Registration lapsed No litigation declared Residential / Group Housing project

REGENCY SARVAM PHASE 13

By REGENCY NIRMAN LTD

RG-MH-17841 · RERA P51700076860 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
76 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

REGENCY SARVAM PHASE 13 is a Residential / Group Housing project by REGENCY NIRMAN LTD in Thane, Maharashtra, registered with MahaRERA as P51700076860 on 3 Jul 2024. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 108 of the 184 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameREGENCY SARVAM PHASE 13
  • TypeResidential / Group Housing
  • Location
    • Manda
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700076860
  • ReraGenie IDRG-MH-17841

Builder

  • NameREGENCY NIRMAN LTD
  • Entity typeCompany
  • CINU41001MH2005PLC153966
  • GSTIN27AADCR5058B1ZK
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorMAHESH SATYANARAYAN KHAIRARI
  • Other registrations28 more →
  • Completed19 of 29
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

10 months past promisethis monthRegisteredJul 2024PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Jul 2024
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

59%108 of 184 units booked
100.0%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 39NA24231840184

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING NO 39: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Dec 2025
LandownerVillageDistrict
VIJAY C GUPTAMumbai CityMumbai City
PINKI V GUPTAMumbai CityMumbai City
PRASHANT V GUPTAMumbai CityMumbai City
C K GUPTA (HUF)Mumbai CityMumbai City

Approvals and building plan

Sanctioning authoritykalyan dombivali muncipal corporation
Permissible FSI13123.57
Proposed, not sanctioned13,124 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIKHROLI MUMBAI
Estimated costRs 30.00 cr
Cost incurredRs 30.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING NO 39NARs 30.00 crRs 30.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS
EngineerPANKAJ PASORIA
EngineerRAM TALREJA
Chartered AccountantNITIN KUKREJA
PartnerRole in project
REGENCY NIRMAN LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: QUALITY ASSURANCE CERTIFICATE 31325.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A Sarvam Phase 13 31326.pdf1 Jun 2026
Withdrawal Update Form 1File: 426 RERA 31326.pdf26 May 2026
Withdrawal Update Form 2File: Phase 13 Sarvam Form 2 31326.pdf26 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE 31326.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 Regency Sarvam Phase 13 Bldg 39.pdf24 Apr 2026
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE.pdf24 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE compressed.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 Q1 Sarvam Phase 13.pdf31 Dec 2025
Withdrawal Update Form 1File: Form 1 Q1 Sarvam Phase 13.pdf31 Dec 2025
Withdrawal Update Form 1File: Form 1 Q1 Sarvam Phase 13.pdf31 Dec 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE.pdf31 Dec 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE.pdf31 Dec 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE.pdf31 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE compressed.pdf31 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE compressed.pdf31 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE compressed.pdf31 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOUSRE OF SOLD UNSOLD BOOKS REGENCY SARVAM PHASE 13 Q-4.pdf19 Apr 2025
Other - TechnicalFile: Form 2A Sarvam Phase 13.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sarvam BN 39 Q2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD BOOK REGENCY SARVAM PHASE 13.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 Sarvam BN 39.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Phase 13 Q2.pdf9 Dec 2024
Copy of the legal title reportFile: Revised Title Report.pdf25 Jun 2024
Other - LegalFile: Revised Title Report.pdf25 Jun 2024
Other - LegalFile: Clearification for plot area revised.pdf25 Jun 2024
Other - LegalFile: Revenue Share Confirmation REGENCY SARVAM.pdf25 Jun 2024
Other - LegalFile: Layout - converted (1).pdf25 Jun 2024
Other - LegalFile: Doc No 5625 - Pg 1-10.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 11-18.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 19-27.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 28-36.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 37-46.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 47-53.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 54-60.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 61-66.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 67-75.pdf21 May 2024
Other - LegalFile: Doc No 5625 - Pg 76-85.pdf21 May 2024
Other - LegalFile: Doc 4164 - Pg 1-10.pdf21 May 2024
Other - LegalFile: Doc 4164 - Pg 11-20.pdf21 May 2024
Other - LegalFile: Doc 4164 - Pg 21-29.pdf21 May 2024
Other - LegalFile: 30-38.pdf21 May 2024
Other - LegalFile: 39-48.pdf21 May 2024
Other - LegalFile: 49-58.pdf21 May 2024
Other - LegalFile: 59-67.pdf21 May 2024
Other - LegalFile: 68-76.pdf21 May 2024
Other - LegalFile: 77-86.pdf21 May 2024
Other - LegalFile: 87-96.pdf21 May 2024
Other - LegalFile: 97-105.pdf21 May 2024
Other - LegalFile: 106-113.pdf21 May 2024
Other - LegalFile: 114-122.pdf21 May 2024
Other - LegalFile: 7 12 merged.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: SELF DECLARATION REGARDING ENCUMBRANCE 01-05-2024.pdf2 May 2024
Details of encumbrances concerned to LegalFile: SELF DECLARATION REGARDING ENCUMBRANCE 01-05-2024.pdf2 May 2024
Declaration about Commencement CertificateFile: FORMAT-D.pdf2 May 2024
CERSAI detailsFile: UNDERTAKING FOR REPORT FROM CERSAI 01-05-2024.pdf2 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT -A SEPARATE BANK ACCOUNT.pdf2 May 2024
Other - TechnicalFile: ANNEXURE A -DECLARATION-CUM-UNDERTAKING.pdf2 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 3_PLINTH CERTIFICATE Appendix F.pdf1 May 2024
Declaration in FORM BFile: 5_AFFIDAVIT CUM DECLARATION FORM B.pdf1 May 2024
Other - TechnicalFile: 3_PLINTH CERTIFICATE Appendix F.pdf1 May 2024
Layout approvalFile: Comp.pdf28 Mar 2024
Copy of Layout Approval (in case of layout)File: Comp.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE REGENCY SARVAM PHASE 13.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE compressed.pdf28 Mar 2024
Proforma of Allotment letterFile: Alotment RERA.pdf28 Mar 2024
Proforma of Agreement for saleFile: AFS Sarvam 39 new.pdf28 Mar 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION.pdf28 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT Signed_compressed.pdf28 Mar 2024
Building plan approvalFile: Building Plan 39.pdf29 Feb 2024
PAN CardFile: PAN CARD.PDF29 Feb 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf29 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf29 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 39.pdf29 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MANISHA A AGARWAL.PDF29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANIL JESSARAM BHATIA.PDF29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Mahesh S Khairari.PDF29 Feb 2024

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise9 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Sarvam Phase 7Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017Late, Jul 2017
Regency Sarvam Phase 6Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017May 2017
Regency Sarvam Phase 5Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605134-CompletedDec 2016Late, Feb 2017
Regency Sarvam Phase 4Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605234-CompletedApr 2016Late, Jun 2016
Regency ClassicSurvey NO 54 Hissa no 4 Mumbai Bangalore Highway Near Mahindra Showroom Baner Pune-411045132-CompletedOct 2015Late, Mar 2016
Regency Sarvam Phase 3Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605552-CompletedMar 2015Late, Dec 2015
Regency Sarvam Phase 2Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605424-CompletedMar 2015Late, Aug 2015
Regency HeightsNr Brahmand Phase-1 AzadNagar Kolshet Road Thane W - 400607320-CompletedMar 2015Late, Mar 2015
Regency CrestRegency Crest Plot no 40 Sector 19 Kharghar Navi Mumbai - 410 210142-CompletedJun 2014Late, Dec 2014
Regency WillowsPlot no 61 Green Valley Behind Fariyas Hotel Tungari Lonavala24-CompletedFeb 2014Feb 2014
Regency Sarvam Phase 1Gupta Estates Near Titwala Railway Station Ganpati Mandir Road Titwala E - 421605.350-CompletedOct 2013Late, Mar 2014

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REGENCY SARVAM PHASE 13 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Titwala7,600+ in Thane

Builder: REGENCY NIRMAN LTD

REGENCY NIRMAN LTD has 29 registrations on MahaRERA, including Regency Antilia Phase - I and Regency Antilia Phase - II. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 11 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that REGENCY SARVAM PHASE 13 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if REGENCY SARVAM PHASE 13 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REGENCY SARVAM PHASE 13?

The registered promoter entity is REGENCY NIRMAN LTD, a company as per the filing. Its CIN U41001MH2005PLC153966 and GSTIN 27AADCR5058B1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REGENCY SARVAM PHASE 13?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REGENCY SARVAM PHASE 13?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REGENCY SARVAM PHASE 13?

The professionals named in the filing: Architect: VITAN CONSULTANTS; Engineer: PANKAJ PASORIA; Engineer: RAM TALREJA; Chartered Accountant: NITIN KUKREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REGENCY SARVAM PHASE 13?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REGENCY SARVAM PHASE 13. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REGENCY SARVAM PHASE 13 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.