ESBEE SQUARE

By ESBEE SQUARE LLP

RG-MH-57739 · RERA P52100052795 · Last updated on MahaRERA portal: 22 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedmoved 4 months from the original
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
15 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

ESBEE SQUARE is a Commercial project by ESBEE SQUARE LLP in BOPODI, 411003, registered with MahaRERA as P52100052795 on 5 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 4 months from the original filing. 19 of the 34 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameESBEE SQUARE
  • TypeCommercial
  • Location
    • Survey No 25A
    • 2584-2592
    • BOPODI
    • 411003
  • Pincode411003
  • RERA no.P52100052795
  • ReraGenie IDRG-MH-57739

Builder

  • NameESBEE SQUARE LLP
  • Entity typePartnership
  • PartnersAnuj Rajesh Agarwal, Ansh Mukesh Agarwal

Key dates

this monthRegisteredOct 2023First promiseAug 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Aug 2026)
  • Buildings1 building record
  • Documents filed80 files

Current status

56%19 of 34 units booked
97.4%Work done, per cost certificate

Figures as on 22 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ESBEE SQUARENA2203434

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ESBEE SQUARE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area791 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
Mr. Mohan alias Mohanlal Hariram Agarwal (Goyal)-Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1647.81
Proposed, not sanctioned1,426 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 4.50 cr
Cost incurredRs 4.38 cr
Work done97.4%
BuildingWingEstimatedIncurred
ESBEE SQUARENARs 4.16 crRs 4.08 cr
-NARs 33.89 lakhRs 30.50 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
ArchitectAetrium design studio
EngineerMAYUR ANANDA AKHADE
EngineerVIJAY MEHER
Chartered AccountantPatel and Sharma
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantDipesh Purushottam Patel
Chartered AccountantDipali Shelar and Company
PartnerRole in project
ESBEE SQUARE LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100052795/WarAug 2026 → Dec 2026

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5_signed.pdf22 Sep 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR1-26-27_ESLLP.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2_Enggineer Certificate_QPR1-26-27_ESLLP.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR1-26-27_ESLLP.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR4_Square.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2_Engg Certificcate_QPR4_Square.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR4_Square.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR3_Square.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2_Engg Certificcate_QPR3_Square.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR3_Square.pdf22 Jun 2026
Withdrawal Update Form 1File: FORM 1_Architect Certificate_ESLLP_Square.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM 2_Engg Certificate_ESLLP_Square.pdf9 Jun 2026
Withdrawal Update Form 3File: FORM 3_CA Certificate_ESLLP_Square.pdf9 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A_Esbee Square.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM 1_Architect Certificate_ESLLP_Square.pdf7 Nov 2025
Withdrawal Update Form 2File: FORM 2_Engg Certificate_ESLLP_Square.pdf7 Nov 2025
Withdrawal Update Form 3File: FORM 3_CA Certificate_ESLLP_Square.pdf7 Nov 2025
Form 5 (FY 2024-2025)File: Sign-Form 5_Esbee Square LLP.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1-architect certificate_ESLLP.pdf2 Aug 2025
Withdrawal Update Form 2File: Form 2_Engg certificate_ES.pdf2 Aug 2025
Withdrawal Update Form 3File: Form 3_CA Certificate_ES.pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form1_Architect Certificate_ES.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_CA certificate_esbee square _organized.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_Eng certificate_Esbee square .pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: New sold unsold_Esbee square .pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Cetificate 2A_RERA_Esbee Square.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_esbee square .pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_ESLLP.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate_ESLLP.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_ESLLP.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventary_ESLLP.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Annual Report_ESLLP- Final.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Esbee Square.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate_Esbee Square.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engg Certificate_Esbee Square.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Esbee square.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary_Esbee Square.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Esbee Square.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload_compressed.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_Esbee Square.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary_Esbee Square.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate_Esbeee Square.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Cetificate_Esbee Square.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate_Esbee Square Final.pdf3 May 2024
Layout approvalFile: Sanctioned Plans_Revised dated 21-03-2024_1_compressed.pdf4 Apr 2024
Layout approvalFile: Sanctioned Plans_Revised dated 21-03-2024_2_compressed.pdf4 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plans_Revised dated 21-03-2024_1_compressed.pdf4 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plans_Revised dated 21-03-2024_2_compressed.pdf4 Apr 2024
Layout approvalFile: Sanctioned_Plans_Revised_dated_21-03-2024_1_compressed[1].pdf1 Apr 2024
Layout approvalFile: Sanctioned_Plans_Revised_dated_21-03-2024_2_compressed[1].pdf1 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanctioned_Plans_Revised_dated_21-03-2024_1_compressed[1].pdf1 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanctioned_Plans_Revised_dated_21-03-2024_2_compressed[1].pdf1 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_Bopodi_21-03-2024_Revised.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Architect Certificate_Esbee Square.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_Square.pdf27 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary_Esbee Square.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized_form 3 dec23.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Signed.pdf9 Sep 2023
Copy of the legal title reportFile: TIR Bopodi_04-09-2023_11zon.pdf5 Sep 2023
Declaration about Commencement CertificateFile: 00 Declaration about Commencement_new.pdf5 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 08 Declaration For Designated Bank Account1.pdf1 Sep 2023
Declaration in FORM BFile: Form B- Promoter.pdf24 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment.pdf22 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to ATS.pdf22 Aug 2023
Layout approvalFile: Sanctioned Plans_Bopodi (1)_Highlighted_compressed (1).pdf19 Aug 2023
Details of encumbrances concerned to FinanceFile: 07 Encumbrances concerned to Finance.pdf19 Aug 2023
Details of encumbrances concerned to FinanceFile: 09 Encumbrances concerned to Legal.pdf19 Aug 2023
Details of encumbrances concerned to LegalFile: 07 Encumbrances concerned to Finance.pdf19 Aug 2023
Details of encumbrances concerned to LegalFile: 09 Encumbrances concerned to Legal.pdf19 Aug 2023
Copy of Layout Approval (in case of layout)File: Sanctioned Plans_Bopodi (1)_Highlighted_compressed (1).pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate_Square.pdf19 Aug 2023
CERSAI detailsFile: Undertaking for No charge on Project.pdf19 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 12 Disclosure of Interest in Other Real Estate Organizations-AMA.pdf19 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 12 Disclosure of Interest in Other Real Estate Organizations-ARA.pdf19 Aug 2023
Proforma of Agreement for saleFile: ATS DRAFT.pdf19 Aug 2023
Proforma of Allotment letterFile: Model draft of Allotment letter.pdf19 Aug 2023
Building plan approvalFile: Sanctioned Plans_Bopodi (2)_11zon.pdf17 Aug 2023
PAN CardFile: PAN_Esbee Square.pdf17 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans_Bopodi (2)_11zon.pdf17 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_092923 dated 25-07-2023-Bopodi_Esbee Square.pdf17 Aug 2023

Keep ESBEE SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOPODI

Builder: ESBEE SQUARE LLP

ESBEE SQUARE LLP has 1 registration on MahaRERA, including ESBEE SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if ESBEE SQUARE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ESBEE SQUARE?

The registered promoter entity is ESBEE SQUARE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ESBEE SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ESBEE SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ESBEE SQUARE?

The professionals named in the filing: Architect: Cubix Architects Associates; Architect: Aetrium design studio; Engineer: MAYUR ANANDA AKHADE; Engineer: VIJAY MEHER; Chartered Accountant: Patel and Sharma; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ESBEE SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ESBEE SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ESBEE SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.