Home / Browse projects / Thane, Maharashtra / REGAL SQUARE PHASE II BUILDING NO 4 AND 5

Completed No litigation declared Residential / Group Housing project

REGAL SQUARE PHASE II BUILDING NO 4 AND 5

By SQUAREFEET INFRASTRUCTURE LLP

RG-MH-10249 · RERA P51700008143 · Last updated on MahaRERA portal: 16 Apr 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

REGAL SQUARE PHASE II BUILDING NO 4 AND 5 is a Residential / Group Housing project by SQUAREFEET INFRASTRUCTURE LLP in Thane, Maharashtra, registered with MahaRERA as P51700008143 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 1 complaint is on record with the regulator.

At a glance

Project

  • NameREGAL SQUARE PHASE II BUILDING NO 4 AND 5
  • TypeResidential / Group Housing
  • Location
    • Sonale Bhadwad Road
    • Bhadwad Temghar Pada
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421308
  • Pincode421308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008143
  • ReraGenie IDRG-MH-10249

Builder

  • NameSQUAREFEET INFRASTRUCTURE LLP
  • Entity typePartnership
  • PartnersMANISH SAJJANRAJ JAIN, NAVIN PANCHALAL SAVLA, DEEPAK PARASMAL JAIN, MANSUKH VELJI SHAH, RAMESH VELJI SHAH, VIVEK MAHESHCHANDRA MANGLA, RAJNI KANYALAL DHIRMALANI, RAJEEV MANILAL SAVLA, KAMLESH BHAGWANDAS BATHIJA, SACHIN CHANDRU MIRANI
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
4NA130000
5NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area482 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4160.64
Proposed, not sanctioned4,161 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTAK MAHINDRA BANK, NAUPADA ROAD, THANE WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRADDHA A PARANJPE
EngineerAJAY MAHALE & ASSOCIATES
Chartered AccountantNEHA AMIT BIYANI
PartnerRole in project
SQUAREFEET INFRASTRUCTURE LLP-

Litigation declared1

CaseCourtStatus
836/2014IN THE HIGH COURT OF JUDICATURE AT BOMBAYPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000195276Arunodaya Dwivedi and Ashutosh DwivediM/s Squarefeet Infrastructure LLP17/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Aug 2022

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 REGAL SQ PH 2 2024.pdf16 Apr 2024
Layout approvalFile: REGAL SQUARE PHASE TWO PLAN.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: REGAL SQUARE PHASE TWO PLAN.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLDG 6.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 bldg 7.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1.pdf23 Jun 2023
Disclosure of sold/ booked inventoryFile: sold unsold sheet regal phase two.pdf23 Jun 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUM REGAL.pdf31 May 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUM REGAL.pdf31 May 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf31 May 2023
Commencement Certificates / NA Order for plotted developmentFile: N A ORDER Compressed.pdf31 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NINETY FIVE.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: final annexure a.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: annexure a final.pdf31 May 2023
CERSAI detailsFile: CERSAI 1.pdf31 May 2023
CERSAI detailsFile: CERSAI 2.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: CERSAI_SQUAREFEET INFRA LLP.pdf31 May 2023
Proforma of Agreement for saleFile: AGREEMENT PHASE TWO.pdf29 May 2023
Status of ConveyanceFile: CONVEYANCE STATUS.pdf25 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: phase 2 OC.pdf13 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: PHASE II CA CERTIFICATE FORM NO 5 RERA.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: PHASE II CA CERTIFICATE FORM NO 5 RERA.pdf13 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: PHASE 2 REG CERTIFICATE.pdf24 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL CERTIFICATE.pdf4 Jun 2019
OtherFile: oc of phase 2.pdf7 Mar 2019
Details of encumbrancesFile: Regal Encumbrance.pdf26 Feb 2019
OtherFile: FIRE NOC REGAL SQUARE PHASE 2.pdf12 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ARCHITEXT LETTER SEP 2018.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ARCHITEXCT LETTER.pdf6 Jun 2018
Certificates of CA (Form 3)File: CA CERTIFICATE SQUARE FEET INFRASTRUCTURE LLP.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf29 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R K CERTIFICATE.pdf27 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 AND 7.pdf2 Dec 2017
Proforma of Allotment letterFile: draft agreement.pdf26 Sep 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf2 Sep 2017
Details of encumbrancesFile: ENCUMBRANCES_REPORT.pdf30 Jul 2017
Declaration in FORM BFile: regal square affidavit cum declaration-ilovepdf-compressed.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate-ilovepdf-compressed.pdf30 Jul 2017
Certificates of CA (Form 3)File: ca certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: regal square declaration for afs.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf25 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf24 Jul 2017
Layout approvalFile: LAYOUT-2-5-ilovepdf-compressed.pdf12 Jul 2017
Building plan approvalFile: IOD-3-1.pdf12 Jul 2017
Building plan approvalFile: IOD-3-2.pdf12 Jul 2017
Building plan approvalFile: IOD-3-3.pdf12 Jul 2017
Building plan approvalFile: IOD-3-4.pdf12 Jul 2017
PAN CardFile: PAN CARD-ilovepdf-compressed.pdf12 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT-2-5-ilovepdf-compressed.pdf12 Jul 2017
Building Plan Approval (IOD)File: IOD-3-1.pdf12 Jul 2017
Building Plan Approval (IOD)File: IOD-3-2.pdf12 Jul 2017
Building Plan Approval (IOD)File: IOD-3-3.pdf12 Jul 2017
Building Plan Approval (IOD)File: IOD-3-4.pdf12 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC-1-1.pdf12 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC-1-2.pdf12 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REGAL SQUARE PHASE II BUILDING NO 4 AND 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhadwad Temghar Pada7,600+ in Thane

2 kmREGAL SQUARE PHASE II BUCompleted 14Lapsed / revoked 11Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: SQUAREFEET INFRASTRUCTURE LLP

SQUAREFEET INFRASTRUCTURE LLP has 2 registrations on MahaRERA, including REGAL SQUARE PHASE II BUILDING NO 4 AND 5 and REGAL SQUARE PHASE III BLDG NO 7. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if REGAL SQUARE PHASE II BUILDING NO 4 AND 5 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REGAL SQUARE PHASE II BUILDING NO 4 AND 5?

The registered promoter entity is SQUAREFEET INFRASTRUCTURE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REGAL SQUARE PHASE II BUILDING NO 4 AND 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against REGAL SQUARE PHASE II BUILDING NO 4 AND 5?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for REGAL SQUARE PHASE II BUILDING NO 4 AND 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REGAL SQUARE PHASE II BUILDING NO 4 AND 5?

The professionals named in the filing: Architect: SHRADDHA A PARANJPE; Engineer: AJAY MAHALE & ASSOCIATES; Chartered Accountant: NEHA AMIT BIYANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REGAL SQUARE PHASE II BUILDING NO 4 AND 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REGAL SQUARE PHASE II BUILDING NO 4 AND 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REGAL SQUARE PHASE II BUILDING NO 4 AND 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.