Home / Browse projects / Solapur, Maharashtra / Rastratej Atal Project
Rastratej Atal Project
RG-MH-03468 · RERA P52600019892 · Last updated on MahaRERA portal: 27 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rastratej Atal Project is a Residential / Group Housing project by ajan homes private limited in Solapur, Maharashtra, registered with MahaRERA as P52600019892 on 11 Mar 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing.
At a glance
Project
- NameRastratej Atal Project
- TypeResidential / Group Housing
- Location
- Dahitne
- solapur
- Solapur (M Corp.)
- Solapur North
- 413002
- Pincode413002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600019892
- ReraGenie IDRG-MH-03468
Builder
- Nameajan homes private limited
- Entity typeCompany
- DirectorsSaurabh V Manglekar, Deepak M Sawant
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Mar 2019
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
- Buildings220 building records
- Documents filed118 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 92/2-A15 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A16 | NA | 3 | 0 | 0 | 0 | 0 |
| 83/1B AND 86/3B-B1 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B2 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B3 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B4 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B5 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B6 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B7 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B8 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B9 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B10 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B11 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B12 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B13 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B14 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B15 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B16 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B17 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B18 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B19 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B20 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B21 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B22 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B23 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B24 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B25 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B26 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C18 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C19 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C20 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C21 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C22 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C23 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D1 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D2 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D3 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D4 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D5 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D6 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D7 | NA | 4 | 0 | 0 | 0 | 0 |
| L4-D8 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D9 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D10 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D11 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D12 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D13 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D14 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D15 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D16 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D17 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D18 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D19 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D20 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D21 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D22 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A1 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A2 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A3 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A4 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A5 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A6 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A7 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A8 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A9 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A10 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A11 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A12 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A13 | NA | 3 | 0 | 0 | 0 | 0 |
| 92/2-A14 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B27 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B28 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B29 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B30 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B31 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B32 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B33 | NA | 3 | 0 | 0 | 0 | 0 |
| 86/1B AND 86/3B-B34 | NA | 3 | 0 | 0 | 0 | 0 |
| L2-B24 | NA | 3 | 0 | 0 | 0 | 0 |
| L2-B25 | NA | 3 | 0 | 0 | 0 | 0 |
| L2-B26 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C1 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C2 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C3 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C4 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C5 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C6 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C7 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C8 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C9 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C10 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C11 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C12 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C13 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C14 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C15 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C16 | NA | 3 | 0 | 0 | 0 | 0 |
| L3-C17 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D23 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D24 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D25 | NA | 3 | 0 | 0 | 0 | 0 |
| L4-D26 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E1 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E2 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E3 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E4 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E5 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E6 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E7 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E8 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E9 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E10 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E11 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E12 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E13 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E14 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E15 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E16 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E17 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E18 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E19 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E20 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E21 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E22 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E23 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E24 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E25 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E26 | NA | 3 | 0 | 0 | 0 | 0 |
| L5-E27 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F1 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F2 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F3 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F4 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F5 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F6 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F7 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F8 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F9 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F10 | NA | 3 | 0 | 0 | 0 | 0 |
| L6-F11 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G1 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G2 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G3 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G4 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G5 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G6 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G7 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G8 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G9 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G10 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G11 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G12 | NA | 3 | 0 | 0 | 0 | 0 |
| L7-G13 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H1 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H2 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H3 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H4 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H5 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H6 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H7 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H8 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H9 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H10 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H11 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H12 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H13 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H14 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H15 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H16 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H17 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H18 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H19 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H20 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H21 | NA | 3 | 0 | 0 | 0 | 0 |
| L8-H22 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I1 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I2 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I3 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I4 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I5 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I6 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I7 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I8 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I9 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I10 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I11 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I12 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I13 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I14 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I15 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I16 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I17 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I18 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I19 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I20 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I21 | NA | 3 | 0 | 0 | 0 | 0 |
| L9-I22 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J1 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J2 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J3 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J4 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J5 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J6 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J7 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J8 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J9 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J10 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J11 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J12 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J13 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J14 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J15 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J16 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J17 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J18 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J19 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J20 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J21 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J22 | NA | 3 | 0 | 0 | 0 | 0 |
| L10-J23 | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 220 buildings; the table lists the first 20.
321 of 2420 construction stages are filed complete across 220 buildings. The stage furthest along is Podiums (if any), at 0%.
92/2-A1573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
92/2-A1673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
83/1B AND 86/3B-B19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B436%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B536%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B636%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B736%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B873%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B973%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1473%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1773%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
86/1B AND 86/3B-B1873%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed5223
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| 92/2-A15 | 24 | 24 |
| 92/2-A16 | 24 | 24 |
| 83/1B AND 86/3B-B1 | 24 | 24 |
| 86/1B AND 86/3B-B2 | 24 | 24 |
| 86/1B AND 86/3B-B3 | 24 | 24 |
| 86/1B AND 86/3B-B4 | 24 | 24 |
| 86/1B AND 86/3B-B5 | 24 | 24 |
| 86/1B AND 86/3B-B6 | 24 | 24 |
| 86/1B AND 86/3B-B7 | 24 | 24 |
| 86/1B AND 86/3B-B8 | 24 | 24 |
| 86/1B AND 86/3B-B9 | 24 | 24 |
| 86/1B AND 86/3B-B10 | 24 | 24 |
| 86/1B AND 86/3B-B11 | 24 | 24 |
| 86/1B AND 86/3B-B12 | 24 | 24 |
| 86/1B AND 86/3B-B13 | 24 | 24 |
| 86/1B AND 86/3B-B14 | 24 | 24 |
| 86/1B AND 86/3B-B15 | 24 | 24 |
| 86/1B AND 86/3B-B16 | 24 | 24 |
| 86/1B AND 86/3B-B17 | 24 | 24 |
| 86/1B AND 86/3B-B18 | 24 | 24 |
| 86/1B AND 86/3B-B19 | 24 | 24 |
| 86/1B AND 86/3B-B20 | 24 | 24 |
| 86/1B AND 86/3B-B21 | 24 | 24 |
| 86/1B AND 86/3B-B22 | 24 | 24 |
| 86/1B AND 86/3B-B23 | 24 | 24 |
| 86/1B AND 86/3B-B24 | 24 | 24 |
| 86/1B AND 86/3B-B25 | 24 | 24 |
| 86/1B AND 86/3B-B26 | 24 | 24 |
| L3-C18 | 24 | 24 |
| L3-C19 | 24 | 24 |
| L3-C20 | 24 | 24 |
| L3-C21 | 24 | 24 |
| L3-C22 | 24 | 24 |
| L3-C23 | 24 | 24 |
| L4-D1 | 24 | 24 |
| L4-D2 | 24 | 24 |
| L4-D3 | 24 | 24 |
| L4-D4 | 24 | 24 |
| L4-D5 | 24 | 24 |
| L4-D6 | 24 | 24 |
| L4-D7 | 24 | 24 |
| L4-D8 | 24 | 24 |
| L4-D9 | 24 | 24 |
| L4-D10 | 24 | 24 |
| L4-D11 | 24 | 24 |
| L4-D12 | 24 | 24 |
| L4-D13 | 24 | 24 |
| L4-D14 | 24 | 24 |
| L4-D15 | 24 | 24 |
| L4-D16 | 24 | 24 |
| L4-D17 | 24 | 24 |
| L4-D18 | 24 | 24 |
| L4-D19 | 24 | 24 |
| L4-D20 | 24 | 24 |
| L4-D21 | 24 | 24 |
| L4-D22 | 24 | 24 |
| 92/2-A1 | 24 | 24 |
| 92/2-A2 | 24 | 24 |
| 92/2-A3 | 24 | 24 |
| 92/2-A4 | 24 | 24 |
| 92/2-A5 | 24 | 24 |
| 92/2-A6 | 24 | 24 |
| 92/2-A7 | 24 | 24 |
| 92/2-A8 | 24 | 24 |
| 92/2-A9 | 24 | 24 |
| 92/2-A10 | 24 | 24 |
| 92/2-A11 | 24 | 24 |
| 92/2-A12 | 24 | 24 |
| 92/2-A13 | 24 | 24 |
| 92/2-A14 | 24 | 24 |
| 86/1B AND 86/3B-B27 | 24 | 24 |
| 86/1B AND 86/3B-B28 | 24 | 24 |
| 86/1B AND 86/3B-B29 | 24 | 24 |
| 86/1B AND 86/3B-B30 | 24 | 24 |
| 86/1B AND 86/3B-B31 | 24 | 24 |
| 86/1B AND 86/3B-B32 | 24 | 24 |
| 86/1B AND 86/3B-B33 | 24 | 24 |
| 86/1B AND 86/3B-B34 | 24 | 24 |
| L2-B24 | 24 | 24 |
| L2-B25 | 24 | 24 |
| L2-B26 | 24 | 24 |
| L3-C1 | 24 | 24 |
| L3-C2 | 24 | 24 |
| L3-C3 | 24 | 24 |
| L3-C4 | 24 | 24 |
| L3-C5 | 24 | 24 |
| L3-C6 | 24 | 24 |
| L3-C7 | 24 | 24 |
| L3-C8 | 24 | 24 |
| L3-C9 | 24 | 24 |
| L3-C10 | 24 | 24 |
| L3-C11 | 24 | 24 |
| L3-C12 | 24 | 24 |
| L3-C13 | 24 | 24 |
| L3-C14 | 14 | 14 |
| L3-C15 | 24 | 24 |
| L3-C16 | 24 | 24 |
| L3-C17 | 24 | 24 |
| L4-D23 | 24 | 24 |
| L4-D24 | 24 | 24 |
| L4-D25 | 24 | 24 |
| L4-D26 | 24 | 24 |
| L5-E1 | 24 | 24 |
| L5-E2 | 24 | 24 |
| L5-E3 | 24 | 24 |
| L5-E4 | 24 | 24 |
| L5-E5 | 24 | 24 |
| L5-E6 | 24 | 24 |
| L5-E7 | 24 | 24 |
| L5-E8 | 24 | 24 |
| L5-E9 | 24 | 24 |
| L5-E10 | 24 | 24 |
| L5-E11 | 24 | 24 |
| L5-E12 | 24 | 24 |
| L5-E13 | 24 | 24 |
| L5-E14 | 24 | 24 |
| L5-E15 | 24 | 24 |
| L5-E16 | 24 | 24 |
| L5-E17 | 24 | 24 |
| L5-E18 | 24 | 24 |
| L5-E19 | 24 | 24 |
| L5-E20 | 24 | 24 |
| L5-E21 | 24 | 24 |
| L5-E22 | 24 | 24 |
| L5-E23 | 24 | 24 |
| L5-E24 | 24 | 24 |
| L5-E25 | 24 | 24 |
| L5-E26 | 24 | 24 |
| L5-E27 | 24 | 24 |
| L6-F1 | 24 | 24 |
| L6-F2 | 24 | 24 |
| L6-F3 | 24 | 24 |
| L6-F4 | 24 | 24 |
| L6-F5 | 24 | 24 |
| L6-F6 | 24 | 24 |
| L6-F7 | 24 | 24 |
| L6-F8 | 24 | 24 |
| L6-F9 | 24 | 24 |
| L6-F10 | 24 | 24 |
| L6-F11 | 24 | 24 |
| L7-G1 | 1 | 1 |
| L7-G2 | 24 | 24 |
| L7-G3 | 24 | 24 |
| L7-G4 | 24 | 24 |
| L7-G5 | 24 | 24 |
| L7-G6 | 24 | 24 |
| L7-G7 | 24 | 24 |
| L7-G8 | 24 | 24 |
| L7-G9 | 24 | 24 |
| L7-G10 | 24 | 24 |
| L7-G11 | 24 | 24 |
| L7-G12 | 24 | 24 |
| L7-G13 | 24 | 24 |
| L8-H1 | 24 | 24 |
| L8-H2 | 24 | 24 |
| L8-H3 | 24 | 24 |
| L8-H4 | 24 | 24 |
| L8-H5 | 24 | 24 |
| L8-H6 | 24 | 24 |
| L8-H7 | 24 | 24 |
| L8-H8 | 24 | 24 |
| L8-H9 | 24 | 24 |
| L8-H10 | 24 | 24 |
| L8-H11 | 24 | 24 |
| L8-H12 | 24 | 24 |
| L8-H13 | 24 | 24 |
| L8-H14 | 24 | 24 |
| L8-H15 | 24 | 24 |
| L8-H16 | 24 | 24 |
| L8-H17 | 24 | 24 |
| L8-H18 | 24 | 24 |
| L8-H19 | 24 | 24 |
| L8-H20 | 24 | 24 |
| L8-H21 | 24 | 24 |
| L8-H22 | 24 | 24 |
| L9-I1 | 24 | 24 |
| L9-I2 | 24 | 24 |
| L9-I3 | 24 | 24 |
| L9-I4 | 24 | 24 |
| L9-I5 | 24 | 24 |
| L9-I6 | 24 | 24 |
| L9-I7 | 24 | 24 |
| L9-I8 | 24 | 24 |
| L9-I9 | 24 | 24 |
| L9-I10 | 24 | 24 |
| L9-I11 | 24 | 24 |
| L9-I12 | 24 | 24 |
| L9-I13 | 24 | 24 |
| L9-I14 | 24 | 24 |
| L9-I15 | 24 | 24 |
| L9-I16 | 24 | 24 |
| L9-I17 | 24 | 24 |
| L9-I18 | 24 | 24 |
| L9-I19 | 24 | 24 |
| L9-I20 | 24 | 24 |
| L9-I21 | 24 | 24 |
| L9-I22 | 24 | 24 |
| L10-J1 | 24 | 24 |
| L10-J2 | 24 | 24 |
| L10-J3 | 24 | 24 |
| L10-J4 | 24 | 24 |
| L10-J5 | 24 | 24 |
| L10-J6 | 24 | 24 |
| L10-J7 | 24 | 24 |
| L10-J8 | 24 | 24 |
| L10-J9 | 24 | 24 |
| L10-J10 | 24 | 24 |
| L10-J11 | 24 | 24 |
| L10-J12 | 24 | 24 |
| L10-J13 | 24 | 24 |
| L10-J14 | 24 | 24 |
| L10-J15 | 24 | 24 |
| L10-J16 | 24 | 24 |
| L10-J17 | 24 | 24 |
| L10-J18 | 24 | 24 |
| L10-J19 | 24 | 24 |
| L10-J20 | 24 | 24 |
| L10-J21 | 24 | 24 |
| L10-J22 | 24 | 24 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ajan Homes Private Limited | Solapur (M Corp.) | Solapur |
| niyojit rastratej atal kamgar sah gruh sanstha | Solapur (M Corp.) | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Santosh Mote |
| Engineer | Shriniwas Moholkar |
| Engineer | Anant Chaitanya Consultancy Services |
| Chartered Accountant | Dinesh Anand Tulshigar |
| Chartered Accountant | DPMK & Associates |
| Partner | Role in project |
|---|---|
| Anukarati Homes Private Limited (Formerly Known as ajan homes private limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) Unexpected delay in confirmation from Mathadi Kamgar and others in Solapur for availing PMAY scheme 2) Delay in geotagging and beneficiary validation as most of the beneficiaries are working in unorganized sector and couldnt be available at day time for geotagging. 3) Delay due to lockdown caused by COVID-19.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Mar 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Mar 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: RASHTRATEJ ARCHITECTS CERTIFICATE_31 MARCH 2026.pdf | 27 Apr 2026 |
| Form 2File: RASHTRATEJ ENGINEERS CERTIFICATE_31 MARCH 2026.pdf | 27 Apr 2026 |
| Form 3File: RASHTRATEJ _CA CERTIFICATE_31 MARCH 2026.pdf | 27 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: RASHTRATEJ SOLD UNSOLD_31 MARCH 2026.pdf | 27 Apr 2026 |
| Form 2A (FY 2025-2026)File: RASHTRATEJ QUALITY ASSURANCE_31 MARCH 2026.pdf | 27 Apr 2026 |
| Form 1File: RERA RASHTRATEJ ARCHITECTS CERTIFICATE_31 DEC 2025.pdf | 29 Jan 2026 |
| Form 2File: RERA ENGG CERTIFICATE RASHTRATEJ_31 DEC 2025.pdf | 29 Jan 2026 |
| Form 3File: RERA CA CERTIFICATE RASHTRATEJ_31 DEC 2025FINAL.pdf | 29 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD RASHTRATEJ_31 DEC 2025FINAL.pdf | 29 Jan 2026 |
| Form 5 (FY 2024-2025)File: Rashtratej Atal RERA Form 5 FY 24-25.pdf | 24 Dec 2025 |
| Form 1File: FORM 1 R TEJ ARCHITECT CERTIFICATE 30 SEP 2025.pdf | 1 Dec 2025 |
| Form 2File: FORM 2 R TEJ ENGINEER CERTIFICATE 30 SEP 2025.pdf | 1 Dec 2025 |
| Form 3File: FORM 3 R TEJ CA CERTIFICATE 30 SEP 2025.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: R JEJ SOLD UNSOLD INVENTORY 30 SEP 2025.pdf | 1 Dec 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: RTEJ SOLD UNSOLD INVENTORY 30 JUNE 2025_11zon.pdf | 28 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: RASHTRATEJ SOLD UNSOLD 31 March 2025.pdf | 17 May 2025 |
| Certificates of CA (Form 3)File: RASHTRATEJ _FORM 3_March 25.pdf | 16 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA RASHTRATEJ ARCHITECT CERTIFICATE MARCH25.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA RASHTRATEJ ATAL ENGG CERTIFICATE MARCH25.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA RASHTRATEJ ATAL ENGG CERTIFICATE QAC MARCH25.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: RASHTRATEJ CA CERTIFICATE FORM3 DEC 2024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RASHTRATEJ ATAL ARCHITECT CERTIFICATE 31 DEC 2024.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RASHTRATEJ ATAL ENGINEERS CERTIFICATE 31 DEC 2024.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RASHTRATEJ ATAL SOLD UNSOLD 31 DEC 2024.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RASHTRATEJ_FORM 5 March 24.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RTEJ ARCHITECT CERTIFCATE JUNE 24.pdf | 26 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RASHTRATEJ ATAL ARCHITECTS CERTIFICATE SEP 24.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3)File: RASHTRATEJ CA CERTIFICATE JUNE 24.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3)File: RASHTRATEJ CA CERTIFICATE FORM 3 SEP 24.pdf | 26 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RTEJ ENGINEER CERTIFCATE JUNE 24.PDF | 26 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RASHTRATEJ ATAL ENGINEERS CERTIFICATE SEP 24.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: RASHTRATEJ ATAL SOLD UNSOLD MAR 24.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: RASHTRATEJ ATAL SOLD UNSOLD JUNE 24.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: RASHTRATEJ ATAL SOLD UNSOLD SEP 24.pdf | 26 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Atal March 2024.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.PDF | 2 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A March 2024.PDF | 2 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Atal March 2024.pdf | 2 May 2024 |
| Declaration in FORM BFile: Form B - SM Sir.pdf | 26 Mar 2024 |
| Declaration in FORM BFile: Form B- Deepak Sawant.pdf | 26 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - December 2023.pdf | 21 Mar 2024 |
| Certificates of CA (Form 3)File: RASHTRATEJ_FORM 3_DEC 23Updated.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 -December 2021.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 - June 22.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 - Sept 22.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 - Dec 2022.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2023.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 - June 23.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 - Sept 23.pdf | 11 Mar 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 7 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other real estate Saurabh M.pdf | 7 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - DMS.pdf | 7 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION RASHTRATEJ.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA 2A 2023.PDF | 6 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RASHTRATJE FORM 5 MARCH 23_Bank (1).PDF | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 23.PDF | 28 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 23.PDF | 28 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2023.pdf | 28 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 2023.pdf | 28 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- December 2023.PDF | 28 Feb 2024 |
| Certificates of CA (Form 3)File: RASHTRATEJ_FORM 3_MAR 23 (1).PDF | 28 Feb 2024 |
| Certificates of CA (Form 3)File: RASHTRATEJ_FORM 3_JUN 23 (1).PDF | 28 Feb 2024 |
| Certificates of CA (Form 3)File: RASHTRATEJ_FORM 3_SEP 23.PDF | 28 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 - December 2023.pdf | 28 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - December 2021.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2022.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - September 2022.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - December 2022.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 -June 2022.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 - Sept 2022.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 - December 2022.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unslod Invetory - Atal.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rashtratej_form1_2019.PDF | 22 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rashtratej_Form1_2020.PDF | 22 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rashtratej_Form1_2021.PDF | 22 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rashtratej_Form2_2019.PDF | 22 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rashtratej_Form2_2020.PDF | 22 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Rastratej Atal Project on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near solapur550+ in Solapur
SAMRUDDHI PARKWAY
NAGNATH SHIVSHANKAR AKKALKOTE
Tirumala Paradise
Sachin Vitthal Ghanate
Gokul Vihar
Aakruti Builders
Madhuban Paradise Part-II
Madhuri Lature
SUYOG SHRUSHTI PHASE 2
SUYOG DEVELOPERS
Radha Garden
Sudhir Patil
See every Solapur project, with the district possession charts
Builder: ajan homes private limited
ajan homes private limited has 1 registration on MahaRERA, including Rastratej Atal Project. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if Rastratej Atal Project is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rastratej Atal Project?
The registered promoter entity is ajan homes private limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rastratej Atal Project?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Rastratej Atal Project?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rastratej Atal Project?
The professionals named in the filing: Architect: Santosh Mote; Engineer: Shriniwas Moholkar; Engineer: Anant Chaitanya Consultancy Services; Chartered Accountant: Dinesh Anand Tulshigar; Chartered Accountant: DPMK & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rastratej Atal Project?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback