RAMESHWAR COMPLEX

By RAMESHWAR CONSTRUCTIONS

RG-MH-28648 · RERA P52900027238 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 30 months from the original
15 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 80%
2Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

RAMESHWAR COMPLEX is a Others project by RAMESHWAR CONSTRUCTIONS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900027238 on 25 Nov 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRAMESHWAR COMPLEX
  • TypeOthers
  • Location
    • DEVGAD SINDHUDURG
    • BEHIND NIKHIL LUNCH HOME
    • Jamsande
    • Devgad
    • Sindhudurg
    • 416613
  • Pincode416613
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900027238
  • ReraGenie IDRG-MH-28648

Builder

  • NameRAMESHWAR CONSTRUCTIONS
  • Entity typeOthers
  • Named personRAMESHWAR CONSTRUCTIONS
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2020First promiseJun 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2024)
  • Buildings5 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAMESHWAR COMPLEX - ANA20000
RAMESHWAR COMPLEX - BNA20000
RAMESHWAR COMPLEX - CNA20000
RAMESHWAR COMPLEX - DNA20000
RAMESHWAR COMPLEX - ENA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 80%.

RAMESHWAR COMPLEX - A48%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAMESHWAR COMPLEX - B43%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAMESHWAR COMPLEX - C43%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAMESHWAR COMPLEX - D38%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAMESHWAR COMPLEX - E34%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes24%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,947 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDEVGAD JAMSANDE NAGARPANCHAYAT
Permissible FSI1187.59
Proposed, not sanctioned1,188 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEVGAD BRANCH

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASAD S KULKARNI
EngineerPRASAD KULKARNI
Chartered AccountantNEHALI AND CO
PartnerRole in project
Pukar-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900019044Jun 2024 → Jun 2025

Reason as filed by the promoterDue to shortage of material and labour we are not able to complete project on time. Please grant us extension of 1 year till 29 June 2025.

EA20072502113Jun 2024 → Dec 2026

Reason as filed by the promoterProviso of section 7(3) of the RERA Act gives the Authority the power to approve necessary extensions under reasonable circumstances, based upon the reasons and facts provided by the promoter. The difficulties we have faced have been meticulously i.e. shortage of labour and heavy rain fall. Construction industry is based on labours only and in our rural village lots of works are ongoing but labourers are short. Our labours are coming as per their wish and spare time so this is the major drawback of our project also our project is sea facing and due to heavy rain fall we could not work up to 5

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000591267DEVENDRA PANDURANG DAHIBAWKARPukar Dhoke ( Proprietor of Rameshwar Constructions)22/07/2024
CC12503935Pukar Suresh DhokeDevendra P Dahibawkar09/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2 annexture B 310325.pdf30 Sep 2025
Declaration and undertaking (Annexure A)File: Pdf_file_1753024889401 - converted.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ANNX A.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ANNX B.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ANNX B.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1A 8-47 PM.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 8-48 PM.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 8-48 PM.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20250430_234746-compressed-compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pdf_file_1738336266867-compressed (1).pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20250127_111304 - converted.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pdf_file_1737957459646_compressed (1).pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20250127_111733 - converted.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241031_141107_compressed.pdf31 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FY 2024-25 Q2-images-0.pdf31 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20241031_231121 (1).pdf31 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: page_1.pdf31 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20241031_141705.pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf2 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER FORM 2A.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf13 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA form 5 20-21 and 21-22.pdf10 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1.pdf5 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate form 2.pdf5 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate form 2A.pdf5 May 2022
CERSAI detailsFile: Cersai declaration.pdf14 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_com.pdf30 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_coM.pdf30 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A.pdf30 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (4) (1).pdf8 Sep 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf31 Aug 2021
Disclosure of sold/ booked inventoryFile: inventory discloser.pdf28 Aug 2021
Disclosure of sold/ booked inventoryFile: inventory (2).pdf19 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER FORM 2A.pdf14 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form 1_compressed.pdf30 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: engineer 2A_compressed.pdf30 Jan 2021
Building plan approvalFile: NA ORDER PUKAR.pdf14 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER PUKAR.pdf14 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-rameshwar construction.pdf13 Nov 2020
Proforma of Allotment letterFile: allotment and agreement.pdf13 Oct 2020
Declaration in FORM BFile: FORM B_compressed.pdf10 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf6 Oct 2020
Layout approvalFile: PLANS.pdf5 Oct 2020
PAN CardFile: pan card.pdf5 Oct 2020
Copy of the legal title reportFile: title report 36 pukar dhoke.pdf5 Oct 2020
Copy of the legal title reportFile: title report 37 pukar dhoke.pdf5 Oct 2020
Copy of the legal title reportFile: title 38 pukar dhoke.pdf5 Oct 2020
Copy of the legal title reportFile: title report 46 pukar dhoke.pdf5 Oct 2020
Copy of the legal title reportFile: title 47 pukar dhoke.pdf5 Oct 2020
Copy of the legal title reportFile: title 48 pukar dhoke.pdf5 Oct 2020
Copy of the legal title reportFile: title report 49 pukar dhoke.pdf5 Oct 2020
Details of encumbrancesFile: NO ENCUMBRANCE.pdf5 Oct 2020
Copy of Layout Approval (in case of layout)File: PLANS.pdf5 Oct 2020

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one moved by 30 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep RAMESHWAR COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND NIKHIL LUNCH HOME530+ in Sindhudurg

2 kmRAMESHWAR COMPLEXCompleted 3Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: RAMESHWAR CONSTRUCTIONS

RAMESHWAR CONSTRUCTIONS has 4 registrations on MahaRERA, including RAJ RESIDENCY and RAMESHWAR COMPLEX. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if RAMESHWAR COMPLEX is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAMESHWAR COMPLEX?

The registered promoter entity is RAMESHWAR CONSTRUCTIONS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAMESHWAR COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAMESHWAR COMPLEX?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAMESHWAR COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAMESHWAR COMPLEX?

The professionals named in the filing: Architect: PRASAD S KULKARNI; Engineer: PRASAD KULKARNI; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAMESHWAR COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAMESHWAR COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAMESHWAR COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.