Home / Browse projects / Mumbai Suburban, Maharashtra / RAJ ONE

Registered No litigation declared Residential / Group Housing project

RAJ ONE

By RAJ REALTORS

RG-MH-17871 · RERA P51800055404 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
67 of 170Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

RAJ ONE is a Residential / Group Housing project by RAJ REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055404 on 22 Mar 2024. Possession is promised by 31 Aug 2027. 103 of the 170 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRAJ ONE
  • TypeResidential / Group Housing
  • Location
    • RSC 11
    • SECTOR NO 1 CHARKOP
    • Charkop
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800055404
  • ReraGenie IDRG-MH-17871

Builder

  • NameRAJ REALTORS
  • Entity typePartnership
  • PartnersRAJESH KUMAR PHOOLRAJ SINGH, MUKESH JUHARMAL PARMAR, Sureshkumar Phoolraj Singh, Piyushkumar Babulal Jain, Ashish Jagdish Thakkar
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

61%103 of 170 units booked
80.7%Work done, per cost certificate

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA2525861298
B WINGNA252572072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed135

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots135
Closed/Covered135
BuildingClosed/CoveredTotal
A WING6767
B WING6868

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,897 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jul 2025
LandownerVillageDistrict
CHARKOP BHARAT BHUSHAN CO-OP HOUSING SOCIETY LTDKandivaliMumbai Suburban
CHARKOP SONAL CO-OP HSG SOCIETY LTDCharkopMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI11747.35
Proposed, not sanctioned11,289 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 11 MIRA ROAD EAST BRANCH
Estimated costRs 62.00 cr
Cost incurredRs 50.00 cr
Work done80.65%
BuildingWingEstimatedIncurred
A WINGNARs 30.00 crRs 24.00 cr
B WINGNARs 30.00 crRs 24.00 cr
-NARs 2.00 crRs 2.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG S RAYANI
EngineerABHIJIT PHATARPEKAR
EngineerJiten Patel
Chartered AccountantMBR AND ASSOCIATES
PartnerRole in project
RAJ REALTORS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600162Bhakti AchrekarRAJ REALTORS16/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Raj One Signed.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 Raj One Signed.pdf14 Apr 2026
Withdrawal Update Form 3File: RAJ ONE CA Form 3.pdf14 Apr 2026
Withdrawal Update Form 1File: RAJ ONE FORM 1 RERA DEC 2025 DSC.pdf13 Jan 2026
Withdrawal Update Form 1File: RAJ ONE FORM 1 RERA DEC 2025 DSC.pdf13 Jan 2026
Withdrawal Update Form 2File: Raj One Form 2 Dec-25 Signed.pdf13 Jan 2026
Withdrawal Update Form 2File: Raj One Form 2 Dec-25 Signed.pdf13 Jan 2026
Withdrawal Update Form 3File: Raj One Form 3 Dec 25 Signed.pdf13 Jan 2026
Withdrawal Update Form 3File: Raj One Form 3 Dec 25 Signed.pdf13 Jan 2026
Withdrawal Update Form 1File: RAJ ONE FORM 1.pdf16 Oct 2025
Withdrawal Update Form 2File: RAJ ONE FORM 2.pdf16 Oct 2025
Withdrawal Update Form 3File: RAJ ONE FORM 3.pdf16 Oct 2025
Withdrawal Update Form 1File: Arc Raj One.pdf5 Aug 2025
Withdrawal Update Form 2File: Raj Realtors Form 2.pdf5 Aug 2025
Withdrawal Update Form 3File: Raj One Form 3 June 2025.pdf5 Aug 2025
Form 1File: Arc Raj one Org.pdf26 Jul 2025
Form 2File: Eng Raj one.pdf26 Jul 2025
Form 3File: Raj One Form 3.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Raj One Inventories Mar- 25.pdf26 Jul 2025
Layout approvalFile: IOA PLAN-1-3.pdf26 Apr 2025
Layout approvalFile: IOA PLAN-4-5.pdf26 Apr 2025
Layout approvalFile: IOA PLAN-6-9.pdf26 Apr 2025
Building plan approvalFile: IOA AMENDED LETTER.pdf26 Apr 2025
Copy of Layout Approval (in case of layout)File: IOA PLAN-1-3.pdf26 Apr 2025
Copy of Layout Approval (in case of layout)File: IOA PLAN-4-5.pdf26 Apr 2025
Copy of Layout Approval (in case of layout)File: IOA PLAN-6-9.pdf26 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 2ND COMMENCEMENT CERTIFICATE.pdf26 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 3RD COMMENCEMENT CERTIFICATE.pdf26 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: IOA AMENDED LETTER.pdf26 Apr 2025
Declaration about Commencement CertificateFile: 2ND COMMENCEMENT CERTIFICATE.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj one.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj one.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj one.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj One Form 1.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj One Form 2.pdf15 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Raj One Form 2A.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RAJ ONE FORM 1 RERA.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3rd RAJ REALTORS FORM 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj One Form 2.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj One Form 2 A.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj One.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj One.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj One.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj One.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Raj One.pdf8 Jul 2024
Other - LegalFile: A(1) copy of lease deed (bharat bhushan co-op soc)_1_11zon.pdf15 Mar 2024
Other - LegalFile: B(1) copy of lease deed (charkop sonal soc)_2_11zon.pdf15 Mar 2024
Other - LegalFile: A(3) copy of soc reg (bharat bhushan soc).pdf15 Mar 2024
Other - LegalFile: B(3) copy of soc reg ( charkop sonal soc ).pdf15 Mar 2024
Other - TechnicalFile: ANNEX A - RAJ ONE.pdf15 Mar 2024
Other - TechnicalFile: cc validation mail screenshot.pdf15 Mar 2024
Building plan approvalFile: IOA COPY_11zon.pdf4 Mar 2024
Layout approvalFile: IOA PLAN -1_11zon.pdf4 Mar 2024
Layout approvalFile: IOA PLAN -2_11zon.pdf4 Mar 2024
Layout approvalFile: IOA PLAN -3_11zon.pdf4 Mar 2024
Layout approvalFile: IOA PLAN -4_11zon.pdf4 Mar 2024
Layout approvalFile: IOA PLAN -5_11zon.pdf4 Mar 2024
Layout approvalFile: IOA PLAN -6_11zon.pdf4 Mar 2024
PAN CardFile: RAJ REALTORS PAN.pdf4 Mar 2024
Copy of the legal title reportFile: Title Certificate - Adv Satish Sharma_compressed.pdf4 Mar 2024
Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUBRANCE TO FINANCE AND LEGAL.pdf4 Mar 2024
Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUBRANCE TO FINANCE AND LEGAL.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN -1_11zon.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN -2_11zon.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN -3_11zon.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN -4_11zon.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN -5_11zon.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN -6_11zon.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA COPY_11zon.pdf4 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 1ST COMMENCEMENT CERTIFICATE.pdf4 Mar 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf4 Mar 2024
Declaration in FORM BFile: Form-B.pdf4 Mar 2024
CERSAI detailsFile: CERSAI - RAJ ONE.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1st CA Certificate.pdf4 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Interest in other project.pdf4 Mar 2024
Proforma of Agreement for saleFile: Agreement for Sale1.pdf4 Mar 2024
Proforma of Allotment letterFile: Allotment Letter pdf.pdf4 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf4 Mar 2024
Deviation Report with respect to Allotment letterFile: DEVIATION IN RESPECT OF ALLOTMENT LETTER.pdf4 Mar 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAJ FLORENZARAJ FLORENZA OPP MBMC GARDEN VIJAY PARK MIRA ROAD EAST THANE 401107124CompletedDec 2022Mar 2021

How this compares with Mumbai Suburban

61%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJ ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR NO 1 CHARKOP6,700+ in Mumbai Suburban

2 kmRAJ ONECompleted 62Lapsed / revoked 42Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 181 registered projects within 2 km.

Builder: RAJ REALTORS

RAJ REALTORS has 6 registrations on MahaRERA, including RAJ FLORENZA and RAJ ONE. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RAJ ONE is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJ ONE?

The registered promoter entity is RAJ REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJ ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAJ ONE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAJ ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJ ONE?

The professionals named in the filing: Architect: CHIRAG S RAYANI; Engineer: ABHIJIT PHATARPEKAR; Engineer: Jiten Patel; Chartered Accountant: MBR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJ ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJ ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJ ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.