ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / RISHABH HEIGHTS

Registered No litigation declared Residential / Group Housing project

RISHABH HEIGHTS

By NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED

RG-MH-45469 · RERA P99000011841 · Last updated on MahaRERA portal: 27 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 72 months from the original
7 of 11Construction stages donefurthest along: Installation of Lifts, 95%
25 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

RISHABH HEIGHTS is a Residential / Group Housing project by NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000011841 on 31 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing. 22 of the 47 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameRISHABH HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Vasai-Virar City
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000011841
  • ReraGenie IDRG-MH-45469

Builder

  • NameNANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AACCV1481B1ZM
  • Managing DirectorsNANDISH ONKARLAL JAIN, LOKESH ONKARLAL JAIN, ONKARLAL NATHULAL JAIN, ARUNA LOKESH JAIN, MAMTA NANDISH JAIN

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed96 files

Current status

47%22 of 47 units booked
100.0%Work done, per cost certificate

Figures as on 27 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RISHABH HEIGHTSNA141247047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

RISHABH HEIGHTS: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 27 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area663 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2026

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI2734.18
Proposed, not sanctioned2,734 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANAND BHAVAN VP ROAD MUMBAI 400004
Estimated costRs 6.85 cr
Cost incurredRs 6.85 cr
Work done100.0%
BuildingWingEstimatedIncurred
RISHABH HEIGHTSNARs 6.44 crRs 6.44 cr
-NARs 41.09 lakhRs 41.09 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE AND ASSOCIATES
EngineerSHAH AND GATTANI
EngineerAPTE ASSOCIATES
EngineerVinod Jamnalal Vakavat
Chartered AccountantMRV & Associates
Chartered AccountantB.L. DASHARDA & ASSOCIATES
PartnerRole in project
NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000016521Dec 2021 → Dec 2023

Reason as filed by the promoterCOVID RESTRICTIONS

EA20082622288Dec 2021 → Dec 2027

Reason as filed by the promotera) The project could not be completed within the originally approved timeline primarily due to a delay in arranging the required funds for carrying out the project activities. The financial constraints resulted in a delay in execution of certain activities and consequentially affected the overall project completion schedule. b) The Promoter has subsequently arranged the requisite funds and completed the project work. At present, the project is substantially/fully completed and is at the stage of obtaining the requisite statutory clearances and approvals. c) The Promoter is in the process of su

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AR - March 24.pdf27 Aug 2026
Form 2File: ER March 24.pdf27 Aug 2026
Form 3File: CA- March 24.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf27 Aug 2026
Form 1File: AR - June 24.pdf27 Aug 2026
Form 2File: ER - June 24.pdf27 Aug 2026
Form 3File: CA - June 24.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf27 Aug 2026
Form 1File: AR -Sept 24.pdf27 Aug 2026
Form 2File: ER - sept 24.pdf27 Aug 2026
Form 3File: CA - Sept 24.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf27 Aug 2026
Form 1File: AR - Dec 24.pdf27 Aug 2026
Form 2File: ER - Dec 24.pdf27 Aug 2026
Form 3File: CA - Dec 24.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf27 Aug 2026
Form 1File: AR - March 25.pdf27 Aug 2026
Form 2File: ER - March 25.pdf27 Aug 2026
Form 3File: CA - March 25.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf27 Aug 2026
Withdrawal Update Form 1File: AR - June 25.pdf27 Aug 2026
Withdrawal Update Form 1File: AR - Sept 25.pdf27 Aug 2026
Withdrawal Update Form 1File: AR - Dec 25.pdf27 Aug 2026
Withdrawal Update Form 1File: AR - March 26.pdf27 Aug 2026
Withdrawal Update Form 1File: Form-1 June 26.pdf27 Aug 2026
Withdrawal Update Form 2File: ER - June 25.pdf27 Aug 2026
Withdrawal Update Form 2File: ER - Sept 25.pdf27 Aug 2026
Withdrawal Update Form 2File: ER - Dec 25.pdf27 Aug 2026
Withdrawal Update Form 2File: ER - March 26.pdf27 Aug 2026
Withdrawal Update Form 2File: Form-2-June 26.pdf27 Aug 2026
Withdrawal Update Form 3File: CA - June 25.pdf27 Aug 2026
Withdrawal Update Form 3File: CA - Sept 25.pdf27 Aug 2026
Withdrawal Update Form 3File: CA - Dec 25.pdf27 Aug 2026
Withdrawal Update Form 3File: CA - March 26.pdf27 Aug 2026
Withdrawal Update Form 3File: Form 3 June 2026.pdf27 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A - 2025.pdf27 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A - 2026.pdf27 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 year 2024 - 25.pdf27 Aug 2026
Form 1File: AR - Dec 23.pdf21 Aug 2026
Form 2File: ER - Dec 23.pdf21 Aug 2026
Form 3File: 4-CA - Dec 23.pdf21 Aug 2026
Disclosure of Sold and Booked InventoryFile: Dis-2023.pdf21 Aug 2026
Form 1File: AR - Sept 23.pdf21 Aug 2026
Form 2File: ER - Sept 23.pdf21 Aug 2026
Form 3File: 3-CA - Sept 23.pdf21 Aug 2026
Disclosure of Sold and Booked InventoryFile: Dis-Sep 23.pdf21 Aug 2026
Form 1File: AR - June 23.pdf21 Aug 2026
Form 2File: ER - June 23.pdf21 Aug 2026
Form 3File: 2-CA - June 23.pdf21 Aug 2026
Disclosure of Sold and Booked InventoryFile: Dis-June 23.pdf21 Aug 2026
Form 3File: 1-CA - March 23.pdf20 Aug 2026
Form 1File: AR - March 23.pdf20 Aug 2026
Form 2File: ER - March 23.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 31032023.pdf20 Aug 2026
Form 2A (FY 2017-2018)File: Form 2A March 2018.pdf20 Aug 2026
Form 2A (FY 2018-2019)File: Form 2A - 2019.pdf20 Aug 2026
Form 2A (FY 2019-2020)File: Form 2A - 2020.pdf20 Aug 2026
Form 2A (FY 2020-2021)File: Form 2A - 2021.pdf20 Aug 2026
Form 2A (FY 2021-2022)File: Form 2A - 2022.pdf20 Aug 2026
Form 2A (FY 2022-2023)File: Form 2A - 2023.pdf20 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A - 2024.pdf20 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 year 2023 - 24.pdf20 Aug 2026
Form 5 (FY 2017-2018)File: Form 5 year 2017 - 18.pdf20 Aug 2026
Form 5 (FY 2018-2019)File: Form 5 year 2018 - 19.pdf20 Aug 2026
Form 5 (FY 2019-2020)File: Form 5 year 2019 - 20.pdf20 Aug 2026
Form 5 (FY 2020-2021)File: Form 5 year 2020 - 21.pdf20 Aug 2026
Form 5 (FY 2021-2022)File: Form 5 year 2021 - 22.pdf20 Aug 2026
Form 5 (FY 2022-2023)File: Form 5 FY 2022-23.pdf20 Aug 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf4 Jan 2024
Certificates of CA (Form 3)File: FORM 3 - CA Certificate.pdf27 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: APTE ASSOCIATES - CERTIFICATE.pdf16 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf10 May 2023
Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold booked inventory.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate on Quality Assurance (Form 2A FY 2021-22).pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21_Signed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22_Signed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY17-18.pdf22 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY18-19.pdf22 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY19-20.pdf22 Oct 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf28 Jul 2021

How this compares with Palghar

47%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 72 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RISHABH HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmRISHABH HEIGHTSCompleted 63Lapsed / revoked 37Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 149 registered projects within 2 km.

Builder: NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED

NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including RISHABH HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if RISHABH HEIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RISHABH HEIGHTS?

The registered promoter entity is NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AACCV1481B1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RISHABH HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RISHABH HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RISHABH HEIGHTS?

The professionals named in the filing: Architect: AJAY WADE AND ASSOCIATES; Engineer: SHAH AND GATTANI; Engineer: APTE ASSOCIATES; Engineer: Vinod Jamnalal Vakavat; Chartered Accountant: MRV & Associates; Chartered Accountant: B.L. DASHARDA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RISHABH HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RISHABH HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RISHABH HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one