Completed No litigation declared Residential / Group Housing project

RAJ GALAXY

By RASHID RAJESAHEB HATTIWALE

RG-MH-40752 · RERA P53100050532 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
13 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

RAJ GALAXY is a Residential / Group Housing project by RASHID RAJESAHEB HATTIWALE in Sangli, Maharashtra, registered with MahaRERA as P53100050532 on 21 Apr 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 7 of the 20 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAJ GALAXY
  • TypeResidential / Group Housing
  • Location
    • KHANBHAG
    • SANGLI
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • 416416
  • Pincode416416
  • RERA no.P53100050532
  • ReraGenie IDRG-MH-40752

Builder

  • NameRASHID RAJESAHEB HATTIWALE
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredApr 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

35%7 of 20 units booked
101.8%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJ GALAXYNA6620020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

RAJ GALAXY: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area336 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Oct 2025
LandownerVillageDistrict
SHOUKAT AMIRHAMJEKHAN BIDIWALESangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritySMKC
Permissible FSI1179.9
Proposed, not sanctioned1,180 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJWADA CHOWK SANGLI MAHARASHTRA 416416
Estimated costRs 2.53 cr
Cost incurredRs 2.57 cr
Work done101.83%
BuildingWingEstimatedIncurred
RAJ GALAXYNARs 2.30 crRs 2.38 cr
-NARs 22.85 lakhRs 19.80 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT MOHAN PANDIT MOHAN PANDIT
EngineerSMITESH SHAH S SHAH
Chartered AccountantAKSHAY PRAMOD JOSHI PRAMOD JOSHI
PartnerRole in project
RASHID RAJESAHEB HATTIWALE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Up to Jun 2025.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Up to Sep 2025.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Up to Sep 2025.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Up To Dec 2025.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Up to Jun 2025.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Up to Sep 2025.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Up to Sep 2025.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Up to Sep 2025.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 Up To Jun 2025.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 Up To Sep 2025.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 Up To Sep 2025.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 Up To Dec 2025.pdf15 May 2026
Occupational CertificateFile: COMPLETION CERTIFICATE (1).pdf15 May 2026
Withdrawal Update Form 1File: JANUARY 2024 TO MARCH 2024.pdf29 Oct 2025
Withdrawal Update Form 2File: JANURAY 2024 TO MARCH 2024.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3 UP TO MAR 2025.pdf29 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan Mar 15, 2025 (1).pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate R R Hattiwale .pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: sdold.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JANUARY 2024 TO MARCH 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: APRIL 2023 TO JUN 2023.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JULY 2023 TO SEPTEMBER 2023.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OCTOBER 2023 TO DECEMBER 2023.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JANURAY 2024 TO MARCH 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: APRIL 2023 TO JUN 2023.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JULY 2023 TO SEPTEMBER 2023.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OCTOMBER 2023 TO DECEMEBER 2023.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JANUARY 2024 TO MARCH 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RAJ.pdf31 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOD RAJ.pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 1.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 2.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 3.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER 1.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER 2.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER 3.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: JUN.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: SEP.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: THIRD.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FIRST.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SECOND.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THIRD.pdf27 Apr 2024
Layout approvalFile: NAKASHA1.pdf2 Mar 2023
Building plan approvalFile: DWG.pdf2 Mar 2023
PAN CardFile: PAN CARD1.pdf2 Mar 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf2 Mar 2023
Details of encumbrances concerned to FinanceFile: ENC - FIN.pdf2 Mar 2023
Details of encumbrances concerned to FinanceFile: ENC - LEGAL.pdf2 Mar 2023
Details of encumbrances concerned to LegalFile: ENC - FIN.pdf2 Mar 2023
Details of encumbrances concerned to LegalFile: ENC - LEGAL.pdf2 Mar 2023
Copy of Layout Approval (in case of layout)File: NAKASHA1.pdf2 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG.pdf2 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION CERTIFICATE.pdf2 Mar 2023
Declaration about Commencement CertificateFile: DCC.pdf2 Mar 2023
Declaration in FORM BFile: FORM B - BUILDER.pdf2 Mar 2023
CERSAI detailsFile: CERSAI.pdf2 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca new-2.pdf2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: order 31.pdf2 Mar 2023
Proforma of Agreement for saleFile: AGREEMENT NEW.pdf2 Mar 2023
Proforma of Allotment letterFile: ALT LET NEW.pdf2 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEP BANK NEW.pdf2 Mar 2023
Deviation Report with respect to Allotment letterFile: NO DEV ALT.pdf2 Mar 2023
Deviation Report with respect to model copy of AgreementFile: NO DEV AGRI.pdf2 Mar 2023

How this compares with Sangli

35%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep RAJ GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANGLI790+ in Sangli

Builder: RASHID RAJESAHEB HATTIWALE

RASHID RAJESAHEB HATTIWALE has 3 registrations on MahaRERA, including RAJ HEIGHTS and RAJ ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if RAJ GALAXY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJ GALAXY?

The registered promoter entity is RASHID RAJESAHEB HATTIWALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJ GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJ GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJ GALAXY?

The professionals named in the filing: Architect: AMIT MOHAN PANDIT MOHAN PANDIT; Engineer: SMITESH SHAH S SHAH; Chartered Accountant: AKSHAY PRAMOD JOSHI PRAMOD JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJ GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJ GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJ GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.