Home / Browse projects / Dakshina Kannada, Karnataka / RIVER ANKORA

Registration approved No litigation declared Mixed Development project

RIVER ANKORA

By ROYAL BAWA BUILDERS

RG-KA-55453 · RERA PRM/KA/RERA/1257/334/PR/040925/008055 · Last updated on RERA Karnataka portal: 2 Sep 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 90 documents Report an error

RIVER ANKORA is a Mixed Development project by ROYAL BAWA BUILDERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/040925/008055 on 4 Sep 2025. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameRIVER ANKORA
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/040925/008055
  • ReraGenie IDRG-KA-55453

Builder

  • NameROYAL BAWA BUILDERS
  • Entity typePartnership Firm
  • GSTIN29ABAFR7181C1Z5
  • Authorized SignatoryKODI ISMAIL
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Sep 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RIVER ANKORA-----94

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 2 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
KODI ISMAIL--
ABDUL RAHIMAN JAFAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 34.33 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 34.33 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEEPU VARGHESE
EngineerSANTHOSH KUMAR SHETTY
Chartered AccountantMAHESH KUMAR K

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed90

As listed on the registration, under the names the promoter filed them with; the newest 80 of 90 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/040925/008055 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ADLR Certified survey sketchFile: ADLR Sketch.pdf2 Sep 2025
Approved building planFile: approved plan.pdf2 Sep 2025
original elevation section drawingFile: section elevation plan.pdf2 Sep 2025
commencement certificateFile: building licence new.pdf2 Sep 2025
project estimationFile: estimation cost by engineer.jpeg2 Sep 2025
clear visible approved planFile: approved plan.pdf2 Sep 2025
mescom nocFile: mescom noc.pdf2 Sep 2025
mescom fee receiptFile: mescom fee receipt.pdf2 Sep 2025
water nocFile: water noc.pdf2 Sep 2025
STP design drawing certified by the EngineerFile: STP Drawing.pdf2 Sep 2025
basement ground and typical floor planFile: floor plan.pdf2 Sep 2025
TDR CERTIFICATEFile: TDR Certificate.pdf2 Sep 2025
TDR DEEDFile: TDR deed.pdf2 Sep 2025
clarification on floor and unitsFile: clarification on floor unit.pdf2 Sep 2025
clarificationFile: clarification.pdf2 Sep 2025
FORM 1File: CA certificate river ankora.pdf1 Aug 2025
100% RERA ACCOUNTFile: 100% RERA ACCOUNT RA.pdf1 Aug 2025
70% RERA ACCOUNTFile: 70% RERA ACCOUNT RA.pdf1 Aug 2025
30% RERA ACCOUNTFile: 30% RERA ACCOUNT RA.pdf1 Aug 2025
Bank affidavitFile: Bank Affidavit River ankora .pdf1 Aug 2025
source of fundFile: source of fund.pdf1 Aug 2025
structural stability certificateFile: stability certificate.pdf1 Aug 2025
project specificationFile: specification.pdf1 Aug 2025
proforma AOSFile: proforma AOS.pdf1 Aug 2025
Proforma allottment letterFile: proforma allottment letter.pdf1 Aug 2025
fire nocFile: Fire NOC River Ankora.pdf1 Aug 2025
land cost sheetFile: land cost sheet.pdf1 Aug 2025
engineer licence self attestedFile: Engineer LBS licence.pdf1 Aug 2025
affidavit 3(!)File: affidavit 3(1).pdf1 Aug 2025
estimation cost by engineerFile: Estimation cost by engineer.pdf1 Aug 2025
form 6File: form 6 engineer certifcate.pdf1 Aug 2025
form 5File: form 5 architect certificate.pdf1 Aug 2025
ADLR Certified survey sketchFile: ADLR Sketch.pdf1 Aug 2025
master planFile: CDP planBolara River ankora.pdf1 Aug 2025
vilalge mapFile: village map-site highlighted.pdf1 Aug 2025
mangalore thota village mapFile: mangalore thota village map.pdf1 Aug 2025
clarificationFile: clarification.pdf1 Aug 2025
RTC, survey 208/1-
Mutation, survey 208/1-
Encumbrance Certificate, survey 208/1-
Conversion/Alienation Order, survey 208/1-
Sale/Title/Gift Deed, survey 208/1-
Khatha, survey 208/1-
Registration CertificateFile: firm regisatrtion certificate.pdf-
GST CertificateFile: GST.pdf-
Partnership DeedFile: new partnership deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA certificate river ankora.pdf-
Certificate issued by Architect Form 2File: form 3 architect certificate.pdf-
Certificate issued by Engineer Form 3File: form 3 engineer certifcate.pdf-
TDR Purchase Deed / Sale DeedFile: TDR deed.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2023 - 2024File: BS AY 2024-25.pdf-
Balance Sheet 2022 - 2023File: BS AY 2023-24.pdf-
Balance Sheet 2021 - 2022File: BS AY 2022-23.pdf-
Audited Profit and Loss Statement 2023 - 2024File: PL AY 2024-25.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PL AY 2023-24.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL AY 2022-23.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR AY 2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023-24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 2022-23.pdf-
building licence-
River Ankora License Plans-
Single Site layout-
broucher_compressed-
danapatra-
search report-
KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
ROYAL ARCADEREVISED CONSTRUCTION OF COMMERCIAL CUM RESIDENTIAL APARTMENT BUILDING , AT S.N. 650/1B(P), 650/2B(P), OF ATTAVARA VILLAGE MANGALORE , Mangalore , Dakshina Kannada, Karnataka - 575001Completed-No date filed

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep RIVER ANKORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: ROYAL BAWA BUILDERS

ROYAL BAWA BUILDERS has 4 registrations on RERA Karnataka, including SANNIDHI ENCLAVE and RIVER ANKORA. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if RIVER ANKORA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of RIVER ANKORA?

The registered promoter entity is ROYAL BAWA BUILDERS, a partnership firm as per the filing. Its GSTIN 29ABAFR7181C1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in RIVER ANKORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RIVER ANKORA?

The professionals named in the filing: Architect: DEEPU VARGHESE; Engineer: SANTHOSH KUMAR SHETTY; Chartered Accountant: MAHESH KUMAR K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVER ANKORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVER ANKORA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVER ANKORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.