Home / Browse projects / Mumbai Suburban, Maharashtra / Redevelopment of Ganpati Niwas CHSL
Redevelopment of Ganpati Niwas CHSL
By BHARAT REALTY VENTURE PRIVATE LIMITED
RG-MH-08307 · RERA P51800000524 · Last updated on MahaRERA portal: 7 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 15 months past the filed date
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Rs 90.00 crore secured on the land, in favour of Central Bank of India
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Redevelopment of Ganpati Niwas CHSL is a Others project by BHARAT REALTY VENTURE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000524 on 18 Jul 2017. Possession was promised by 31 Jul 2025 and is now 15 months past that date. 9 of the 9 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameRedevelopment of Ganpati Niwas CHSL
- TypeOthers
- Location
- .Link Road
- Bangur Nagar
- Goregaon
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000524
- ReraGenie IDRG-MH-08307
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Jul 2017
- Promised completion31 Jul 2025
- Revised completionNone
- Buildings1 building record
- Documents filed177 files
Current status
Figures as on 7 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ganpati Niwas CHSL Bharat Arize | NA | 32 | 28 | 5 | 4 | 9 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Ganpati Niwas CHSL Bharat Arize: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed165
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | S. P. Associates. |
| Architect | Vasant B Pissay Balram Pissay |
| Engineer | Dr. Kelkar Designs Pvt. Ltd. |
| Engineer | Ketan Gunvant Khamar |
| Chartered Accountant | Nirav Bhupat Mehta |
| Chartered Accountant | K V Sheth |
| Partner | Role in project |
|---|---|
| BHARAT REALTY VENTURE PRIVATE LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| COM/35/2018/2017 | High Court | pending |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502453 | Amruta Rishikesh Mantri | BHARAT REALTY VENTURE PRIVATE LIMITED | 18/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Nov 2024
Documents filed177
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 with BCC Ganpati Niwas.pdf | 7 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Ganpati Niwas 06th nov 2024.pdf | 29 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 11.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 10.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 9.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 8.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 7.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 6.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 5.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 4.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 3.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 2.pdf | 7 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 1.pdf | 7 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Ganpati Niwas 06th nov 2024.pdf | 6 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BCC ganpati Niwas 05th NOV 2024.pdf | 6 Nov 2024 |
| Certificates of CA (Form 3)File: CA certificates Ganpati Niwas Form 3 Sept 24.pdf | 29 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 GANPATI NIWAS 23 24.pdf | 28 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE GANPATI NIWAS FORM 2A Sep 2024.pdf | 21 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 11 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 10 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 9 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 8 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 7 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2 Plan.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Plannnnn.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2438321_OC_signed (1).pdf | 7 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE BHARAT ARIZE March 2024.pdf | 29 Jul 2024 |
| Certificates of CA (Form 3)File: GANPATI NIWAS RERA FORM March 2024.pdf | 26 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Ganpati Niwas Mortgage Deed With Central Bank Dated 15th March 2022.pdf | 3 May 2024 |
| Details of encumbrances concerned to LegalFile: Ganpati Niwas Mortgage Deed With Central Bank Dated 15th March 2022.pdf | 3 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ganpati Niwas Architects Certificate - 15-03-2024.pdf | 30 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE - GANPATI NIWAS - 01-04-2024.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Ganpati Niwas Sole Inventory 31st Dec 2023.pdf | 30 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GANPATI NIWAS ARCH CERTIFICATE AS ON 16TH JANUARY 2024.pdf | 19 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE GANPATI NIWAS 01ST JANUARY 2024.pdf | 19 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ganpati Niwas 30TH SEP 2023.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: GANPATI NIWAS CA CERTIFICATE AS ON 31ST DECEMBER 2023.pdf | 19 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Self Declaration Encumbrances.pdf | 7 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration Encumbrances.pdf | 7 Dec 2023 |
| Proforma of Agreement for saleFile: Sale Agreement part 1.pdf | 7 Dec 2023 |
| Proforma of Agreement for saleFile: Sale Agreement part 2.pdf | 7 Dec 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 7 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf | 7 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report model Agreement for sale.pdf | 7 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf | 22 Nov 2023 |
| Details of encumbrancesFile: Mortgage Deed With Central Bank Dated 15th March 2022 Index 2.pdf | 7 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Ganpati Niwas Sold Inventory Sep 2023.pdf | 30 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ganpati Niwas Architects Certificate Sep 2023.pdf | 17 Oct 2023 |
| Certificates of CA (Form 3)File: CA FORM 3 Ganpati Niwas Sep 2023.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Ganpati Niwas sold inventory june 2023.pdf | 11 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure Intrest.pdf | 8 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Ganpati Niwas 30th June 2023.pdf | 5 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GANPATI NIWAS RERA FORM 5 FY 22-23 A Achrekar 18072023.pdf | 19 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 1 Architects Certificate of completion 17072023.pdf | 17 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Crtfcate for GANAPATI NIWAS RERA AS ON 30062023.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineers Certificates - Ganpati Niwas.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineers Certificates -Bharat Arize Ganpati Niwas 30th March 2023 (1).pdf | 25 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Ganpati Niwas Sold Flats March 2023.pdf | 25 Apr 2023 |
| Certificates of CA (Form 5)File: FORM 5 Ganpati Niwas March 2023.pdf | 25 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Bharat Arize March 2023.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: Ganpati Niwas RERA 31st March 2023.pdf | 24 Apr 2023 |
| Building plan approvalFile: Amended IOD 27th Dec 2022 Ganpati Niwas.pdf | 25 Jan 2023 |
| Building plan approvalFile: IOD dated 27th Dec 2022.pdf | 25 Jan 2023 |
| Building Plan Approval (IOD)File: Amended IOD 27th Dec 2022 Ganpati Niwas.pdf | 25 Jan 2023 |
| Building Plan Approval (IOD)File: IOD dated 27th Dec 2022.pdf | 25 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Ganpati Niwas Sold Flats Dec 2022.pdf | 25 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineers Certificates - Ganpati Niwas.pdf | 24 Jan 2023 |
| Certificates of CA (Form 3)File: Bharat Arize Rera 31st Dec 2022.pdf | 12 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bharat Arize 31 Dec 2022.pdf | 11 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ganpati Niwas Sep 2022.pdf | 5 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineers Certificates - Ganpati Niwas.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 Ganpati Niwas 31st Dec 2022.pdf | 5 Jan 2023 |
| Certificates of CA (Form 3)File: GANAPATI NIWAS SIGNED (1).pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Form 5 GN June 2022.pdf | 5 Jan 2023 |
| Declaration about Commencement CertificateFile: Further CC Ganpati Niwas Dated 09th Nov 2022.pdf | 11 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Ganpati Sold June 2022.pdf | 10 Aug 2022 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| JUHU vISTAS | Plot No. 50 survey no. 287 CTS no. 484 of Village Vile Parle West | 9 | Completed | Mar 2024 | Late, May 2024 |
| JUHU ACROPOLIS | Gulmohar Cross Road JUPD Scheme JUHU | 75 | Completed | Mar 2024 | Sep 2022 |
| Redevelopment of Existing building no 5 known as Mahavir Nagar Tristar CHSL | Mahavir Nagar Kandivali Wesy | 58 | Completed | Dec 2022 | Sep 2021 |
| Bharat Ecovistas Phase II | Shilphata Junction Thane | 256 | Completed | Dec 2022 | Sep 2020 |
| Redevelopment of Malad Swing | Marve Road Malad West | 73 | Completed | Dec 2021 | Jan 2018 |
| Redevelopment of Godi Kamgar Building C3 Wing B Skyvistas Bluez Phase III | D.N. Nagar Andheri West | 93 | Completed | Dec 2021 | Mar 2020 |
| Ecovistas Building D1 Fairfield Phase I | Shilphata Junction Thane | 122 | Completed | Dec 2016 | Late, Apr 2017 |
| Ecovistas Building C2 Moorfield Phase I | Shilphata Junction Thane | 134 | Completed | Dec 2016 | Late, Apr 2017 |
| Redevelopment of God Kamgar Building C3 Wing A Skyvistas Skyz Phase II | D N Nagar Andheri West | 92 | Completed | Sep 2016 | Sep 2016 |
| Redevelopment of Park Darshan CHSL Parkvistas | Lallu Bhai Park Andheri West Mumbai Maharashtra 400058 | 64 | Completed | Dec 2015 | Late, Aug 2016 |
| Redevelopment of Godi Kamgar Building C2 Phase II | D N Nagar Andheri West | 89 | Completed | Apr 2014 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 177 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Redevelopment of Ganpati Niwas CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bangur Nagar , Goregaon6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 336 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: BHARAT REALTY VENTURE PRIVATE LIMITED
BHARAT REALTY VENTURE PRIVATE LIMITED has 11 registrations on MahaRERA, including Redevelopment of Malad Swing CHSL and Redevelopment of Godi Kamgar Building C3 Wing B Skyvistas Bluez Phase III. Its filings disclose 11 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Redevelopment of Ganpati Niwas CHSL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Redevelopment of Ganpati Niwas CHSL is delayed beyond 31 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Redevelopment of Ganpati Niwas CHSL?
The registered promoter entity is BHARAT REALTY VENTURE PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH1998PTC116452 and GSTIN 27AABCB3630P1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Redevelopment of Ganpati Niwas CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Redevelopment of Ganpati Niwas CHSL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Redevelopment of Ganpati Niwas CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Redevelopment of Ganpati Niwas CHSL?
The professionals named in the filing: Architect: S. P. Associates.; Architect: Vasant B Pissay Balram Pissay; Engineer: Dr. Kelkar Designs Pvt. Ltd.; Engineer: Ketan Gunvant Khamar; Chartered Accountant: Nirav Bhupat Mehta; Chartered Accountant: K V Sheth. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Redevelopment of Ganpati Niwas CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback