Home / Browse projects / Palghar, Maharashtra / Redevlopment of Pragati co-op-hou. soc.

Registration lapsed No litigation declared Residential / Group Housing project

Redevlopment of Pragati co-op-hou. soc.

By Balaji realtors

RG-MH-24216 · RERA P99000010549 · Last updated on MahaRERA portal: 25 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 48 months past the filed date
  • Completion date moved by 46 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2022Possession promised48 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 60%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Redevlopment of Pragati co-op-hou. soc. is a Residential / Group Housing project by Balaji realtors in Palghar, Maharashtra, registered with MahaRERA as P99000010549 on 31 Aug 2017. Possession was promised by 31 Oct 2022 and is now 48 months past that date. The completion date has moved by 46 months from the original filing.

At a glance

Project

  • NameRedevlopment of Pragati co-op-hou. soc.
  • TypeResidential / Group Housing
  • Location
    • Samel pada road
    • Samelpada
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000010549
  • ReraGenie IDRG-MH-24216

Builder

  • NameBalaji realtors
  • Entity typePartnership
  • Partnerumesh vasant naik
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

48 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toOct 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion31 Oct 2022
  • Revised completionRevised to 31 Oct 2022 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Redevelopment of pragati chslNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

Redevelopment of pragati chsl: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered1
Open Space55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,103 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1211.56
Proposed, not sanctioned873 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFreny Arcade, Samelpada

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectmahesh mistry
EngineerDinesh Meshram
Chartered AccountantShravan K Malaviya
PartnerRole in project
Balaji realtors-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000005075Dec 2018 → Apr 2020

Reason as filed by the promoterdue to natural calamity and other delayed statutory permissions

EXT99000008444Dec 2018 → Apr 2021

Reason as filed by the promoterdue to covid situatiion and Labour problem

EXT99000000912Dec 2018 → Apr 2020

Reason as filed by the promoterpending statutory permission and DC regulations

EXT99000011803Dec 2018 → Oct 2022

Reason as filed by the promoterdelay in statutory approval and shortage of labour and buiding material

EXT99000009563Dec 2018 → Oct 2021

Reason as filed by the promoterDue to pandemic situation

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory.pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest ( nipen ).pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest (Umesh naik).pdf25 May 2024
Declaration in FORM BFile: form b new.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan-march 2021.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: april-june 2021.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: july-sept 2021.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: oct-dec 2021.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan-march 2022.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: apr-june 2022.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: july-sept 2022.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: oct-dec2022.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan-mar2023.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: apr-june2023.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: july-sept 2023.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jan-apr 2021.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: apr-june 2021.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: july-sept 2021.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: oct-dec2021.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jan-mar2022.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: apr-june2022.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: july-sept2022.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: oct-dec2022.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jan-march2023.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: apr-june2023.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: July -sept 2023.pdf27 Dec 2023
Declaration in FORM BFile: new form B.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 jan- MARCH 2021 Form - 2 Engineer’s Certificate.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-20-21.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-20-21.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM4 21-22.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5 22-23.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22 form2A.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 2A.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23 form 2A.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23 2A.pdf20 Sep 2023
Certificates of CA (Form 3)File: form 3 (1).pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf20 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 2 ENG certificate 18092023.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AnyScanner09182023.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 ENG certificate 18092023.pdf18 Sep 2023
Declaration in FORM BFile: NewFormB Pragati.pdf15 Sep 2023
Disclosure of sold/ booked inventoryFile: new Disclosure of Sold-Booked inventory pragati.pdf15 Sep 2023
Declaration about Commencement CertificateFile: declaration of CC new.pdf6 Sep 2023
CERSAI detailsFile: Undertaking pragati CHSL.pdf6 Sep 2023
Proforma of Allotment letterFile: allotment letter new.pdf6 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seprate bank account details pragati.pdf6 Sep 2023
Deviation Report with respect to Allotment letterFile: allotment letter new.pdf6 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Model Form of Agreement1.pdf6 Sep 2023
Deviation Report with respect to model copy of AgreementFile: seprate bank account details pragati.pdf6 Sep 2023
Proforma of Agreement for saleFile: Model_AFS_in_English.pdf5 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: cc pragati chsl.pdf18 Aug 2023
Declaration about Commencement CertificateFile: Declaration About CC.pdf18 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Pragati Disclosure Of Intrest In Other Real Estate Org.pdf18 Aug 2023
Proforma of Agreement for saleFile: Pragati Draft (2) (1).pdf18 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf18 Aug 2023
Deviation Report with respect to Allotment letterFile: 1 Proforma of Allotment letter.pdf18 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Pragati Draft (2) (1).pdf18 Aug 2023
Disclosure of sold/ booked inventoryFile: Balaji Realtors Letter.pdf16 Aug 2023
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf11 Aug 2023
Declaration in FORM BFile: Balaji Realtors Affidavit.pdf10 Aug 2023
Declaration in FORM BFile: Balaji Realtors Affidavit.pdf10 Aug 2023
Declaration in FORM BFile: Balaji Realtors Affidavit.pdf10 Aug 2023
Declaration in FORM BFile: Balaji Realtors Affidavit.pdf10 Aug 2023
Declaration in FORM BFile: Balaji Realtors Affidavit.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: Balaji Realtors Letter.pdf10 Aug 2023
Certificates of CA (Form 3)File: New Doc 2017-07-28_3 ca.pdf28 Jul 2017
Certificates of CA (Form 3)File: New Doc 2017-07-28 ca.pdf28 Jul 2017
Building plan approvalFile: sheet 1.pdf27 Jul 2017
Layout approvalFile: sheet 1.pdf27 Jul 2017
Layout approvalFile: sheet 2.pdf27 Jul 2017
PAN CardFile: Umesh_Naik_pan_card.pdf27 Jul 2017
Copy of the legal title reportFile: title_pragati_2017-07-27.pdf27 Jul 2017
Details of encumbrancesFile: title_pragati_2017-07-27.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: sheet 1.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: sheet 2.pdf27 Jul 2017
Building Plan Approval (IOD)File: sheet 1.pdf27 Jul 2017
Declaration in FORM BFile: New_Doc_2017-07-27 pragati.pdf27 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 46 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Redevlopment of Pragati co-op-hou. soc. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Samelpada3,200+ in Palghar

2 kmRedevlopment of Pragati Completed 3Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Balaji realtors

BALAJI REALTORS has 2 registrations on MahaRERA, including DESTINY and Redevlopment of Pragati co-op-hou. soc.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that Redevlopment of Pragati co-op-hou. soc. shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Redevlopment of Pragati co-op-hou. soc. is delayed beyond 31 Oct 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Redevlopment of Pragati co-op-hou. soc.?

The registered promoter entity is Balaji realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Redevlopment of Pragati co-op-hou. soc.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Redevlopment of Pragati co-op-hou. soc.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Redevlopment of Pragati co-op-hou. soc.?

The professionals named in the filing: Architect: mahesh mistry; Engineer: Dinesh Meshram; Chartered Accountant: Shravan K Malaviya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Redevlopment of Pragati co-op-hou. soc.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Redevlopment of Pragati co-op-hou. soc.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Redevlopment of Pragati co-op-hou. soc. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.