Home / Browse projects / Nagpur, Maharashtra / RENUKA RENAISSANCE
RENUKA RENAISSANCE
By Shri Kedareshwar Builders and Developers
RG-MH-02011 · RERA P50500006452 · Last updated on MahaRERA portal: 2 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 77 months
- 7 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RENUKA RENAISSANCE is a Residential / Group Housing project by Shri Kedareshwar Builders and Developers in Nagpur, Maharashtra, registered with MahaRERA as P50500006452 on 14 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 77 months from the original filing. 54 of the 65 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameRENUKA RENAISSANCE
- TypeResidential / Group Housing
- Location
- MAHARAJBAGH ROAD
- RAMDASPETH
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440010
- Pincode440010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500006452
- ReraGenie IDRG-MH-02011
Builder
- NameShri Kedareshwar Builders and Developers
- Entity typePartnership
- PartnersMADHAV WAMAN DESHPANDE, SANGHPAL NARESH CHAWHAN
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 20 Jan 2020)
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 2 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RENUKA RENAISSANCE | NA | 29 | 23 | 65 | 0 | 65 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.
RENUKA RENAISSANCE: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 92% |
| Electrical meter room, sub-station, receiving station | Yes | 92% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Arun Bambawale | Nagpur (M Corp.) | Nagpur |
| Bharti Bambawale | Nagpur (M Corp.) | Nagpur |
| Shripad Bambawale | Nagpur (M Corp.) | Nagpur |
| Anant Bambawale | Nagpur (M Corp.) | Nagpur |
| Alka Naik | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RENUKA RENAISSANCE | NA | Rs 96.62 cr | Rs 95.65 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANDEEP PANDIT |
| Engineer | VIKESH MESHRAM |
| Chartered Accountant | MTS & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Shri Kedareshwar Builders and Developers | - |
Extensions applied for7
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur plot comes under the Transit Oriented Development (TOD) Corridor of the Nagpur Metro Rail Corporation Limited. We started construction activity on our plot in Mid 2015 with a provisional sanction according to the existing bylaws. The first draft notification regarding increased FSI in the TOD corridor came on 03-10-2015 and had major deficits regarding the consumption of the permissible FSI. Hence the notification went for objections and suggestions and after almost 2 years the final GR came on 09-06-2017. We tried to sanction our building according to the same but it was challenged again
Reason as filed by the promoterPlease refer uploaded document.
Reason as filed by the promoterAfter taking so many setbacks namely the considerable delay in implementing the GRs and then due to COVID 19 pandemic and subsequent restrictions, we had faced number of obstacles to complete the project. We have submitted the reasons in details in the annexed annexure.
Reason as filed by the promoter1. Delayed Govt Regulation for TOD Metro Corridor 2. Demonetisation and GST implementation slowed the pace of business temporarily 3. COVID gave a heavy setback of 2 years for the project 4. The contractor had to be changed twice as it is one of the first high-rise buildings in Nagpur. Due to all these challenges, we request that you consider the extension request. More than 50% of flat owners have given their consent.
Reason as filed by the promoterDue to unforeseen circumstances beyond our control, the completion certificate for the aforementioned project has been delayed from the concerned department. This delay has arisen due to pending approvals and administrative procedures.
Reason as filed by the promoterDue to unforeseen circumstances beyond our control, the completion certificate for the aforementioned project was delayed from the concerned department. This delay has arisen due to pending approvals and administrative procedures.
Reason as filed by the promoterDue to unforeseen circumstances beyond our control, the completion certificate for the aforementioned project was delayed from the concerned department. This delay has arisen due to pending approvals and administrative procedures. For the extension, We have given consent of more than 75 %, We have also complied with all QPR and APR as required till Dec 25. Pert Chart and Schedule has also been attached. We have also attached an affidavit stating that any correction will be done within 7 days from the date of extension granted.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601075 | JITENDRA BHOGILAL KOTHARI | Shri Kedareshwar Builders and Developers | 27/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate March 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate March 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate March 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate March 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate March 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate March 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Architect certificate June 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Architech Certificate Sept 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Dec 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Engineer certificate June 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Sept 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate June 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Sept 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Dec 25.pdf | 19 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf | 19 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 24 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate.pdf | 24 Sep 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE.pdf | 24 Sep 2025 |
| Form 1File: Final Architect Certificate.pdf | 20 Jul 2025 |
| Form 2File: Engineer certificate.pdf | 20 Jul 2025 |
| Form 3File: CA CERTIFICATE.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Final sold book Inventory.pdf | 20 Jul 2025 |
| Form 1File: ARCHITECT CERTIFICATE.pdf | 20 Jul 2025 |
| Form 2File: Engineer certificate.pdf | 20 Jul 2025 |
| Form 3File: CA CERTIFICATE.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold book Inventory.pdf | 20 Jul 2025 |
| Certificates of CA (Form 3)File: CA CERTIFICATE DEC24.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: CA CERTIFICATE MAR25.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate renuka dec24 final.pdf | 19 May 2025 |
| Disclosure of sold/ booked inventoryFile: Dec 24 sold book.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: mar25 Sold book.pdf | 7 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate dec24.pdf | 4 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate mar25.pdf | 4 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT RENUKA DEC24.pdf | 3 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT RENUKA MAR25.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOK RENUKA DEC24.pdf | 3 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Dec 24.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: 3_1 Form 3 - Renuka Renassiance - March 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_2 Form 3 - Renuka Renassiance - June 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_3 Form 3 - Renuka Renassiance - Sept 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_4 Form 3 - Renuka Renassiance - Dec 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_5 Form 3 - Renuka Renassiance - March 2024.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_6 Form 3 - Renuka Renassiance - June 2024.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_7 Form 3 - Renuka Renassiance - Sept 2024.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_1 Form 3 - Renuka Renassiance - March 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_7 Form 3 - Renuka Renassiance - Sept 2024.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_6 Form 3 - Renuka Renassiance - June 2024.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_5 Form 3 - Renuka Renassiance - March 2024.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_4 Form 3 - Renuka Renassiance - Dec 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_3 Form 3 - Renuka Renassiance - Sept 2023.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 3_2 Form 3 - Renuka Renassiance - June 2023.pdf | 16 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2 Form 5 - Renuka Renassiance - FY 22-23.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2 Form 5 - Renuka Renassiance - FY 23-24.pdf | 12 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Renuka Renassiance - FY 22-23.pdf | 11 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Renuka Renassiance - FY 23-24.pdf | 11 Nov 2024 |
| Declaration in FORM BFile: Form B - Renuka Renassiance.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 5 Revised Sold Booked - Renuka - Sep 24.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Renuka Renassiance - Mar 23.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Renuka Renassiance - June 23.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Renuka Renassiance - Sep 23.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Renuka Renassiance - Dec 23.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Renuka Renassiance - Mar 24.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Booked Inv - Renuka Renassiance - June 24.pdf | 30 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Mar 23.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - June 23.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Sep 23.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Dec 23.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Mar 24.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - June 24.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Sep 24.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Renuka Renassiance - Sep 24.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - Mar 23.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - Sep 24.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - June 24.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - Mar 24.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - Dec 23.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - Sep 23.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Renuka Renassiance - June 23.pdf | 29 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RENUKA RENAISSANCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAMDASPETH2,800+ in Nagpur
Filed coordinates, straight-line distance. 167 registered projects within 2 km.
AADHAR NAGRI - II
S R INFRA
Metrocity-3
Metrocity Projects
KUKREJA WEST19
TAGSURE HOSPITALITY LLP
IMPERIAL GARDEN
Gaurav Agrawal
SHREERAM SKYLINE
CONCRETE DEVELOPERS
THE RHYTHM
RADHESANDESH REALTORS LLP
See every Nagpur project, with the district possession charts
Builder: Shri Kedareshwar Builders and Developers
Shri Kedareshwar Builders and Developers has 1 registration on MahaRERA, including RENUKA RENAISSANCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that RENUKA RENAISSANCE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RENUKA RENAISSANCE is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RENUKA RENAISSANCE?
The registered promoter entity is Shri Kedareshwar Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RENUKA RENAISSANCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against RENUKA RENAISSANCE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for RENUKA RENAISSANCE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RENUKA RENAISSANCE?
The professionals named in the filing: Architect: SANDEEP PANDIT; Engineer: VIKESH MESHRAM; Chartered Accountant: MTS & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RENUKA RENAISSANCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback