Home / Browse projects / Mumbai Suburban, Maharashtra / Rite Perinto
Rite Perinto
RG-MH-23967 · RERA P51800005813 · Last updated on MahaRERA portal: 6 Jan 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 55 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rite Perinto is a Residential / Group Housing project by Rite Developers Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005813 on 14 Aug 2017. Possession was promised by 30 Mar 2022 and is now 55 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameRite Perinto
- TypeResidential / Group Housing
- Location
- Dattapada Road
- Diwan Compound Asara Colony
- Borivali
- Mumbai Suburban
- 400067
- Pincode400067
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005813
- ReraGenie IDRG-MH-23967
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion30 Mar 2022
- Revised completionRevised to 30 Mar 2022 (originally 30 Mar 2021)
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rite Perinto | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
Rite Perinto: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 6 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Others | No | Not applicable |
Parking filed15
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS TANVI DEDHIA |
| Engineer | Rajesh Tailor |
| Chartered Accountant | Jigar Zaveri & Associates |
| Chartered Accountant | C S Mehta & Co |
| Partner | Role in project |
|---|---|
| Rite Developers Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby submit and Declare that delay in project and delay in getting approvals are due to implementation of DCPR 2034. We obtain Commencement Certificate bearing No. CHE/WSII/0575/R1/337(New)/FCC/1/New dated 17th March, 2020 for upto 9th Slabs. We further state that due to outbreak of life threatening COVID-19 which had already been declared as a Pandemic by World Health Organization (WHO) and complete lockdown imposed in the country and Authority had invoked force majeure clause, in such situation we could not carry out construction activity and once it got unlocked, we commenced Construct
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000374812 | GUMPHADARSHAN A&B CHS LTD R S PAI | RITE DEVELOPERS PVT LTD | 16/03/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jan 2024
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Gumpha Part OC 04012024.pdf | 6 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Perinto.pdf | 17 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Form 1 Rite Perinto 30 Sep 2023.pdf | 10 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed Rite Perinto Engineer Form 2 September 23.pdf | 7 Oct 2023 |
| Certificates of CA (Form 3)File: Signed CA Certificate Rite Perinto 30 June 23.pdf | 25 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Rite Perinto architect Form 1 June 2023 (5).pdf | 18 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed Aspire Engineer Form 2 - June 23.pdf | 18 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed Rite Perinto Engineer Form 2 June 23.pdf | 13 Jul 2023 |
| OtherFile: 5_6296554753245579468.pdf | 16 Feb 2023 |
| OtherFile: architect certificate other.pdf | 14 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rite Perinto Architect form 1 30 sep 2022.pdf | 5 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rite Perinto Architect form 1 31 dec 2022.pdf | 5 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO sep 2020.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO dec 2020.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO march 2021.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO june 2021.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO sep 2021.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO dec 2021.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO march 2022.pdf | 7 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RITE PERINTO june 2022.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 30 SEP 2020.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 31 DEC 2020.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 31 MAR 2021.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 30 JUN 2021.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 30 SEP 2021.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 31 DEC 2021.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 31 MAR 2022.pdf | 7 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RITE PERINTO 30 JUN 2022.pdf | 7 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Rite Perinto Commencement Certificate.pdf | 20 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Rite Perinto.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Rite Perinto.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A QAC Rite Perinto FY 2019-2020.pdf | 11 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A QAC Rite Perinto FY 2020-2021.pdf | 11 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Rite Perinto.pdf | 10 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Rite Perinto.pdf | 10 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 Rite Perinto.pdf | 10 Aug 2021 |
| Declaration about Commencement CertificateFile: Format D Rite Perinto 06082021.pdf | 7 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 0575_FurtherCC_signed.pdf | 6 Aug 2021 |
| Building plan approvalFile: Rite Perinto - Amended Approval Letter.pdf | 14 Jul 2021 |
| Layout approvalFile: Plan 3-4-1 (1).pdf | 14 Jul 2021 |
| Layout approvalFile: Plan 3-4-2 (1).pdf | 14 Jul 2021 |
| Layout approvalFile: Plan 5-6-1.pdf | 14 Jul 2021 |
| Layout approvalFile: Plan 5-6-2.pdf | 14 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Plan 3-4-1 (1).pdf | 14 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Plan 3-4-2 (1).pdf | 14 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Plan 5-6-1.pdf | 14 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Plan 5-6-2.pdf | 14 Jul 2021 |
| Building Plan Approval (IOD)File: Rite Perinto - Amended Approval Letter.pdf | 14 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Rite Perinto.pdf | 9 Jun 2021 |
| Certificates of CA (Form 3)File: FORM 3 Rite Perinto.pdf | 21 Jul 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Rite Perinto CC.pdf | 17 Mar 2020 |
| Building plan approvalFile: IOD.pdf | 17 Feb 2020 |
| Building plan approvalFile: IOD (2).pdf | 17 Feb 2020 |
| Building plan approvalFile: IOD (4).pdf | 17 Feb 2020 |
| Building Plan Approval (IOD)File: IOD.pdf | 17 Feb 2020 |
| Building Plan Approval (IOD)File: IOD (2).pdf | 17 Feb 2020 |
| Building Plan Approval (IOD)File: IOD (4).pdf | 17 Feb 2020 |
| OtherFile: Provisional CFO NOC_compressed.pdf | 9 Jan 2020 |
| OtherFile: CFO NOC.pdf | 13 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: rite perinto.pdf | 11 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 RITE PERINTO.pdf | 25 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 RITE PERINTO.pdf | 25 Oct 2018 |
| Certificates of CA (Form 3)File: FORM 3 RITE PERINTO.pdf | 25 Oct 2018 |
| Certificates of CA (Form 5)File: FORM 5 RITE PERINTO.pdf | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MunArch Certificate.pdf | 2 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Certificate.pdf | 2 Aug 2018 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf | 2 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Rite Perimto.pdf | 30 Dec 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Rite Perimto.pdf | 30 Dec 2017 |
| Certificates of CA (Form 3)File: Form 3 Rite Perimto.pdf | 30 Dec 2017 |
| Building plan approvalFile: IOD.pdf | 28 Jul 2017 |
| Layout approvalFile: (1) IOD.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: (1) IOD.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 28 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Agreement For Sale.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Allottment Letter .pdf | 28 Jul 2017 |
| OtherFile: Resolution.pdf | 28 Jul 2017 |
| OtherFile: GIS Survey Certificate.pdf | 28 Jul 2017 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Rite Prime | Andheri West | 9 | Completed | May 2016 | Late, Mar 2018 |
| Rite Celesta | Kandivali West | 24 | Completed | Jun 2015 | Late, Sep 2017 |
| Rite Opus | Kandivali West | 16 | Completed | Mar 2015 | Late, Mar 2016 |
| Rite Splendor | Borivali East | 31 | Completed | Dec 2014 | Late, Apr 2015 |
| Rite Senor | Mulund East | 43 | Completed | Mar 2014 | Late, May 2015 |
| Rite Fortune | Kandivali West | 51 | Completed | Apr 2013 | Late, Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Rite Perinto on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Diwan Compound Asara Colony6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 442 registered projects within 2 km.
Ruparel Optima Ph I
Ruparel Infra & Realty Pvt Ltd
"SALE BLDG NO. 6 (A & B) WING KNOWN AS NORTHER
N.ROSE DEVELOPERS PVT LTD
JP Commerz
Metallica Industries Limited
Ruparel Skygreens I
Shree Siddhivinayak Infrastructure & Realt
ShreejiAikyam
Rushabh Developers
Shiv Vardaan
NAVKARMIK HOMES LLP, URVI CONSTRUCTION
See every Mumbai Suburban project, with the district possession charts
Builder: Rite Developers Pvt. Ltd.
Rite Developers Pvt. Ltd. has 10 registrations on MahaRERA, including Rite Bliss and Rite Aspire. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Rite Perinto shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Rite Perinto is delayed beyond 30 Mar 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rite Perinto?
The registered promoter entity is Rite Developers Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rite Perinto?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Rite Perinto?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Rite Perinto?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rite Perinto?
The professionals named in the filing: Architect: MS TANVI DEDHIA; Engineer: Rajesh Tailor; Chartered Accountant: Jigar Zaveri & Associates; Chartered Accountant: C S Mehta & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rite Perinto?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback