHE17/06/2026
CC12603753ROONGTA HOMES LLPMR NARAYAN KERUJI KSHIRSAGAR AND MRS SONALI NARAYAN KSHIRSAGAR18/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Mar 2023

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: INDEX 2 SUPREMUS RELEASE DEED.pdf1 Jan 2025
Details of encumbrances concerned to FinanceFile: INDEX 2 SUPREMUS RELEASE DEED.pdf1 Jan 2025
Details of encumbrances concerned to FinanceFile: INDEX 2 SUPREMUS RELEASE DEED.pdf1 Jan 2025
Details of encumbrances concerned to LegalFile: INDEX 2 SUPREMUS RELEASE DEED.pdf1 Jan 2025
Details of encumbrances concerned to LegalFile: INDEX 2 SUPREMUS RELEASE DEED.pdf1 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: INDEX 2 SUPREMUS DECLARATION.pdf7 May 2024
Status of ConveyanceFile: INDEX 2 SUPREMUS DECLARATION.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SUPREMUS FY 22-23.pdf2 Nov 2023
OtherFile: SUPREMUS.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: SUPREMUS SOLD 31032023-OK.pdf21 Apr 2023
PAN CardFile: PANRHLLP.pdf12 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A- SUPREMUS - MAR-22.pdf12 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200265954673_For_Asset_Based_Search_12_04_2023_13_31_28_273.pdf12 Apr 2023
Proforma of Agreement for saleFile: BASIC DRAFT.pdf12 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4.pdf12 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SUPREMUS FULL COMLETION.pdf1 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUPREMUS Q2_compressed.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SUPREMUS.pdf7 Nov 2022
Disclosure of sold/ booked inventoryFile: SUPREMUS-SEP22.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Supremus-Q1.pdf18 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE 24012022.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: SUPREMUS.pdf7 Jul 2022
Declaration about Commencement CertificateFile: FORM- D SUPREMUS.pdf30 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A- SUPREMUS - JUNE-20.pdf30 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-SUPREMUS- SEP -2020.pdf30 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-SUPREMUS- DEC -2020.pdf30 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-SUPREMUS- MAR-2021.pdf30 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUPREMUS FORM 3.pdf17 May 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY- SUPREMUS.pdf7 Apr 2022
Details of encumbrancesFile: SUPREMUS-MORTGAGE INDEX.pdf23 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 FY 20-21.pdf21 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUPREMUS_c.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: SUPREMUS31122021.pdf5 Jan 2022
Disclosure of sold/ booked inventoryFile: SUPREMUS.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Supremus_0001_compressed.pdf7 Oct 2021
OtherFile: FORM -2A SUPREMUS - SEP-21.pdf5 Oct 2021
Disclosure of sold/ booked inventoryFile: SUPREMUS.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ROONGTA SUPREMUS APARTMENT.pdf15 Aug 2021
OtherFile: SURREMUS- JUNE-21.pdf27 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf10 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-SUPREMUS- SEP -2020.pdf3 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-SUPREMUS- DEC -2020.pdf3 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-SUPREMUS- MAR-2021.pdf3 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM -5 SUPREMUS-19-20.pdf3 Apr 2021
OtherFile: FORM 2A- SUPREMUS - JUNE-20.pdf22 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A- SUPREMUS - MAR-20.pdf24 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-SUPREMUS-SEPT END.pdf7 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-SUPREMUS-DEC END.pdf7 Jan 2020
Proforma of Allotment letterFile: BASIC DRAFT.pdf22 Nov 2019
Layout approvalFile: LAYOUT.pdf16 Sep 2019
Building plan approvalFile: PLAN.pdf16 Sep 2019
Copy of the legal title reportFile: TITLE REPORT.pdf16 Sep 2019
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf16 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf16 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf16 Sep 2019
Details of encumbrancesFile: ENCUMBRANCES.pdf3 Sep 2019
Declaration in FORM BFile: FORM B.pdf3 Sep 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-SUPREMUS.pdf3 Sep 2019
Proforma of Allotment letterFile: DECLARATION PROPORMA.pdf3 Sep 2019

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE TIRUMALA GULMOHAR APARTMENTDivision Makhmalabad Shiwar NASHIK Taluka NASHIK Dist NASHIK156CompletedApr 2022Aug 2020
SHREE TIRUMALA PARAMOUNT APARTMENTTaluka NASHIK Dist NASHIK-422009173CompletedJun 2021Feb 2020
SHREE TIRUMALA REGENCY APARTMENTDeepali Nagar NASHIK Taluka NASHIK Dist NASHIK 42200950CompletedDec 2020May 2020
ROONGTA IMPERIA APARTMENTNASHIK 422001112CompletedJul 2020Mar 2019
ROONGTA HORIZON APARTMENTNASHIK 422001112CompletedJul 2020Mar 2019
SHREE TIRUMALA PLATINUM APARTMENTCOLLEGE ROAD NASHIK 42200510CompletedMay 2020Dec 2018
SHREE TIRUMALA PARADISE APARTMENTCHETANA NAGAR NASHIK 42200928CompletedSep 2019Nov 2018
SHREE TIRUMALA HARINIWAS APARTMENTSR.NO.78 PLOT NO.83 SATPUR NASHIK42CompletedMar 2019May 2018
SHREE TIRUMALA SWASTIK APARTMENTINDIRA NAGAR NASHIK28CompletedDec 2018Jun 2018

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROONGTA SUPREMUS APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

Builder: ROONGTA HOMES LLP

ROONGTA HOMES LLP has 26 registrations on MahaRERA, including SHREE TIRUMALA SWASTIK APARTMENT and SHREE TIRUMALA PARADISE APARTMENT. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ROONGTA SUPREMUS APARTMENT is delayed beyond 30 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROONGTA SUPREMUS APARTMENT?

The registered promoter entity is ROONGTA HOMES LLP, a partnership as per the filing. Its GSTIN 27AAUFR4502Q2ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROONGTA SUPREMUS APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ROONGTA SUPREMUS APARTMENT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ROONGTA SUPREMUS APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROONGTA SUPREMUS APARTMENT?

The professionals named in the filing: Architect: MR SAGAR ARUN KABRE; Engineer: MR SANJEEV MADHUSUDAN PATEL; Engineer: AMOL YADAVRAO BHALERAO; Chartered Accountant: Prem R. Patil & Associates; Chartered Accountant: Pravin R. Rathi & Associates; Chartered Accountant: ANAND RATHI & ASSOICATES ,CHARTERED ACCOUNTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROONGTA SUPREMUS APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROONGTA SUPREMUS APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROONGTA SUPREMUS APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.