Home / Browse projects / Sangli, Maharashtra / RIVA ICONIC A
RIVA ICONIC A
RG-MH-38542 · RERA P53100017652 · Last updated on MahaRERA portal: 31 Mar 2024
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIVA ICONIC A is a Residential / Group Housing project by SUNIL SUBHASH PATIL in Sangli, Maharashtra, registered with MahaRERA as P53100017652 on 4 Sep 2018. The registration is recorded completed; possession was promised by 30 Jun 2022.
At a glance
Project
- NameRIVA ICONIC A
- TypeResidential / Group Housing
- Location
- Anna Satyagonda Patil Nagar road
- Near ST stand
- Sangli
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- RERA no.P53100017652
- ReraGenie IDRG-MH-38542
Builder
- NameSUNIL SUBHASH PATIL
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Sep 2018
- Promised completion30 Jun 2022
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RIVA ICONIC A | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
RIVA ICONIC A: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 31 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rachana Sharma |
| Partner | Role in project |
|---|---|
| SUNIL SUBHASH PATIL | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, As per registration the Project Riva Iconic A has to complete before 30/06/2022 but due to certain conditions at our location like flood in our area, market conditions, covid19 pandemic etc we decided to postpone the construction activity. As the construction activity has not started as per planned hence extension is required. We had also received mail from Maharera dated 27/06/2021 regrading to submit consent of allottee but till we had not taken any booking (Refer CA certififcate form3 & disclosure of sold apartment). Now we are ready to start the construction and as well as to tak
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 31 Mar 2024
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RIA_ Completion Certificate.pdf | 31 Mar 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: RIA_Architect Certificate (4-3-24).pdf | 31 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RBD Form 5 2022-23.pdf | 6 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD ARCH March 2023.pdf | 6 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD ENGG Mar 2023.pdf | 6 Jun 2023 |
| Certificates of CA (Form 3)File: RBD CA Marc 2023.pdf | 6 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RIA FORM 5_compressed.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RIA FORM 5_compressed.pdf | 24 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD FORM 1 September 2022.pdf | 28 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD Form 1 December 2022.pdf | 28 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD Form 2 September 2022.pdf | 27 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD From 2 December 2022.pdf | 27 Jan 2023 |
| Certificates of CA (Form 3)File: RBD Form 3 CA SEP 2022.pdf | 27 Jan 2023 |
| Certificates of CA (Form 3)File: RBD Form 3 CA December 2022.pdf | 27 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA FORM 1.pdf | 16 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA FORM 2-compressed.pdf | 16 Sep 2022 |
| Certificates of CA (Form 3)File: RIA FORM 3_compressed-compressed.pdf | 16 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA Form 2 March 2022_compressed.pdf | 26 May 2022 |
| Certificates of CA (Form 3)File: RIA CA MARCHE 2022_compressed.pdf | 26 May 2022 |
| Certificates of CA (Form 3)File: RIA CA MARCHE 2022_compressed.pdf | 26 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENG DEC 21.pdf | 21 Jan 2022 |
| Certificates of CA (Form 3)File: RIA CA Dec 21_compressed (1).pdf | 21 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARCH Jun 2021_compressed.pdf | 7 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA Arch SEP 2021_compressed.pdf | 7 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA Arch DEC 2021_compressed.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENG June 2021_compressed.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA Eng SEP 2021_compressed.pdf | 7 Jan 2022 |
| Certificates of CA (Form 3)File: RIA CA June 2021_compressed.pdf | 7 Jan 2022 |
| Certificates of CA (Form 3)File: RIA CA SEP 2021_compressed.pdf | 7 Jan 2022 |
| Declaration about Commencement CertificateFile: RIA DCC.pdf | 5 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RIA ENGG QA 19-20.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RIA FORM 5 2018-19.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RIA Form 5 19-20.pdf | 5 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG MAR 20.pdf | 24 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG JUN 20.pdf | 24 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG SEP 20.pdf | 24 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG DEC 20.pdf | 24 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG MAR 21.pdf | 24 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RIA ENGG QA MAR 20-21.pdf | 24 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: RIA SOLD FLAT MAR 21.pdf | 24 Jun 2021 |
| Building plan approvalFile: RIA MNP REVISE BLUE PRINT.pdf | 23 Jun 2021 |
| Building Plan Approval (IOD)File: RIA MNP REVISE BLUE PRINT.pdf | 23 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: RIA MNP REVISE PERMISSION.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC MAR 20.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC JUN 20.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC SEP 20.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC DEC 20.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC MAR 21.pdf | 23 Jun 2021 |
| Certificates of CA (Form 3)File: RIA CA MAR 20.pdf | 23 Jun 2021 |
| Certificates of CA (Form 3)File: RIA CA JUN 20.pdf | 23 Jun 2021 |
| Certificates of CA (Form 3)File: RIA CA SEP 20.pdf | 23 Jun 2021 |
| Certificates of CA (Form 3)File: RIA CA DEC 20.pdf | 23 Jun 2021 |
| Certificates of CA (Form 3)File: RIA CA Mar 21.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RIA CA Form 5 20-21.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RIA CA Form 5 20-21.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA RERA DEC 19 ARCH.pdf | 21 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA RERA DEC 19 ENG.pdf | 21 Feb 2020 |
| Certificates of CA (Form 3)File: RIA RERA DEC 19 CA.pdf | 21 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA OCT 19 ARCH RIA Min2.pdf | 16 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA OCT 19 ENG RIA.pdf | 16 Nov 2019 |
| Certificates of CA (Form 3)File: RERA OCT 19 CA RIA Min.pdf | 16 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA JUN 19 ARCH RIA.pdf | 20 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA JUN 19 ENG RIA.pdf | 20 Sep 2019 |
| Certificates of CA (Form 3)File: RERA JUN 19 CA RIA.pdf | 20 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Ma19 Arch RIA Final.pdf | 11 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Ma19 ENG RIA Final.pdf | 11 May 2019 |
| Certificates of CA (Form 3)File: RERA Ma19 CA RIA Final.pdf | 11 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Min Architect Certificate RIA.pdf | 19 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Min Engineer Certificate RIA.pdf | 19 Jan 2019 |
| Certificates of CA (Form 3)File: CA cert RIA.pdf | 19 Jan 2019 |
| Building plan approvalFile: Blue print 17 23.pdf | 16 Aug 2018 |
| Layout approvalFile: Blank 2.pdf | 16 Aug 2018 |
| PAN CardFile: Pan Sunil Patil.pdf | 16 Aug 2018 |
| Copy of the legal title reportFile: Legal and Title 17 23 com.pdf | 16 Aug 2018 |
| Details of encumbrancesFile: Encumbrance Certificate 17 23.pdf | 16 Aug 2018 |
| Copy of Layout Approval (in case of layout)File: Blank 2.pdf | 16 Aug 2018 |
| Building Plan Approval (IOD)File: Blue print 17 23.pdf | 16 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate 17 23.pdf | 16 Aug 2018 |
| Declaration in FORM BFile: Form B 17 23-min.pdf | 16 Aug 2018 |
| Certificates of CA (Form 3)File: C A certificate 17 23.pdf | 16 Aug 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- All 81 filed documents as one ZIP, foldered, with a manifest
Keep RIVA ICONIC A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near ST stand, Sangli790+ in Sangli
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: SUNIL SUBHASH PATIL
SUNIL SUBHASH PATIL has 1 registration on MahaRERA, including RIVA ICONIC A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if RIVA ICONIC A is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIVA ICONIC A?
The registered promoter entity is SUNIL SUBHASH PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIVA ICONIC A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RIVA ICONIC A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIVA ICONIC A?
The professionals named in the filing: Architect: Rachana Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIVA ICONIC A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.