Home / Browse projects / Raigarh, Maharashtra / Rainbow Life

Registered Litigation declared Others project

Rainbow Life

By Ellora Heritage LLP

RG-MH-23532 · RERA P52000078843 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 3.50 crore secured on the land, in favour of DCB Bank Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
82 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Rainbow Life is a Others project by Ellora Heritage LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000078843 on 15 Jan 2025. Possession is promised by 31 Dec 2030. 68 of the 150 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameRainbow Life
  • TypeOthers
  • Location
    • Rohinjan
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000078843
  • ReraGenie IDRG-MH-23532

Builder

  • NameEllora Heritage LLP
  • Entity typePartnership
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

45%68 of 150 units booked
12.1%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rainbow LifeNA312314010150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Rainbow Life: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed308

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots308
Closed/Covered225
Open Space83

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofDCB Bank Limited
Secured amountRs 3.50 crore
CERSAI search filedYes
Declared on15 Oct 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI15020.62
Proposed, not sanctioned14,985 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch75, VARDHAMAN MARKET, SECTOR 17, VASHI, NAVI MUMBAI - 400703
Estimated costRs 67.58 cr
Cost incurredRs 8.19 cr
Work done12.13%
BuildingWingEstimatedIncurred
Rainbow LifeNARs 66.23 crRs 8.19 cr
-NARs 1.35 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Firm
EngineerG A Bhilare Consultants Private Limited
EngineerNexus Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Ellora Heritage LLP-

Litigation declared2

CaseCourtStatus
22975/2024Supreme CourtDisposed
192/2024Panvel CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Rainbow Life as on March 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 - Rainbow Life as on March 2026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 - Rainbow Life as on March 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 - Rainbow Life as on Dec 2025.pdf12 Feb 2026
Withdrawal Update Form 2File: Form 2 - Rainbow Life as on Dec 2025.pdf12 Feb 2026
Withdrawal Update Form 3File: Form 3 - Rainbow Life as on Dec 2025.pdf12 Feb 2026
Withdrawal Update Form 1File: Form 1 - Rainbow Life as on Sep 2025.pdf6 Nov 2025
Withdrawal Update Form 2File: Form 2 - Rainbow Life as on Sep 2025.pdf6 Nov 2025
Withdrawal Update Form 3File: Form 3 - Rainbow Life as on Sep 2025.pdf6 Nov 2025
Layout approvalFile: Plan 1.pdf6 Oct 2025
Building plan approvalFile: Plan 2.pdf6 Oct 2025
Building plan approvalFile: Plan 3.pdf6 Oct 2025
Building plan approvalFile: Plan 4.pdf6 Oct 2025
Building plan approvalFile: Plan 5.pdf6 Oct 2025
Building plan approvalFile: Plan 6.pdf6 Oct 2025
Building plan approvalFile: Plan 7.pdf6 Oct 2025
Building plan approvalFile: Plan 7.pdf6 Oct 2025
Building plan approvalFile: Plan 8.pdf6 Oct 2025
Building plan approvalFile: Plan 9.pdf6 Oct 2025
Building plan approvalFile: Plan 10.pdf6 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Rainbow Life for FY 2024-25.pdf6 Oct 2025
Withdrawal Update Form 1File: Form 1 - Rainbow Life as on June 2025.pdf23 Sep 2025
Withdrawal Update Form 2File: Form 2 - Rainbow Life as on June 2025.pdf23 Sep 2025
Withdrawal Update Form 3File: Form 3 - Rainbow Life as on June 2025.pdf23 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Rainbow Life - Form 3.pdf15 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rainbow Life - Form 2.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rainbow Life as on March 2025.pdf26 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Rainbow Life as on March 2025.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Rainbow Life as on March 2025.pdf2 May 2025
Other - LegalFile: ELLORA HERITAGE LLP AGREEMENT.pdf6 Jan 2025
Other - FinanceFile: Land Cost declaration-rainbow life.pdf11 Dec 2024
Other - TechnicalFile: 11zon_JPEG-to-PDF.pdf9 Dec 2024
Building plan approvalFile: part 3 Building plan Rainbow life.pdf7 Dec 2024
Building plan approvalFile: Part 2 Building plan Rainbow life.pdf7 Dec 2024
Building plan approvalFile: Part 1 Building Plan Rainbow Life.pdf7 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Part 1 Building Plan Rainbow Life.pdf7 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Part 2 Building plan Rainbow life.pdf7 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: part 3 Building plan Rainbow life.pdf7 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf7 Dec 2024
Layout approvalFile: Approved Plan-1.pdf5 Dec 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter -Dues.pdf5 Dec 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER with Litigations.pdf5 Dec 2024
Copy of Layout Approval (in case of layout)File: Approved Plan-1.pdf5 Dec 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (1).pdf5 Dec 2024
Declaration in FORM BFile: FORM -B (Promoter).pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11zon_merged-PDF (1).pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-101-125.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-1-25.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-26-50.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-51-75_11zon.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-76-100.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-126-150.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-151-175.pdf5 Dec 2024
Other - LegalFile: Sale Deed-73-1-B (1)-176-192.pdf5 Dec 2024
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement Certificate.pdf5 Dec 2024
CERSAI detailsFile: Declaration of Cersai.pdf5 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Designated Bank Accounts -Area Sharing.pdf5 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation_AL_RAINBOW LIFE_10122024 (2).pdf5 Dec 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Letter -Dues.pdf5 Dec 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER with Litigations.pdf5 Dec 2024
Other - TechnicalFile: Order No 50.pdf5 Dec 2024
Deviation Report with respect to model copy of AgreementFile: AFS_Deviation Report_ RAINBOW LIFE_10122024_11zon.pdf5 Dec 2024
Proforma of Agreement for saleFile: 11zon_AFS_RAINBOW_LIFE_10122024_(5)___F[1].pdf5 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Rainbow Life.pdf5 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Finance.pdf5 Dec 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf25 Nov 2024
PAN CardFile: PAN COPY (2).pdf7 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Astitva Trimaya - CC _11zon.pdf7 Nov 2024

How this compares with Raigarh

45%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rainbow Life on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rohinjan5,900+ in Raigarh

2 kmRainbow LifeCompleted 30Lapsed / revoked 33Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 139 registered projects within 2 km.

Builder: Ellora Heritage LLP

Ellora Heritage LLP has 2 registrations on MahaRERA, including Rainbow Life and Urban Palace Phase 1. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Rainbow Life is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rainbow Life?

The registered promoter entity is Ellora Heritage LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rainbow Life?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rainbow Life?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rainbow Life?

The professionals named in the filing: Architect: The Firm; Engineer: G A Bhilare Consultants Private Limited; Engineer: Nexus Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rainbow Life?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rainbow Life. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rainbow Life to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.