ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Regency Antilia Phase VII

Completed No litigation declared Residential / Group Housing project

Regency Antilia Phase VII

By REGENCY NIRMAN LTD

RG-MH-46242 · RERA P51700032863 · Last updated on MahaRERA portal: 30 Jun 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Regency Antilia Phase VII is a Residential / Group Housing project by REGENCY NIRMAN LTD in Thane, Maharashtra, registered with MahaRERA as P51700032863 on 2 Feb 2022. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameRegency Antilia Phase VII
  • TypeResidential / Group Housing
  • Location
    • Near Century Rayon
    • Mharal
    • Ulhasnagar (M Corp.)
    • Ulhasnagar
    • Thane
    • 421001
  • Pincode421001
  • RERA no.P51700032863
  • ReraGenie IDRG-MH-46242

Builder

  • NameREGENCY NIRMAN LTD
  • Entity typeCompany
  • CINU41001MH2005PLC153966
  • GSTIN27AADCR5058B1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorMAHESH SATYANARAYAN KHAIRARI
  • Other registrations28 more →
  • Completed19 of 29
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredFeb 2022First promiseMar 2025Revised toSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Feb 2022
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D4NA340000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

D4: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes55%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,225 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityULHASNAGAR MUNICIPAL CORPORATION
Permissible FSI35651.23
Proposed, not sanctioned35,651 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULHASNAGAR

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
REGENCY NIRMAN LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019806Mar 2025 → Sep 2025

Reason as filed by the promoterThe project is under construction & we are putting our full efforts to complete it at the earliest. The said project was initially planned for construction of total built up area of 30,924.69 sq mtrs, however the same was modified for construction of total built up area of 35,651.23 sq. mtrs. These changes were already revised with MahaRERA authorities in the month of February 2023 with the consent of allottees. Though while revising the above said changes for the project under RERA, we were sure to complete the project on time i.e. on our proposed date, but due to the reasons explained above

Litigation declared6

CaseCourtStatus
27/2010/2010CIVIL COURT ULHASNAGARCase Disposed
55/2010/2010CIVIL COURT ULHASNAGARPENDING FOR HEARING
376/2010/2010CIVIL COURT OF KALYANDismissed by Court
371/2019Bombay High CourtPre Admission
2387/2019Bombay High CourtPre Admission
2388/2019Bombay High CourtPre Admission

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jun 2025

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: REGENCY D4 OC.pdf30 Jun 2025
Other - TechnicalFile: FORM 4.pdf30 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: 9th Revised CC.PDF24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Signed_.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold antilia tower d4.pdf19 Apr 2025
Other - TechnicalFile: REGENCY ANTILIA Phase 7 (D4).pdf19 Apr 2025
Declaration in FORM BFile: FORM -B.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Final Sold Unsold.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Phase VII.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: REGENCY ANTILIA PHASE VII.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30092024 final.pdf7 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Architects certificate Phase VII.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_for upload.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Engineer's Certificate) 1.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Chirag Khairari.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ramkishore Khairari.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Mahesh Khairari for upload.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Vicky Rupchandani.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Udhav Rupchandani.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Subhash Sir.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rakesh Kalwani.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Niraj Sharma.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Manoj Lalpuria.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Manisha Agarwal.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anil Bhatija.pdf15 Oct 2024
Layout approvalFile: 9th Revised Layout Plan.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: 9th Revised Layout Plan.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for Upload - converted.pdf8 Jun 2024
Declaration in FORM BFile: Form B Affidavit declaration.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Other - Technical.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Signed.PDF27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate - converted.pdf27 May 2024
Other - TechnicalFile: Form 2A Signed.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Signed - converted.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Signed.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 06-09-2023 for Upload.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Antilia Phase 7.pdf10 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Certificate Antilla Phase VII_compressed.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Signed.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Letter Signed.PDF23 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Signed.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.PDF3 May 2023
Other - TechnicalFile: Differential fees receipt.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: antilia phase vii.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Antilia Phase VII.pdf14 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PHASE VII NEW.PDF22 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: 27-01-22 Antilia CC.pdf27 Jan 2022
Details of encumbrancesFile: No Encumbrance Certificate.pdf21 Jan 2022
Declaration about Commencement CertificateFile: antilia phase Vii form D.pdf21 Jan 2022
Declaration in FORM BFile: Affidavit Antilia Phase VII.PDF21 Jan 2022
CERSAI detailsFile: CERSAI Report.pdf21 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Antilia Phase VII CA Certificate COMPRESSED.pdf21 Jan 2022
Proforma of Allotment letterFile: Declaration of agreement of sale D4.pdf21 Jan 2022
Layout approvalFile: Compressed Layout.pdf15 Jan 2022
Building plan approvalFile: Floor Plan.pdf15 Jan 2022
PAN CardFile: 1 PAN Card.pdf15 Jan 2022
Copy of the legal title reportFile: Revised Title Antilia.pdf15 Jan 2022
Copy of Layout Approval (in case of layout)File: Compressed Layout.pdf15 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan.pdf15 Jan 2022
Proforma of Allotment letterFile: Allottment Letter.pdf15 Jan 2022

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise9 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Sarvam Phase 7Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017Late, Jul 2017
Regency Sarvam Phase 6Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017May 2017
Regency Sarvam Phase 5Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605134-CompletedDec 2016Late, Feb 2017
Regency Sarvam Phase 4Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605234-CompletedApr 2016Late, Jun 2016
Regency ClassicSurvey NO 54 Hissa no 4 Mumbai Bangalore Highway Near Mahindra Showroom Baner Pune-411045132-CompletedOct 2015Late, Mar 2016
Regency Sarvam Phase 3Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605552-CompletedMar 2015Late, Dec 2015
Regency Sarvam Phase 2Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605424-CompletedMar 2015Late, Aug 2015
Regency HeightsNr Brahmand Phase-1 AzadNagar Kolshet Road Thane W - 400607320-CompletedMar 2015Late, Mar 2015
Regency CrestRegency Crest Plot no 40 Sector 19 Kharghar Navi Mumbai - 410 210142-CompletedJun 2014Late, Dec 2014
Regency WillowsPlot no 61 Green Valley Behind Fariyas Hotel Tungari Lonavala24-CompletedFeb 2014Feb 2014
Regency Sarvam Phase 1Gupta Estates Near Titwala Railway Station Ganpati Mandir Road Titwala E - 421605.350-CompletedOct 2013Late, Mar 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Regency Antilia Phase VII on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mharal7,600+ in Thane

Builder: REGENCY NIRMAN LTD

REGENCY NIRMAN LTD has 29 registrations on MahaRERA, including Regency Antilia Phase - I and Regency Antilia Phase - II. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 11 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Regency Antilia Phase VII is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Regency Antilia Phase VII?

The registered promoter entity is REGENCY NIRMAN LTD, a company as per the filing. Its CIN U41001MH2005PLC153966 and GSTIN 27AADCR5058B1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Regency Antilia Phase VII?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Regency Antilia Phase VII?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Regency Antilia Phase VII?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Regency Antilia Phase VII. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Regency Antilia Phase VII to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.