Registered No litigation declared Residential / Group Housing project

RANA PARK

By SAI SHRADDHA BILDCON

RG-MH-95203 · RERA P51500055064 · Last updated on MahaRERA portal: 28 Sep 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months by MahaRERA order
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
4 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

RANA PARK is a Residential / Group Housing project by SAI SHRADDHA BILDCON in Aurangabad, Maharashtra, registered with MahaRERA as P51500055064 on 26 Feb 2024. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 17 of the 21 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameRANA PARK
  • TypeResidential / Group Housing
  • Location
    • HIRAPUR
    • CAMBRIDGE SCHOOL
    • Aurangabad
    • 431007
  • Pincode431007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500055064
  • ReraGenie IDRG-MH-95203

Builder

  • NameSAI SHRADDHA BILDCON
  • Entity typePartnership
  • PartnerJAYASHRI RAJENDRA NIMBALKAR

Key dates

this monthRegisteredFeb 2024First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Feb 2024
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings2 building records
  • Documents filed89 files

Current status

81%17 of 21 units booked
100.0%Work done, per cost certificate

Figures as on 28 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA2211011
Building B and CNA2210010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B and C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Open Space20
BuildingOpen SpaceTotal
Building A1010
Building B and C1010

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,091 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCIDCO, AURANGABAD FRINGE AREA, AURANGABAD
Permissible FSI3928.9
Proposed, not sanctioned1,838 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKUSHAL NAGAR, JALNA ROAD AURANGABAD
Estimated costRs 3.87 cr
Cost incurredRs 3.87 cr
Work done100.0%
BuildingWingEstimatedIncurred
Building ANARs 3.65 crRs 3.65 cr
-NARs 22.27 lakhRs 22.27 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMirkute Architect and Interior Designers
EngineerPRADEEP V MOTE
EngineerPRADEEP MOTE & ASSOCIATES
Chartered AccountantCA RAMDAS S SARODE
Chartered AccountantRaamdas Sarode and Associates
Chartered AccountantGOLANDE and COMPANY
PartnerRole in project
SAI SHRADDHA BILDCON-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2027 → Apr 2028

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rana Park Form-1 Mar 24.pdf28 Sep 2026
Withdrawal Update Form 1File: FORM-1 JUN 26.pdf28 Sep 2026
Withdrawal Update Form 2File: Rana Park Form-2 Mar 24.pdf28 Sep 2026
Withdrawal Update Form 2File: FORM-2 JUN 26.pdf28 Sep 2026
Withdrawal Update Form 3File: FORM-3 (RANA PARK).pdf28 Sep 2026
Withdrawal Update Form 3File: FORM-3 (RANA PARK).pdf28 Sep 2026
Form 2A (FY 2023-2024)File: FORM-2A (2023-24).pdf29 Aug 2026
Form 2A (FY 2024-2025)File: FORM-2A (2024-25).pdf29 Aug 2026
Form 2A (FY 2025-2026)File: FORM-2A (2025-26).pdf29 Aug 2026
Form 1File: Form-1 March 26.pdf28 Aug 2026
Form 2File: Form-2 March 26.pdf28 Aug 2026
Form 3File: Form-3 March 26.pdf28 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold March 26.pdf28 Aug 2026
Form 1File: FORM-1 JUN 26.pdf28 Aug 2026
Form 2File: FORM-2 JUN 26.pdf28 Aug 2026
Form 3File: FORM-3 JUN 26.pdf28 Aug 2026
Disclosure of Sold and Booked InventoryFile: SOLD JUN 26.pdf28 Aug 2026
Form 5 (FY 2023-2024)File: FORM-5 (23-24).pdf28 Aug 2026
Form 5 (FY 2024-2025)File: FORM-5 (24-25).pdf28 Aug 2026
Form 5 (FY 2025-2026)File: FORM-5 (25-26).pdf28 Aug 2026
Form 1File: Rana Park Form-1 Dec 25.pdf26 Feb 2026
Form 2File: Rana Park Form-2 Dec 25.pdf26 Feb 2026
Form 3File: Rana Park Form-3 Dec 25.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: Rana Park Sold Dec 25.pdf26 Feb 2026
Form 1File: Rana Park Form-1 Sep 2025.pdf10 Nov 2025
Form 2File: Rana Park Form-2 Sep 2025.pdf10 Nov 2025
Form 3File: Rana Park Form-3 Sep 2025.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: Rana Park Sold Sep 2025.pdf10 Nov 2025
Form 1File: 1 Form-1 June 25.pdf6 Sep 2025
Form 2File: 2 Form-2 June 25.pdf6 Sep 2025
Form 3File: 3 Form-3 June 25.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold June 25.pdf6 Sep 2025
Form 1File: Rana Park Form-1 Dec 24.pdf1 Sep 2025
Form 2File: Rana Park Form-2 Dec 24.pdf1 Sep 2025
Form 3File: Rana Park Form-3 Declaration Dec 24.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Rana Park Sold Dec 24.pdf1 Sep 2025
Form 1File: 1 Form-1 March 25.pdf1 Sep 2025
Form 2File: 2 Form-2 March 25.pdf1 Sep 2025
Form 3File: 3 Form-3 March 25.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold March 25.pdf1 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rana Park Form-1 Dec 24.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rana Park Form-3 Declaration Dec 24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rana Park Form-2 Dec 24.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Rana Park Sold Dec 24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rana Park Form-1 Jun 24.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rana Park Form-1 Sep 24.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rana Park Form-3 Jun 24.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rana Park Form-3 Sep 24.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rana Park Form-2 Jun 24.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rana Park Form-2 Sep 24.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Rana Park Sold Jun 24.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Rana Park Sold Sep 24.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rana Park Form-1 Mar 24.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rana Park Form-2 Mar 24.pdf19 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rana Park Form-2A Mar 24.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: Rana Park Sold Mar 24.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rana Park Form-3 Mar 24.pdf19 Jun 2024
Other - TechnicalFile: Rana Park Sale Deed.pdf22 Feb 2024
Other - FinanceFile: ilovepdf_merged_compressed.pdf14 Feb 2024
Other - TechnicalFile: Rana Plot-Carpet Declaration.pdf12 Feb 2024
Other - TechnicalFile: CC Verification.pdf7 Feb 2024
Other - TechnicalFile: Sai Shraddha Buildcon Annexure A.pdf7 Feb 2024
Layout approvalFile: Full Layout.pdf24 Jan 2024
Building plan approvalFile: 2-5.pdf24 Jan 2024
Building plan approvalFile: 3-5.pdf24 Jan 2024
PAN CardFile: 1 PAN Card.pdf24 Jan 2024
Copy of the legal title reportFile: Search Report ( Rana Park )_compressed.pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: No Eng Fin.pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: No Eng Legal.pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: No Eng Fin.pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: No Eng Legal.pdf24 Jan 2024
Copy of Layout Approval (in case of layout)File: Full Layout.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Sanction order.pdf24 Jan 2024
Declaration about Commencement CertificateFile: Format D.pdf24 Jan 2024
Declaration in FORM BFile: Form B.pdf24 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A.pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure -A (Vitthal Sundarde).pdf24 Jan 2024

How this compares with Aurangabad

81%of this project is bookeddistrict median 5%
15%of Aurangabad projects moved their completion datethis one moved by 4 months
31%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,500+ Aurangabad projects on ReraGenie, from their own filings.

Keep RANA PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CAMBRIDGE SCHOOL1,500+ in Aurangabad

2 kmRANA PARKCompleted 3Lapsed / revoked 3Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: SAI SHRADDHA BILDCON

SAI SHRADDHA BILDCON has 1 registration on MahaRERA, including RANA PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if RANA PARK is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RANA PARK?

The registered promoter entity is SAI SHRADDHA BILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RANA PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RANA PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RANA PARK?

The professionals named in the filing: Architect: Mirkute Architect and Interior Designers; Engineer: PRADEEP V MOTE; Engineer: PRADEEP MOTE & ASSOCIATES; Chartered Accountant: CA RAMDAS S SARODE; Chartered Accountant: Raamdas Sarode and Associates; Chartered Accountant: GOLANDE and COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RANA PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RANA PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RANA PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.