Home / Browse projects / Sangli, Maharashtra / RIVA ICONIC A

Completed No litigation declared Residential / Group Housing project

RIVA ICONIC A

By SUNIL SUBHASH PATIL

RG-MH-38542 · RERA P53100017652 · Last updated on MahaRERA portal: 31 Mar 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

RIVA ICONIC A is a Residential / Group Housing project by SUNIL SUBHASH PATIL in Sangli, Maharashtra, registered with MahaRERA as P53100017652 on 4 Sep 2018. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameRIVA ICONIC A
  • TypeResidential / Group Housing
  • Location
    • Anna Satyagonda Patil Nagar road
    • Near ST stand
    • Sangli
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • RERA no.P53100017652
  • ReraGenie IDRG-MH-38542

Builder

  • NameSUNIL SUBHASH PATIL
  • Entity typeIndividual

Key dates

this monthRegisteredSep 2018PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Sep 2018
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RIVA ICONIC ANA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

RIVA ICONIC A: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area859 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1506.97
Proposed, not sanctioned1,222 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThe Ratnakar Bank Ltd, Mehendale Kulkarni Bhavan, Gaonbhag, Sangli 416416

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRachana Sharma
PartnerRole in project
SUNIL SUBHASH PATIL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100010307Jun 2022 → Dec 2023

Reason as filed by the promoterDear Sir, As per registration the Project Riva Iconic A has to complete before 30/06/2022 but due to certain conditions at our location like flood in our area, market conditions, covid19 pandemic etc we decided to postpone the construction activity. As the construction activity has not started as per planned hence extension is required. We had also received mail from Maharera dated 27/06/2021 regrading to submit consent of allottee but till we had not taken any booking (Refer CA certififcate form3 & disclosure of sold apartment). Now we are ready to start the construction and as well as to tak

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Mar 2024

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RIA_ Completion Certificate.pdf31 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: RIA_Architect Certificate (4-3-24).pdf31 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RBD Form 5 2022-23.pdf6 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD ARCH March 2023.pdf6 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD ENGG Mar 2023.pdf6 Jun 2023
Certificates of CA (Form 3)File: RBD CA Marc 2023.pdf6 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RIA FORM 5_compressed.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RIA FORM 5_compressed.pdf24 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD FORM 1 September 2022.pdf28 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD Form 1 December 2022.pdf28 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD Form 2 September 2022.pdf27 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD From 2 December 2022.pdf27 Jan 2023
Certificates of CA (Form 3)File: RBD Form 3 CA SEP 2022.pdf27 Jan 2023
Certificates of CA (Form 3)File: RBD Form 3 CA December 2022.pdf27 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA FORM 1.pdf16 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA FORM 2-compressed.pdf16 Sep 2022
Certificates of CA (Form 3)File: RIA FORM 3_compressed-compressed.pdf16 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA Form 2 March 2022_compressed.pdf26 May 2022
Certificates of CA (Form 3)File: RIA CA MARCHE 2022_compressed.pdf26 May 2022
Certificates of CA (Form 3)File: RIA CA MARCHE 2022_compressed.pdf26 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENG DEC 21.pdf21 Jan 2022
Certificates of CA (Form 3)File: RIA CA Dec 21_compressed (1).pdf21 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARCH Jun 2021_compressed.pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA Arch SEP 2021_compressed.pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA Arch DEC 2021_compressed.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENG June 2021_compressed.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA Eng SEP 2021_compressed.pdf7 Jan 2022
Certificates of CA (Form 3)File: RIA CA June 2021_compressed.pdf7 Jan 2022
Certificates of CA (Form 3)File: RIA CA SEP 2021_compressed.pdf7 Jan 2022
Declaration about Commencement CertificateFile: RIA DCC.pdf5 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RIA ENGG QA 19-20.pdf5 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RIA FORM 5 2018-19.pdf5 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RIA Form 5 19-20.pdf5 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG MAR 20.pdf24 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG JUN 20.pdf24 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG SEP 20.pdf24 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG DEC 20.pdf24 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA ENGG MAR 21.pdf24 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RIA ENGG QA MAR 20-21.pdf24 Jun 2021
Disclosure of sold/ booked inventoryFile: RIA SOLD FLAT MAR 21.pdf24 Jun 2021
Building plan approvalFile: RIA MNP REVISE BLUE PRINT.pdf23 Jun 2021
Building Plan Approval (IOD)File: RIA MNP REVISE BLUE PRINT.pdf23 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: RIA MNP REVISE PERMISSION.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC MAR 20.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC JUN 20.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC SEP 20.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC DEC 20.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA ARC MAR 21.pdf23 Jun 2021
Certificates of CA (Form 3)File: RIA CA MAR 20.pdf23 Jun 2021
Certificates of CA (Form 3)File: RIA CA JUN 20.pdf23 Jun 2021
Certificates of CA (Form 3)File: RIA CA SEP 20.pdf23 Jun 2021
Certificates of CA (Form 3)File: RIA CA DEC 20.pdf23 Jun 2021
Certificates of CA (Form 3)File: RIA CA Mar 21.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RIA CA Form 5 20-21.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RIA CA Form 5 20-21.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RIA RERA DEC 19 ARCH.pdf21 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RIA RERA DEC 19 ENG.pdf21 Feb 2020
Certificates of CA (Form 3)File: RIA RERA DEC 19 CA.pdf21 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA OCT 19 ARCH RIA Min2.pdf16 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA OCT 19 ENG RIA.pdf16 Nov 2019
Certificates of CA (Form 3)File: RERA OCT 19 CA RIA Min.pdf16 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA JUN 19 ARCH RIA.pdf20 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA JUN 19 ENG RIA.pdf20 Sep 2019
Certificates of CA (Form 3)File: RERA JUN 19 CA RIA.pdf20 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Ma19 Arch RIA Final.pdf11 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Ma19 ENG RIA Final.pdf11 May 2019
Certificates of CA (Form 3)File: RERA Ma19 CA RIA Final.pdf11 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Min Architect Certificate RIA.pdf19 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Min Engineer Certificate RIA.pdf19 Jan 2019
Certificates of CA (Form 3)File: CA cert RIA.pdf19 Jan 2019
Building plan approvalFile: Blue print 17 23.pdf16 Aug 2018
Layout approvalFile: Blank 2.pdf16 Aug 2018
PAN CardFile: Pan Sunil Patil.pdf16 Aug 2018
Copy of the legal title reportFile: Legal and Title 17 23 com.pdf16 Aug 2018
Details of encumbrancesFile: Encumbrance Certificate 17 23.pdf16 Aug 2018
Copy of Layout Approval (in case of layout)File: Blank 2.pdf16 Aug 2018
Building Plan Approval (IOD)File: Blue print 17 23.pdf16 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate 17 23.pdf16 Aug 2018
Declaration in FORM BFile: Form B 17 23-min.pdf16 Aug 2018
Certificates of CA (Form 3)File: C A certificate 17 23.pdf16 Aug 2018

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep RIVA ICONIC A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near ST stand, Sangli790+ in Sangli

Builder: SUNIL SUBHASH PATIL

SUNIL SUBHASH PATIL has 1 registration on MahaRERA, including RIVA ICONIC A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if RIVA ICONIC A is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIVA ICONIC A?

The registered promoter entity is SUNIL SUBHASH PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIVA ICONIC A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RIVA ICONIC A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIVA ICONIC A?

The professionals named in the filing: Architect: Rachana Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVA ICONIC A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVA ICONIC A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVA ICONIC A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.