Reelicon Belleza

By Aditya Enterprises

RG-MH-23201 · RERA P52100078121 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of AU Small Finance Bank Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Basement (if any), 0%
36 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Reelicon Belleza is a Others project by Aditya Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100078121 on 25 Nov 2024. Possession is promised by 31 Dec 2027. 4 of the 40 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameReelicon Belleza
  • TypeOthers
  • Location
    • Elphinston Road
    • Bopodi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411003
  • Pincode411003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078121
  • ReraGenie IDRG-MH-23201

Builder

  • NameAditya Enterprises
  • Entity typeOthers
  • ProprietorAnil Malhar Salunkhe
  • Other registrations10 more →
  • Completed3 of 11
  • No longer live6 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

10%4 of 40 units booked
36.3%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Reelicon BellezaNA7733740

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Reelicon Belleza: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes32%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Open Space52

Land and ownership4

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area936 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Ltd
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
URMILA CHANDRASHEKHAR NAIKPune (M Corp.)Pune
RISHIKESH CHANDRASHEKHAR NAIKPune (M Corp.)Pune
UMESH CHANDRASHEKAR NAIKPune (M Corp.)Pune
PRATIBHA CHANDRASHEKHAR NAIKPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI4500.0
Proposed, not sanctioned1,334 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No. 102 103,Plot No. 96/2 and 97,CTS No.1132,1133,New Survey No.184,Anand Park, Aundh,Pune,Maharashtra-411007
Estimated costRs 9.97 cr
Cost incurredRs 3.61 cr
Work done36.26%
BuildingWingEstimatedIncurred
Reelicon BellezaNARs 9.80 crRs 3.61 cr
-NARs 16.87 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash Kulkarni
EngineerRahul Sonawane
Chartered AccountantDeepak Sasar
PartnerRole in project
Aditya Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Adity Ent Form I Q4.pdf24 Apr 2026
Withdrawal Update Form 1File: Adity Ent Form I Q4.pdf24 Apr 2026
Withdrawal Update Form 2File: Adity Ent Form II Q4.pdf24 Apr 2026
Withdrawal Update Form 2File: Adity Ent Form II Q4.pdf24 Apr 2026
Withdrawal Update Form 3File: Adity Ent Form III Q4.pdf24 Apr 2026
Withdrawal Update Form 3File: Adity Ent Form III Q4.pdf24 Apr 2026
Withdrawal Update Form 1File: Form I Adity Ent Q3.pdf18 Jan 2026
Withdrawal Update Form 2File: Form II Adity Ent Q3.pdf18 Jan 2026
Withdrawal Update Form 3File: Form III Adity Ent Q3.pdf18 Jan 2026
Withdrawal Update Form 1File: Aditya Ent Form I Q2.pdf14 Oct 2025
Withdrawal Update Form 2File: Aditya Ent Form II Q2.pdf14 Oct 2025
Withdrawal Update Form 3File: Aditya Ent Form III Q2.pdf14 Oct 2025
Layout approvalFile: Approved layout1.pdf1 Sep 2025
Building plan approvalFile: plan 02 (2).pdf1 Sep 2025
Building plan approvalFile: plan 03.pdf1 Sep 2025
Building plan approval or NA orderFile: commencement 02042025.pdf1 Sep 2025
Withdrawal Update Form 1File: Aditya Ent Form I Q 1.pdf1 Sep 2025
Withdrawal Update Form 2File: Aditya Ent Form II Q 1.pdf1 Sep 2025
Withdrawal Update Form 3File: Adity Ent RERA III Q 1 FY 2025-26.pdf1 Sep 2025
Layout approvalFile: Approved layout.pdf6 Aug 2025
Building plan approvalFile: plan 02.pdf6 Aug 2025
Building plan approvalFile: plan 03.pdf6 Aug 2025
Commencement certificateFile: commencement 02042025.pdf6 Aug 2025
Form 3File: Aditya Ent Form III Q 4 FY 2025.pdf19 Jul 2025
Form 1File: Aditya Enter Form I Q4.pdf19 Jul 2025
Form 2File: Aditya Enter Form II Q4.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of SOLD_UNSOLD Inventory.pdf19 Jul 2025
Proforma of Agreement for saleFile: Final AFS Reelicon Belleza 28042025.pdf28 Apr 2025
Details of encumbrances concerned to FinanceFile: rera encumbrances pdf.pdf28 Mar 2025
Details of encumbrances concerned to FinanceFile: BELLEZA MORTGAGE DEED AU BANK.pdf28 Mar 2025
Details of encumbrances concerned to LegalFile: rera encumbrances pdf.pdf28 Mar 2025
Details of encumbrances concerned to LegalFile: BELLEZA MORTGAGE DEED AU BANK.pdf28 Mar 2025
Other - FinanceFile: BELLEZA MORTGAGE DEED AU BANK.pdf28 Mar 2025
Proforma of Agreement for saleFile: Final_AFS_Reelicon_Belleza 28032025.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Aditya Enterprise Q3 FY 2024-25.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III Aditya Enterprise Q3 FY 2024-25.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II Aditya Enterprise Q3 FY 2024-25.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Aditya Enterprise Q3 FY 2024-25.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III Aditya Enterprise Q3 FY 2024-25.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II Aditya Enterprise Q3 FY 2024-25.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3- CA Certificate 181124.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3- CA Certificate 181124.pdf18 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS Final 15112024 3mb.pdf17 Nov 2024
Proforma of Agreement for saleFile: Final AFS_Reelicon_Belleza 15112024.pdf17 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS Final 15112024 3mb.pdf17 Nov 2024
Proforma of Agreement for saleFile: Final AFS_Reelicon_Belleza 15112024.pdf17 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B dt11112024.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: Discloser of sold unsold 4112024.pdf4 Nov 2024
Building plan approvalFile: Sanction Plans 20082024 merged 3mb.pdf29 Oct 2024
Copy of the legal title reportFile: Format A Legal Title Report Highlighted 3MB.pdf29 Oct 2024
Proforma of Allotment letterFile: Proforma Allotment letter.pdf29 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 20082024 merged 3mb.pdf29 Oct 2024
Other - LegalFile: Annexure A Declaration cum undertaking.pdf29 Oct 2024
Other - LegalFile: Chandrashekhar Naik Death Certificate and affidavit.pdf29 Oct 2024
Other - LegalFile: Prabhavati Naik Death Certificate and Affidavit.pdf29 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A 28102024.pdf29 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration Cum Undertaking Landowner.pdf29 Oct 2024
Other - TechnicalFile: Verification of CC SCREENSHOT.pdf29 Oct 2024
Details of encumbrances concerned to FinanceFile: SELF DECLARATION LEGAL AND LITIGATION ENCUMBRANCES.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: SELF DECLARATION REGARDING ENCUMBRANCES CONCERNED TO FINACE.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: SELF DECLARATION LEGAL AND LITIGATION ENCUMBRANCES.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: SELF DECLARATION REGARDING ENCUMBRANCES CONCERNED TO FINACE.pdf11 Oct 2024
Layout approvalFile: Second Sanction Plan 1.pdf10 Oct 2024
PAN CardFile: PAN.pdf10 Oct 2024
Copy of Layout Approval (in case of layout)File: Second Sanction Plan 1.pdf10 Oct 2024
Declaration in FORM BFile: FORM B AFFIDAVITE CUM DECLARATION.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 ARCHITECTS CERTIFICATE.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate 2.pdf10 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMET CERTIFICATE.pdf10 Oct 2024
CERSAI detailsFile: UNDERTAKING FOR CERSAIASST BASED REPORT .pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH TO ALLOTMENT LETTER .pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REP ANNEXURE A.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSER FOR SECURED AND UNSECURED FIANACE AVAILED FOR THE PRO.pdf10 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Reelicon KianSURVEY NO 62 AND OTHER AMBEGAON BUDRUK PUNE 41106160CompletedDec 2018Late, Dec 2019

How this compares with Pune

10%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Reelicon Belleza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bopodi13,700+ in Pune

2 kmReelicon BellezaCompleted 7Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: Aditya Enterprises

ADITYA ENTERPRISES has 11 registrations on MahaRERA, including PURNIMA PRIDE and VIDHYA DARSHAN. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Reelicon Belleza is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Reelicon Belleza?

The registered promoter entity is Aditya Enterprises, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Reelicon Belleza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Reelicon Belleza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Reelicon Belleza?

The professionals named in the filing: Architect: Prakash Kulkarni; Engineer: Rahul Sonawane; Chartered Accountant: Deepak Sasar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Reelicon Belleza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Reelicon Belleza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Reelicon Belleza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.