Registration lapsed No litigation declared Residential / Group Housing project

Ramleela Co-operative Housing Society Limited

By YASH INFRA

RG-MH-75857 · RERA P51700015143 · Last updated on MahaRERA portal: 6 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 51 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 80%
3Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Ramleela Co-operative Housing Society Limited is a Residential / Group Housing project by YASH INFRA in Thane, Maharashtra, registered with MahaRERA as P51700015143 on 2 Feb 2018. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 51 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameRamleela Co-operative Housing Society Limited
  • TypeResidential / Group Housing
  • Location
    • Parse wadi
    • Near Shiv Mandir
    • Thane (M Corp.)
    • Thane
    • 400603
  • Pincode400603
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015143
  • ReraGenie IDRG-MH-75857

Builder

  • NameYASH INFRA
  • Entity typePartnership
  • PartnerPriya Suyog Malusare
  • Other registrations11 more →
  • Completed2 of 12
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

7 months past promisethis monthRegisteredFeb 2018First promiseDec 2021Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Feb 2018
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 18 Dec 2021)
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.

Building A: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area615 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION THANE
Permissible FSI1168.28
Proposed, not sanctioned1,079 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThane-400602

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGodbole Mukadam & Associates
EngineerAnant Sawant
Chartered AccountantRahul Narayan Gharat
PartnerRole in project
YASH INFRA-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700011320Dec 2021 → Dec 2022

Reason as filed by the promoterDue to covid -19 Pandemic, Workers are not available on site. Material are delay due to transportation .There are many important causes of delay related to owner involvement, contractor performance, and the early planning and design of the project. ... While in time overrun, the most important factors causing delays are design changes, poor labor productivity, and resource shortages.

EXT51700013759Dec 2021 → Dec 2023

Reason as filed by the promoterDUE TO COVID 19 AND OTHER PERMISSIONS WE WERE UNABLE TO GET THE APPROVALES ON TIME THE EXTENTION IS FOR THE PURPOSE OF COMPLETING THE PROJECT ALONG WITH THE OCCUPANCY CERTIFICATE ON OR BEFORE 31.12.2023. WE THEREFORE REQUEST THE AUTHORITY TO PLEASE GRANT US THE EXTENSION.

EXT51700019592Dec 2021 → Mar 2026

Reason as filed by the promoterThe project has been completed, and we will be applying for the occupancy certificate by March 31, 2026. We are requesting an extension until March 31, 2026, with the assurance that we will finish the project before this deadline. We have updated all Quarterly Progress Reports (QPR) up to September 30, 2025, as well as Form 5 and Form 2A. Therefore, we kindly request a three-month extension.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000428829ROHAN SURESH ZAGADEYASH INFRA20/01/2024
CC12400175Vikas Narayanrao GhugeYASH INFRA21/09/2024
CC12502180Geeta Manohar NaikYASH INFRA01/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24_0001.pdf6 Feb 2025
Declaration in FORM BFile: Form B Dec 24.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVETORY.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24_0001.pdf6 Dec 2024
Certificates of CA (Form 3)File: Form 3 Ramleela.pdf3 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf21 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A 22-23_0001.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A 23-24_0001.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ramleela Soc Form 1 Apr 24 to June 24_0001.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ramleela Soc Form 1 July 24 to Sept 24_0001.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ramleela Soc Form 2 Jan 24 to Mar 24_0001_0001.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ramleela Soc Form 2 Apr 24 to June 24_0001.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ramleela Soc Form 2 July 24 to Sept 24_0001.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(2)_compressed.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 NEW.pdf10 Oct 2024
Certificates of CA (Form 3)File: Ramleela Form 3_compressed.pdf27 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf12 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf10 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf10 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf10 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf10 Mar 2023
Details of encumbrances concerned to FinanceFile: Details Of Encumrances Concerned Legal.pdf24 Nov 2022
Details of encumbrances concerned to LegalFile: Details Of Encumrances Concerned Legal.pdf24 Nov 2022
Proforma of Agreement for saleFile: Agreement 1 to 6.pdf24 Nov 2022
Proforma of Agreement for saleFile: Agreement 7 to 12.pdf24 Nov 2022
Proforma of Agreement for saleFile: Agreement 13 to 18.pdf24 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Ac No Escrow.pdf24 Nov 2022
Deviation Report with respect to Allotment letterFile: No Deviation for Allotment.pdf24 Nov 2022
Deviation Report with respect to model copy of AgreementFile: No Deviations for Agreement.pdf24 Nov 2022
CERSAI detailsFile: DECLARATION ABOUT CERSAI.pdf21 Oct 2022
Declaration about Commencement CertificateFile: Declaration About CC.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: Diclosure Of Sold Booked Unit.pdf18 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Quality Assurance Certificate Form 2A 21-22.pdf15 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Form 2A 19-20.pdf15 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A 20-21.pdf15 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A 21-22.pdf15 Oct 2022
PAN CardFile: Yash Infra Pancard.pdf20 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC ramleela.pdf6 Jun 2018
Proforma of Allotment letterFile: Document 4.pdf20 Dec 2017
Proforma of Allotment letterFile: Document 10.pdf20 Dec 2017
Proforma of Allotment letterFile: Document 14.pdf20 Dec 2017
Certificates of CA (Form 3)File: -Pg 1.pdf18 Dec 2017
Certificates of CA (Form 3)File: -Pg2.pdf18 Dec 2017
Certificates of CA (Form 3)File: pg 3.pdf18 Dec 2017
Layout approvalFile: Binder1.pdf14 Dec 2017
Layout approvalFile: MYSCAN_20171214_0011.PDF14 Dec 2017
Copy of Layout Approval (in case of layout)File: Binder1.pdf14 Dec 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171214_0011.PDF14 Dec 2017
Building plan approvalFile: IOD 2.pdf13 Dec 2017
Copy of the legal title reportFile: Title report.pdf13 Dec 2017
Copy of the legal title reportFile: search report.pdf13 Dec 2017
Details of encumbrancesFile: letter.pdf13 Dec 2017
Building Plan Approval (IOD)File: IOD 2.pdf13 Dec 2017
Declaration in FORM BFile: 1,2.pdf13 Dec 2017
Declaration in FORM BFile: 3.pdf13 Dec 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 51 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ramleela Co-operative Housing Society Limite on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Shiv Mandir7,600+ in Thane

2 kmRamleela Co-operative HoCompleted 94Lapsed / revoked 60Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 255 registered projects within 2 km.

Builder: YASH INFRA

YASH INFRA has 12 registrations on MahaRERA, including NALANDA CHS and SHILPA CHS. Its filings disclose 9 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Ramleela Co-operative Housing Society Limited shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ramleela Co-operative Housing Society Limited is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ramleela Co-operative Housing Society Limited?

The registered promoter entity is YASH INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ramleela Co-operative Housing Society Limited?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ramleela Co-operative Housing Society Limited?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ramleela Co-operative Housing Society Limited?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ramleela Co-operative Housing Society Limited?

The professionals named in the filing: Architect: Godbole Mukadam & Associates; Engineer: Anant Sawant; Chartered Accountant: Rahul Narayan Gharat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ramleela Co-operative Housing Society Limited?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ramleela Co-operative Housing Society Limited. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ramleela Co-operative Housing Society Limite to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.