ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / RELIABLE PARK

Registration lapsed No litigation declared Residential / Group Housing project

RELIABLE PARK

By RELIABLE PROPERTIES

RG-MH-97326 · RERA P52700049991 · Last updated on MahaRERA portal: 21 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
43 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

RELIABLE PARK is a Residential / Group Housing project by RELIABLE PROPERTIES in Satara, Maharashtra, registered with MahaRERA as P52700049991 on 6 Mar 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 37 of the 80 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameRELIABLE PARK
  • TypeResidential / Group Housing
  • Location
    • SULTANWADI KOREGAON ROAD
    • SUBHASHNAGAR
    • Koregaon (CT)
    • Koregaon
    • Satara
    • 415501
  • Pincode415501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700049991
  • ReraGenie IDRG-MH-97326

Builder

  • NameRELIABLE PROPERTIES
  • Entity typePartnership
  • PartnersAMIT SHRIKANT PHADAKE, AMOL SIDDHANATH JADHAV, AVADHUT SHANKAR JADHAV, NITIN VILASRAO BARGE, KUSHAL DATTATRAY DHUMAL, ABHAYSINH VILASRAO BHOSALE, PRASANNA SHASHIKANT GOSAVI
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredMar 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed88 files

Current status

46%37 of 80 units booked
94.5%Work done, per cost certificate

Figures as on 21 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA6663063
BNA8501717

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DNYANDEV SHANKAR BARGEKoregaon (CT)Satara
VITTHAL SHANKAR BARGEKoregaon (CT)Satara

Approvals and building plan

Sanctioning authorityKoregaon Nagarpanchayat, Koregaon
Permissible FSI4397.31
Proposed, not sanctioned4,397 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAPAD BAZAR PETH KOREGAON
Estimated costRs 8.40 cr
Cost incurredRs 7.94 cr
Work done94.47%
BuildingWingEstimatedIncurred
ANARs 5.67 crRs 5.36 cr
BNARs 2.43 crRs 2.30 cr
-NARs 30.00 lakhRs 28.34 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAGAR RAMCHANDRA PAWAR
EngineerKISHOR GAVALI AND ASSOCIATES
EngineerNITIN SUBHASHRAO JADHAV
Chartered AccountantJIVAN JAGTAP AND COMPANY
PartnerRole in project
RELIABLE PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_0001.pdf21 Nov 2025
Withdrawal Update Form 2File: FORM 2_0001.pdf21 Nov 2025
Withdrawal Update Form 3File: FORM 3_0001.pdf21 Nov 2025
Form 1File: FORM 1.pdf23 Aug 2025
Form 2File: FORM 2.pdf23 Aug 2025
Form 3File: FORM 3.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD UNSOLD INVENTORY.pdf23 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE PROPERTIES FORM 3 FINAL 30-06-2024 Final_11zon.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE PROPERTIES_FINAL Q1.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3) Form 1 Q4.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2) Form 2 Q4.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD BOOKED .pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1) Form 3 Q4.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RP Engg certificate form 2.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q 2_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RP Engg cer from 2.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REALIALE PROPERTIES_FORM 3 TILL 31-03-2023_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1_0001.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2_0001_0001.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE PROPERTIES FORM 3 TILL 31-12-2023 SIGNED.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1_0001.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certifcte Q2_0001.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1_0001.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q 2_0001.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1_0001.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2_0001.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2_0001_0001.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RP architech.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RP Engg cer from 2.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE PROPERTIES FORM 3 TILL 31-12-2023 SIGNED.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REALABLE PROPERTIES_0001_11zon.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RELIABLE PROPERTIES FORM 5_0001.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RP Engg certificate form 2.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RP arch cer.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RP engg cr.pdf28 Dec 2023
Disclosure of sold/ booked inventoryFile: RP inventory.pdf28 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ENGINEER CERTIFICATE Q JUNE 23.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: BOOKED SOLD INVENTORY.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE COMPRESS.pdf22 Feb 2023
CERSAI detailsFile: CERSAI REPORT.pdf10 Feb 2023
Copy of the legal title reportFile: SEARCH REPORT COMPRESS.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE LEGAL.pdf19 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE LEGAL.pdf19 Jan 2023
Proforma of Agreement for saleFile: ATS.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS ABHAY BHOSALE.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS AMIT PHADAKE.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS AMOL JADHAV.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS AVADHUT JADHAV.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS KUSHAL DHUMAL.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS NITIN BARGE.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRERES IN OTHER PROJECTS PRASANNA GOSAVI.pdf16 Jan 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf12 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT BANK ACCOUNT.pdf12 Jan 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT.pdf12 Jan 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf12 Jan 2023
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE TAHASILDAR.pdf24 Dec 2022
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE TAHASILDAR.pdf24 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf24 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: N A ORDER.pdf24 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf24 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf24 Dec 2022
Layout approvalFile: LAYOUT.pdf23 Dec 2022
Building plan approvalFile: SANCTION PLAN 1.pdf23 Dec 2022
Building plan approvalFile: SANCTION PLAN 2.pdf23 Dec 2022
Building plan approvalFile: SANCTION PLAN 3.pdf23 Dec 2022
PAN CardFile: PROPERTIES PAN CARD COMPRESS.pdf23 Dec 2022

How this compares with Satara

46%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep RELIABLE PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUBHASHNAGAR1,100+ in Satara

2 kmRELIABLE PARKOther 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: RELIABLE PROPERTIES

RELIABLE PROPERTIES has 2 registrations on MahaRERA, including RELIABLE PARK and LALBAG VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that RELIABLE PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RELIABLE PARK is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RELIABLE PARK?

The registered promoter entity is RELIABLE PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RELIABLE PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RELIABLE PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RELIABLE PARK?

The professionals named in the filing: Architect: SAGAR RAMCHANDRA PAWAR; Engineer: KISHOR GAVALI AND ASSOCIATES; Engineer: NITIN SUBHASHRAO JADHAV; Chartered Accountant: JIVAN JAGTAP AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RELIABLE PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RELIABLE PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RELIABLE PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.