Home / Browse projects / Nashik, Maharashtra / RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B

Registration lapsed No litigation declared Residential / Group Housing project

RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B

By Suresh Vishwanath Patil HUF

RG-MH-41962 · RERA P51600020115 · Last updated on MahaRERA portal: 9 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B is a Residential / Group Housing project by Suresh Vishwanath Patil HUF in Nashik, Maharashtra, registered with MahaRERA as P51600020115 on 28 Mar 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameRIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B
  • TypeResidential / Group Housing
  • Location
    • KUNDEWADI
    • NR MARUTI TEMPLE
    • Gitakunj
    • Niphad
    • Nashik
    • 422303
  • Pincode422303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600020115
  • ReraGenie IDRG-MH-41962

Builder

  • NameSuresh Vishwanath Patil HUF
  • Entity typeOthers
  • Named personSURESH VISHWANATH PATIL

Key dates

22 months past promisethis monthRegisteredMar 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Mar 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RIDDHI APARTMENT WING ANA40000
SIDDHI APARTMENT WING BNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

RIDDHI APARTMENT WING A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SIDDHI APARTMENT WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26
BuildingClosed/CoveredTotal
RIDDHI APARTMENT WING A1212
SIDDHI APARTMENT WING B1414

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area773 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1105.0
Proposed, not sanctioned1,105 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKUNDEWADI GITAKUNJ TAL NIPHAD DIST NASHIK 422303

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJIT KULKARNI
EngineerLP CONSTRUCTION
Chartered AccountantCA ARCHANA CHAUDHARI
PartnerRole in project
Suresh Vishwanath Patil HUF-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2024

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Unsold inventory, Riddhi park.pdf9 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Suresh Patil HUF 202223.pdf9 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf9 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Suresh Patil HUF 202324.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate.pdf4 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf4 Apr 2024
Form 2AFile: Form 2A - Quality Surveyor.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf25 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate FY 22-23 q4.pdf20 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate FY 23-24 Q3.pdf20 Mar 2024
Form 2AFile: Sup Certificate Dec 23.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sup Certificate March 23.pdf20 Mar 2024
Certificates of CA (Form 3)File: CA certificate FY22-23 Q4.pdf20 Mar 2024
Certificates of CA (Form 3)File: Ca certificate Fy 23-24 Q3.pdf20 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances letter.pdf16 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances letter.pdf16 Mar 2024
Declaration about Commencement CertificateFile: Commencement Certificate.pdf16 Mar 2024
Proforma of Agreement for saleFile: KararnamaAggfor sale Kundewadi.pdf16 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf17 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Form 3.pdf9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf9 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A.pdf9 Feb 2023
Certificates of CA (Form 3)File: CA Form 3.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf9 Feb 2023
OtherFile: L P ConstructionBank Statements.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf16 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-compressed.pdf16 Oct 2021
Form 2AFile: From -2A_compressed.pdf16 Oct 2021
Certificates of CA (Form 3)File: Form 3_compressed.pdf16 Oct 2021
Certificates of CA (Form 3)File: Form 3_compressed.pdf16 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf16 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf16 Oct 2021
OtherFile: Dev agg kundewadi_Split.pdf16 Oct 2021
OtherFile: Annexure A Scanned_compressed.pdf16 Oct 2021
OtherFile: G P kundewadi_Split.pdf16 Oct 2021
OtherFile: Edited_ Kararnama_Agg for sale Kundewadi.pdf16 Oct 2021
Form 2AFile: d_QuarterlyCertificates.pdf22 Jun 2019
Building plan approvalFile: Building Approval Plan.pdf15 Mar 2019
Layout approvalFile: NamunaNo8.pdf15 Mar 2019
PAN CardFile: HUF PAN Card.pdf15 Mar 2019
Copy of the legal title reportFile: Legal Search Report.pdf15 Mar 2019
Details of encumbrancesFile: Encumbrances letter.pdf15 Mar 2019
Copy of Layout Approval (in case of layout)File: NamunaNo8.pdf15 Mar 2019
Building Plan Approval (IOD)File: Building Approval Plan.pdf15 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Mar 2019
Declaration in FORM BFile: Declaration DeedFormB.pdf15 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf15 Mar 2019
Certificates of CA (Form 3)File: CA Certificate.pdf15 Mar 2019
Proforma of Allotment letterFile: Kararnama.pdf15 Mar 2019
OtherFile: OtherPapers.pdf15 Mar 2019

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NR MARUTI TEMPLE4,100+ in Nashik

Builder: Suresh Vishwanath Patil HUF

Suresh Vishwanath Patil HUF has 1 registration on MahaRERA, including RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B?

The registered promoter entity is Suresh Vishwanath Patil HUF, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B?

The professionals named in the filing: Architect: AJIT KULKARNI; Engineer: LP CONSTRUCTION; Chartered Accountant: CA ARCHANA CHAUDHARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIDDHI APARTMENT WING A/ SIDDHI APARTMENT WI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.