ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / RAPID RESIDENCY

Completed No litigation declared Residential / Group Housing project

RAPID RESIDENCY

By PARK VIEW DEVELOPERS

RG-MH-91268 · RERA P52000010355 · Last updated on MahaRERA portal: 30 Mar 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2021Possession promisedregistration recorded completed
119 of 121Construction stages doneacross 11 buildings; furthest along: External plumbing and external plaster, 85%
2Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

RAPID RESIDENCY is a Residential / Group Housing project by PARK VIEW DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000010355 on 24 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2021. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRAPID RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Matoshree Nagar
    • NERAL
    • Karjat
    • Raigarh
    • 410103
  • Pincode410103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000010355
  • ReraGenie IDRG-MH-91268

Builder

  • NamePARK VIEW DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAFFP6933N2ZM
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersKHORRUM MOHAMMED MOHAMMED ANWAR ABBAJUMA, MOHAMMED ANWAR ABDUL LATIF ABBAJUMMA, MOHAMMED ASLAM MOHAMMED ANWAR ABBAJUMMA, AHMED MOHAMED SHAMIM ABBAJUMA
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedJun 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Aug 2017
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings11 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAPID RESIDENCY PHASE 3 BLG NO 1 2 AND 3NA130000
RAPID RESIDENCY PHASE 2 BLDG NO 1 2 3 4 5 6 8 10NA100000
RAPID RESIDENCY PHASE 2 BLDG NO 7 9 12 15 16NA130000
RAPID RESIDENCY PHASE 2 BLDG NO 11 13 14NA100000
RAPID RESIDENCY PHASE 1 BLDG NO 5 6 7NA90000
RAPID RESIDENCY PHASE 1 BLDG NO 8NA50000
RAPID RESIDENCY PHASE 1 BLDG NO 9NA50000
RAPID RESIDENCY PHASE 1 BLDG NO 10NA50000
RAPID RESIDENCY PHASE 1 BLDG NO 11NA60000
RAPID RESIDENCY PHASE 1 BLDG NO 12NA30000
RAPID RESIDENCY PHASE 1 BLDG NO 13NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building11

As on 30 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

119 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is External plumbing and external plaster, at 85%.

RAPID RESIDENCY PHASE 3 BLG NO 1 2 AND 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 2 BLDG NO 1 2 3 4 5 6 8 1094%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RAPID RESIDENCY PHASE 2 BLDG NO 7 9 12 15 16100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 2 BLDG NO 11 13 14100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 5 6 7100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 11100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 12100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAPID RESIDENCY PHASE 1 BLDG NO 13100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes25%
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36
BuildingClosed/CoveredTotal
RAPID RESIDENCY PHASE 3 BLG NO 1 2 AND 355
RAPID RESIDENCY PHASE 2 BLDG NO 1 2 3 4 5 6 8 1066
RAPID RESIDENCY PHASE 2 BLDG NO 7 9 12 15 1699
RAPID RESIDENCY PHASE 2 BLDG NO 11 13 1466
RAPID RESIDENCY PHASE 1 BLDG NO 5 6 755
RAPID RESIDENCY PHASE 1 BLDG NO 811
RAPID RESIDENCY PHASE 1 BLDG NO 911
RAPID RESIDENCY PHASE 1 BLDG NO 1011
RAPID RESIDENCY PHASE 1 BLDG NO 1122

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17748.88
Proposed, not sanctioned17,749 sq m
Buildings approved11
Buildings sanctioned11

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMOHAMMED ALI ROAD PYDHOWNIE MUMBAI 400003

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectERY SPPACES
PartnerRole in project
PARK VIEW DEVELOPERS-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000100350Kaid-E-Johar Abedin TarwalaPARK VIEW DEVELOPERS31/07/2019
CC12501456Mahendra Shivaji BergalPARK VIEW DEVELOPERS30/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Mar 2024

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf30 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 132bdf35-1e40-4518-9d68-eb5be14b7f8a.pdf23 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE 23 - byculla.pdf5 Feb 2024
Certificates of CA (Form 3)File: NERAL FORM 3 2018.pdf24 Jan 2024
Certificates of CA (Form 3)File: NERAL FORM 3 2019.pdf24 Jan 2024
Certificates of CA (Form 3)File: NERAL FORM 3 2020.pdf24 Jan 2024
Certificates of CA (Form 3)File: NERAL FORM 3 2021.pdf24 Jan 2024
Certificates of CA (Form 3)File: NERAL FORM 3 2022.pdf24 Jan 2024
Certificates of CA (Form 3)File: NERAL FORM 3 2023.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: NERAL FORM 5 2018.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: NERAL FORM 5 2019.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NERAL FORM 5 2020.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NERAL FORM 5 2021.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NERAL FORM 5 2022.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NERAL FORM 5 2023.pdf14 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 NERAL RERA 2018.pdf14 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 NERAL RERA 2019.pdf14 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 NERAL RERA 2020.pdf14 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 NERAL RERA 2021.pdf14 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 NERAL RERA 2022.pdf14 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 2018.pdf4 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 2019.pdf4 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 2020.pdf4 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 2022.pdf4 Aug 2023
Disclosure of sold/ booked inventoryFile: sold and unsold inventory.pdf4 Aug 2023
Disclosure of sold/ booked inventoryFile: sold unsold inventory 2019.pdf4 Aug 2023
Disclosure of sold/ booked inventoryFile: sold unsold inventory 2020.pdf4 Aug 2023
Disclosure of sold/ booked inventoryFile: sold and unsold inventory.pdf4 Aug 2023
Certificates of CA (Form 3)File: FORM 3 2018.pdf4 Aug 2023
Certificates of CA (Form 3)File: FORM 3 2019.pdf4 Aug 2023
Certificates of CA (Form 3)File: FORM 3 2020.pdf4 Aug 2023
Certificates of CA (Form 3)File: FORM 3 2022.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Architect Certificate Neral.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Architect Certificate Neral.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Architect Certificate Neral.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf18 Jan 2023
Certificates of CA (Form 3)File: FORM 3.pdf4 Aug 2017
Building plan approvalFile: NERAL IOD.pdf2 Aug 2017
Layout approvalFile: NERAL IOD.pdf2 Aug 2017
Copy of the legal title reportFile: NERAL TC.pdf2 Aug 2017
Copy of Layout Approval (in case of layout)File: NERAL IOD.pdf2 Aug 2017
Building Plan Approval (IOD)File: NERAL IOD.pdf2 Aug 2017
Declaration in FORM BFile: NERAL CONV.pdf2 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NERAL FORM 1.pdf2 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: nearl form 2.pdf2 Aug 2017
Proforma of Allotment letterFile: delay in draft undertaking.pdf2 Aug 2017
Details of encumbrancesFile: encumbrance.pdf31 Jul 2017
Declaration in FORM BFile: NERAL 31ST DECEMBER 2020.pdf31 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAPID RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERAL5,900+ in Raigarh

2 kmRAPID RESIDENCYCompleted 27Lapsed / revoked 23Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: PARK VIEW DEVELOPERS

PARK VIEW DEVELOPERS has 3 registrations on MahaRERA, including RAPID JEWEL and MAIMOON TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if RAPID RESIDENCY is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAPID RESIDENCY?

The registered promoter entity is PARK VIEW DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAFFP6933N2ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAPID RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAPID RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAPID RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAPID RESIDENCY?

The professionals named in the filing: Architect: ERY SPPACES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAPID RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAPID RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAPID RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.