Home / Browse projects / Thane, Maharashtra / Regency Antilia Phase V Avana

Completed No litigation declared Residential / Group Housing project

Regency Antilia Phase V Avana

By REGENCY NIRMAN LTD

RG-MH-28711 · RERA P51700026760 · Last updated on MahaRERA portal: 6 Mar 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

Regency Antilia Phase V Avana is a Residential / Group Housing project by REGENCY NIRMAN LTD in Thane, Maharashtra, registered with MahaRERA as P51700026760 on 22 Oct 2020. The registration is recorded completed; possession was promised by 30 Oct 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRegency Antilia Phase V Avana
  • TypeResidential / Group Housing
  • Location
    • Village Mharal
    • Ulhasnagar
    • Ulhasnagar (M Corp.)
    • Thane
    • 421001
  • Pincode421001
  • RERA no.P51700026760
  • ReraGenie IDRG-MH-28711

Builder

  • NameREGENCY NIRMAN LTD
  • Entity typeCompany
  • CINU41001MH2005PLC153966
  • GSTIN27AADCR5058B1ZK
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorMAHESH SATYANARAYAN KHAIRARI
  • Other registrations28 more →
  • Completed19 of 29
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredOct 2020PromisedOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Oct 2020
  • Promised completion30 Oct 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building Type C3 - Wing ANA290000
Building Type C3 - Wing BNA290000
Building Type C3 - Wing CNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building Type C3 - Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building Type C3 - Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building Type C3 - Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,101 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI32546.0
Proposed, not sanctioned32,546 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME, VIKHROLI WEST, PRABHAT BHAVAN, 1ST FLOOR, LBS MARG

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS
EngineerReza Kabul Architects Pvt Ltd
EngineerJW CONSULTANTS LLP
EngineerRAM TALREJA
Chartered AccountantNITIN GOBINDRAM KUKREJA
Chartered AccountantVRP & ASSOCIATES
PartnerRole in project
REGENCY NIRMAN LTD-

Litigation declared6

CaseCourtStatus
27/2010ULHASNAGAR CIVIL COURT JUNIOR DIVISIONCase Disposed
55/2010ULHASNAGAR CIVIL COURT JUNIOR DIVISIONEvidence Stage
376/2010KALYAN CIVIL COURT SENIOR DIVISIONDismissed by Court
371/2019BOMBAY HIGH COURTPRE ADMISSION
2387/2019BOMBAY HIGH COURTPRE ADMISSION
2388/2019BOMBAY HIGH COURTPRE ADMISSION

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12502181REGENCY NIRMAN LTDNeelam Anil Nauner01/07/2025
CC12503030REGENCY NIRMAN LTDNeelam Anil Nauner28/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jun 2023

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOC REGN CERTIFICIATE OF ANGELICA BLOSSOM AND CALAMUS CHS LTD.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: REGENCY AVANA PHASE V.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Phase V - converted (1).pdf20 Apr 2024
Other - TechnicalFile: QUALITY ASSURANCE CERTIFICATE REGENCY ANTILIA PHASE V AVANA.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory - Phase V.pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Antilia Phase 5 Avana.pdf10 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Certificate Avana Phase V_compressed.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Regency Avana Phase V - Disclosure of Sold Unsold Inventory.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Certificate Phase V dt 100423.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: Regency Avana Sold Unsold details as on 30062023 (Phase V).pdf5 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Avana Bldg type C3 Wing ABC.pdf29 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: COMPLETION CERTIFICATE.pdf29 Jun 2023
Disclosure of sold/ booked inventoryFile: REGENCY ANTILIA PHASE V AVANA (1).pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avana Phase V Form 1 310323.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase V Form 3.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Avana Phase V.PDF30 Jan 2023
Disclosure of sold/ booked inventoryFile: REGENCY AVANA PHASE V_compressed.pdf28 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Avana Phase V.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021 Avana Phase -V Sign.pdf1 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: REGENCY AVANA - QUALITY CERTIFICATE_compressed.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: Wing A Final.pdf16 Nov 2021
Disclosure of sold/ booked inventoryFile: Wing B Final.pdf16 Nov 2021
Disclosure of sold/ booked inventoryFile: Wing C Final.pdf16 Nov 2021
Proforma of Allotment letterFile: Draft Agreement Avana 290421.pdf29 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: REGENCY AVANA - QUALITY CERTIFICATE_compressed.pdf14 Apr 2021
Layout approvalFile: Layout Compressed.pdf19 Oct 2020
Building plan approvalFile: Bldg type C3,C5, wing A and C.pdf19 Oct 2020
Building plan approvalFile: Bldg type C3 wing B.pdf19 Oct 2020
PAN CardFile: RNL PAN CARD.pdf19 Oct 2020
Copy of the legal title reportFile: Revised Title Certificate 12032020.pdf19 Oct 2020
Details of encumbrancesFile: No Encumbance.pdf19 Oct 2020
Copy of Layout Approval (in case of layout)File: Layout Compressed.pdf19 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Bldg type C3,C5, wing A and C.pdf19 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Bldg type C3 wing B.pdf19 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC COMPRESSED.pdf19 Oct 2020
Declaration in FORM BFile: Affidavit Final 191020.pdf19 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase V.pdf19 Oct 2020
Proforma of Allotment letterFile: allotment letter final 191020.pdf19 Oct 2020
Proforma of Allotment letterFile: Final AFSRA 5th phase 19102020 final.pdf19 Oct 2020

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise9 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Sarvam Phase 7Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017Late, Jul 2017
Regency Sarvam Phase 6Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017May 2017
Regency Sarvam Phase 5Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605134-CompletedDec 2016Late, Feb 2017
Regency Sarvam Phase 4Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605234-CompletedApr 2016Late, Jun 2016
Regency ClassicSurvey NO 54 Hissa no 4 Mumbai Bangalore Highway Near Mahindra Showroom Baner Pune-411045132-CompletedOct 2015Late, Mar 2016
Regency Sarvam Phase 3Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605552-CompletedMar 2015Late, Dec 2015
Regency Sarvam Phase 2Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605424-CompletedMar 2015Late, Aug 2015
Regency HeightsNr Brahmand Phase-1 AzadNagar Kolshet Road Thane W - 400607320-CompletedMar 2015Late, Mar 2015
Regency CrestRegency Crest Plot no 40 Sector 19 Kharghar Navi Mumbai - 410 210142-CompletedJun 2014Late, Dec 2014
Regency WillowsPlot no 61 Green Valley Behind Fariyas Hotel Tungari Lonavala24-CompletedFeb 2014Feb 2014
Regency Sarvam Phase 1Gupta Estates Near Titwala Railway Station Ganpati Mandir Road Titwala E - 421605.350-CompletedOct 2013Late, Mar 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Regency Antilia Phase V Avana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulhasnagar7,600+ in Thane

Builder: REGENCY NIRMAN LTD

REGENCY NIRMAN LTD has 29 registrations on MahaRERA, including Regency Antilia Phase - I and Regency Antilia Phase - II. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 11 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Regency Antilia Phase V Avana is delayed beyond 30 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Regency Antilia Phase V Avana?

The registered promoter entity is REGENCY NIRMAN LTD, a company as per the filing. Its CIN U41001MH2005PLC153966 and GSTIN 27AADCR5058B1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Regency Antilia Phase V Avana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Regency Antilia Phase V Avana?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Regency Antilia Phase V Avana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Regency Antilia Phase V Avana?

The professionals named in the filing: Architect: VITAN CONSULTANTS; Engineer: Reza Kabul Architects Pvt Ltd; Engineer: JW CONSULTANTS LLP; Engineer: RAM TALREJA; Chartered Accountant: NITIN GOBINDRAM KUKREJA; Chartered Accountant: VRP & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Regency Antilia Phase V Avana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Regency Antilia Phase V Avana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Regency Antilia Phase V Avana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.