ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / PEHLA GHAR - SHIVA COMPLEX

Registration lapsed No litigation declared Others project

PEHLA GHAR - SHIVA COMPLEX

By LAABH BUILDERS and DEVELOPERS

RG-MH-11266 · RERA P51700005607 · Last updated on MahaRERA portal: 4 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
113 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

PEHLA GHAR - SHIVA COMPLEX is a Others project by LAABH BUILDERS and DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700005607 on 11 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 47 of the 160 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.

At a glance

Project

  • NamePEHLA GHAR - SHIVA COMPLEX
  • TypeOthers
  • Location
    • Bhiwandi
    • Bhiwandi (M Corp.)
    • Thane
    • 421308
  • Pincode421308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005607
  • ReraGenie IDRG-MH-11266

Builder

  • NameLAABH BUILDERS and DEVELOPERS
  • Entity typePartnership
  • PartnerKALPESH JAYANTILAL SANGHAVI

Key dates

10 months past promisethis monthRegisteredAug 2017PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed100 files

Current status

29%47 of 160 units booked
32.5%Work done, per cost certificate

Figures as on 4 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA9856056
WING BNA9842042
WING ANA9862062

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

WING C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes33%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes33%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes33%
Fire protection and fire safety requirementsYes33%
Electrical meter room, sub-station, receiving stationYes33%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered3
Open Space9
BuildingClosed/CoveredOpen SpaceTotal
WING C134
WING B134
WING A134

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,650 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jan 2026
LandownerVillageDistrict
KUNDALIK(PUNDALIK) NAIKBhiwandi (M Corp.)Thane
HIRABAI KUNDALIK NAIKBhiwandi (M Corp.)Thane
RAJESH PUNDALIK NAIKBhiwandi (M Corp.)Thane
LAXMAN SHIVA NAIKBhiwandi (M Corp.)Thane
SUMAN LAXMAN NAIKBhiwandi (M Corp.)Thane
GOPAL LAXMAN NAIKBhiwandi (M Corp.)Thane
GOVIND LAXMAN NAIKBhiwandi (M Corp.)Thane
SHARAD LAXMAN NAIKBhiwandi (M Corp.)Thane
BHARAT LAXMAN NAIKBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityLaabh Builders And Developers
Permissible FSI4330.0
Proposed, not sanctioned2,099 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchchandanwadi
Estimated costRs 15.41 cr
Cost incurredRs 5.01 cr
Work done32.53%
BuildingWingEstimatedIncurred
WING ANARs 5.12 cr-
WING CNARs 4.88 crRs 4.83 cr
WING BNARs 4.50 cr-
-NARs 90.66 lakhRs 18.69 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKRUTI CONSULTANTS
EngineerR Constructivo er. Taufique R. Shaikh
Chartered AccountantRLY & Associates
PartnerRole in project
LAABH BUILDERS and DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: LBD Architects June 2025.pdf4 Mar 2026
Withdrawal Update Form 1File: LBD RERA ARCHITECTS-DT-30-09-2025.pdf4 Mar 2026
Withdrawal Update Form 1File: LBD-ARCHITECT LETTAR- DT-31-12-2025.pdf4 Mar 2026
Withdrawal Update Form 2File: EC_LBD_JUNE_25.pdf4 Mar 2026
Withdrawal Update Form 2File: EC - LBD-FORM-2 -DT-30-09-2025.pdf4 Mar 2026
Withdrawal Update Form 2File: EC_LBD_DEC_25.pdf4 Mar 2026
Withdrawal Update Form 3File: LBD Form 3 June 2025.pdf4 Mar 2026
Withdrawal Update Form 3File: LBD Form 3 Sept 2025.pdf4 Mar 2026
Withdrawal Update Form 3File: LBD Form 3 Sept 2025.pdf4 Mar 2026
Withdrawal Update Form 1File: LBD Architects June 2025.pdf2 Feb 2026
Withdrawal Update Form 1File: LBD Architects June 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2023.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2023.pdf2 Feb 2026
Withdrawal Update Form 3File: LBD Form 3 Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 3File: LBD Form 3 Dec 2025.pdf2 Feb 2026
Form 1File: LBD Architects Dec 2024 - singh.pdf19 Jan 2026
Form 2File: LBD Engineer Certificate Dec 2024.pdf19 Jan 2026
Form 3File: Builders and Developers Form 3 31-12-24 - singh.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: LBD- SOLD and UNSOLD Dec 2024.pdf19 Jan 2026
Form 1File: LBD Architects Sept 2024 - singh.pdf19 Jan 2026
Form 2File: Engineer Certificate Sept 2024.pdf19 Jan 2026
Form 3File: Builders and Developers Form 3 30-09-24 -singh.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: LBD- SOLD and UNSOLD Sept 2024.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 March 2025 LBD.pdf19 Jan 2026
Form 3File: LBD_Form3_March 2025_compressed.pdf23 May 2025
Form 1File: LBD Architect marc 2025.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: LBD- SOLD and UNSOLD March 2025.pdf23 May 2025
Form 2File: LBD_Form2_March 2025.pdf23 May 2025
Certificates of CA (Form 3)File: LBD - Form 3 March 2025_compressed.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: LBD - SOLD and UNSOLD June 2024.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: LBD- SOLD and UNSOLD Sept 2024.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: LBD- SOLD and UNSOLD Dec 2024.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: LBD- SOLD and UNSOLD March 2025.pdf13 May 2025
Certificates of CA (Form 3)File: Builders and Developers Form 3 31-03-24 - singh.pdf8 May 2025
Certificates of CA (Form 3)File: Builders and Developers Form 3 30-06-24 - singh.pdf8 May 2025
Certificates of CA (Form 3)File: Builders and Developers Form 3 30-09-24 -singh.pdf8 May 2025
Certificates of CA (Form 3)File: Builders and Developers Form 3 31-12-24 - singh.pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_LBD_MARCH_25.pdf8 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LBD Architect marc 2025.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC_LBD_23-24 - sing.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LBD-FORM 5 DT-31-03-24 (1).pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LBD Architects march 2024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LBD Architects june 2024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LBD Architects Sept 2024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LBD Architects Dec 2024.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LBD Architects Dec 2024.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LBD Engineer certificate march 2024.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June 2024.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2024.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 2024.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 March 2023.pdf4 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LBD_FORM2A.pdf6 Feb 2024
Certificates of CA (Form 3)File: Form 3 June 2022.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Sept 2022.pdf20 Jan 2024
Certificates of CA (Form 5)File: Form 3 Dec 2022.pdf20 Jan 2024
Certificates of CA (Form 5)File: Form 3 March 2023.pdf20 Jan 2024
Certificates of CA (Form 5)File: Form 3 June 2023.pdf20 Jan 2024
Certificates of CA (Form 5)File: Form 3 Sept 2023.pdf20 Jan 2024
Certificates of CA (Form 5)File: Form 3 Dec 2023.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 2023.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2022.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2022.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2022.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2023.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2023.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2023.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate june 2022.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2022.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 2022.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate March 2023.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate june 2023.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2023.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate june 2023.pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Laabh Buildwell.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Laabh Builders And Developers.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: LBD From 5 March 2021.pdf27 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf6 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5.pdf4 Feb 2020
PAN CardFile: PG1 PAN card.pdf12 Jun 2019

How this compares with Thane

29%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PEHLA GHAR - SHIVA COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhiwandi7,600+ in Thane

2 kmPEHLA GHAR - SHIVA COMPLCompleted 14Lapsed / revoked 12Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: LAABH BUILDERS and DEVELOPERS

LAABH BUILDERS and DEVELOPERS has 1 registration on MahaRERA, including PEHLA GHAR - SHIVA COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that PEHLA GHAR - SHIVA COMPLEX shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PEHLA GHAR - SHIVA COMPLEX is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PEHLA GHAR - SHIVA COMPLEX?

The registered promoter entity is LAABH BUILDERS and DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PEHLA GHAR - SHIVA COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PEHLA GHAR - SHIVA COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PEHLA GHAR - SHIVA COMPLEX?

The professionals named in the filing: Architect: AAKRUTI CONSULTANTS; Engineer: R Constructivo er. Taufique R. Shaikh; Chartered Accountant: RLY & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PEHLA GHAR - SHIVA COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PEHLA GHAR - SHIVA COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PEHLA GHAR - SHIVA COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.