Red flags

  • Registration lapsed
  • Possession 24 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
17 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 25%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

RANGAVALI is a Residential / Group Housing project by RONISHKA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100017973 on 1 Oct 2018. Possession was promised by 29 Oct 2024 and is now 24 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameRANGAVALI
  • TypeResidential / Group Housing
  • Location
    • OFF PAUD ROAD
    • MANKARWADI ROAD
    • GANPATI MANDIR
    • KASARAMBOLI PIRANGUT
    • Kasar Amboli
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017973
  • ReraGenie IDRG-MH-78957

Builder

  • NameRONISHKA DEVELOPERS
  • Entity typeOthers
  • Named personSANDEEP RAJWADE
  • Declared earlier projects1 →

Key dates

24 months past promisethis monthRegisteredOct 2018First promiseOct 2023Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Oct 2018
  • Promised completion29 Oct 2024
  • Revised completionRevised to 29 Oct 2024 (originally 30 Oct 2023)
  • Buildings2 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B PARTNA50000
A PARTNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 25%.

B PART70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
A PART91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 7 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes50%
ENTRANCE GATEYes100%
ENTRNACE LOBBYYes100%
PARGOLAS LANDSCAPE GARDEN NEAR ENTRANCE GATEYes100%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23
BuildingClosed/CoveredTotal
B PART1212
A PART1111

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
GAURAV V AGRAWALRamoshiwadiPune
PRAKASH S BHOOTRARamoshiwadiPune
NANDKISHORE G AGRAWALGultekadiPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI3526.91
Proposed, not sanctioned2,776 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWarje, PUNE 411058

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH KANHEKAR
EngineerARUN GOKHALE & ASSOCIATES
PartnerRole in project
RONISHKA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012890Oct 2023 → Oct 2024

Reason as filed by the promoterDEAR Sir, Due to after COVID 19 after effects we have not started sale of B wing from last 2 years as the the project is from affordable segment where our customer class is hard hit due to COVID 19, now we are starting to sell the flats from B wing for which we need extension up to abovementioned date 29.10.2024 we are completing our A wing work with completion certificate on or before the stipulated date 31.03.2023 as we have mentioned on RERA portal, in which wing we have sold the flats

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Oct 2024

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A 2021-22 merged comp.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23 merged comp.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023 24 merged Comp.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCL 20092024.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 RERA 03062024 COMP.pdf28 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Part 435 450 5P 14022024 COMP.pdf27 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA-Form-5_2022-23.pdf27 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: rera Form 5_202324 KA 435 450_.pdf27 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 RERA 03062024 COMP.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER S CERT COMP COST 21-22.pdf17 Feb 2023
Disclosure of sold/ booked inventoryFile: IMG_0001.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 COMP.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 COMP.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A March 20 COMP.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A June 20 COMP.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31 Dec 22 cOMP.pdf16 Feb 2023
Proforma of Agreement for saleFile: Rangavali Agreement to Sale PDF.pdf16 Feb 2023
Declaration about Commencement CertificateFile: Decl about Commencement Cert.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 20-21.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_1.pdf18 Oct 2022
Layout approvalFile: 01-08.pdf22 Sep 2022
Layout approvalFile: 02-08.pdf22 Sep 2022
Layout approvalFile: 03-08.pdf22 Sep 2022
Layout approvalFile: 04-08.pdf22 Sep 2022
Layout approvalFile: 05-08.pdf22 Sep 2022
Layout approvalFile: 06-08.pdf22 Sep 2022
Layout approvalFile: 07-08.pdf22 Sep 2022
Layout approvalFile: 08-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 01-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 02-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 03-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 04-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 05-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 06-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 07-08.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: 08-08.pdf22 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: CC REV II COMP.pdf22 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf27 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 SIGNED.pdf27 Mar 2021
Layout approvalFile: 01-07 (1).pdf23 Nov 2020
Layout approvalFile: 02-07_ NEW.pdf23 Nov 2020
Building plan approvalFile: 03-07 (1).pdf23 Nov 2020
Building plan approvalFile: 04-07 (1).pdf23 Nov 2020
Building plan approvalFile: 05-07 (1).pdf23 Nov 2020
Building plan approvalFile: 06-07 (1).pdf23 Nov 2020
Building plan approvalFile: 07-07 (1).pdf23 Nov 2020
Copy of Layout Approval (in case of layout)File: 01-07 (1).pdf23 Nov 2020
Copy of Layout Approval (in case of layout)File: 02-07_ NEW.pdf23 Nov 2020
Building Plan Approval (IOD)File: 03-07 (1).pdf23 Nov 2020
Building Plan Approval (IOD)File: 04-07 (1).pdf23 Nov 2020
Building Plan Approval (IOD)File: 05-07 (1).pdf23 Nov 2020
Building Plan Approval (IOD)File: 06-07 (1).pdf23 Nov 2020
Building Plan Approval (IOD)File: 07-07 (1).pdf23 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: CC Rev 1.pdf23 Nov 2020
Annual Audit Report of Statutory CA (Form 5)File: FORM 5.pdf30 Sep 2019
Certificates of CA (Form 3)File: CA Certificate Upload.pdf13 Sep 2018
Details of encumbrancesFile: No encumbrance Cert PDF.pdf12 Sep 2018
Declaration in FORM BFile: FORM B SCAN upload.pdf12 Sep 2018
Proforma of Allotment letterFile: Allotment Letter PDF.pdf30 Aug 2018
Proforma of Allotment letterFile: Rangavali Agreement to Sale PDF.pdf30 Aug 2018
Copy of the legal title reportFile: Search report 16082018 Reduced.pdf16 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Upload.pdf16 Aug 2018
Layout approvalFile: 1.pdf8 Aug 2018
Layout approvalFile: 2.pdf8 Aug 2018
Building plan approvalFile: 3.pdf8 Aug 2018
Building plan approvalFile: 4.pdf8 Aug 2018
Building plan approvalFile: 5.pdf8 Aug 2018
Building plan approvalFile: 6.pdf8 Aug 2018
Building plan approvalFile: 7.pdf8 Aug 2018
PAN CardFile: Pan Card.pdf8 Aug 2018
Copy of Layout Approval (in case of layout)File: 1.pdf8 Aug 2018
Copy of Layout Approval (in case of layout)File: 2.pdf8 Aug 2018
Building Plan Approval (IOD)File: 3.pdf8 Aug 2018
Building Plan Approval (IOD)File: 4.pdf8 Aug 2018
Building Plan Approval (IOD)File: 5.pdf8 Aug 2018
Building Plan Approval (IOD)File: 6.pdf8 Aug 2018
Building Plan Approval (IOD)File: 7.pdf8 Aug 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Shubharambh ApartmentOpposite Bharati Vidyapeeth Pune8CompletedApr 2009Late, Jun 2009

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RANGAVALI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANPATI MANDIR, KASARAMBOLI PIRANGUT13,700+ in Pune

2 kmRANGAVALICompleted 20Lapsed / revoked 16Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: RONISHKA DEVELOPERS

RONISHKA DEVELOPERS has 1 registration on MahaRERA, including RANGAVALI. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that RANGAVALI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RANGAVALI is delayed beyond 29 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RANGAVALI?

The registered promoter entity is RONISHKA DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RANGAVALI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RANGAVALI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RANGAVALI?

The professionals named in the filing: Architect: PRAKASH KANHEKAR; Engineer: ARUN GOKHALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RANGAVALI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RANGAVALI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RANGAVALI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.