ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / RAGHAV PARIJAT

Registered Litigation declared Residential / Group Housing project

RAGHAV PARIJAT

By RAGHAV Realty Developers

RG-MH-97642 · RERA P51800050808 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 38.00 crore secured on the land, in favour of AU SMALL FINANCE BANK, AU SMALL FINANCE BANK LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Staircases, 80%
42 of 146Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

RAGHAV PARIJAT is a Residential / Group Housing project by RAGHAV Realty Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050808 on 3 May 2023. Possession is promised by 29 Dec 2026. The completion date has moved by 12 months from the original filing. 104 of the 146 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAGHAV PARIJAT
  • TypeResidential / Group Housing
  • Location
    • Nehru Nagar
    • Kurla East
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050808
  • ReraGenie IDRG-MH-97642

Builder

  • NameRAGHAV Realty Developers
  • Entity typePartnership
  • GSTIN27ABEFR2586H1ZW
  • PartnerSUDHANSHU RAMAVTAR AGARWAL

Key dates

this monthRegisteredMay 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion29 Dec 2026
  • Revised completionRevised to 29 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed127 files

Current status

71%104 of 146 units booked
29.1%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAGHAV PARIJATNA21171460146

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

RAGHAV PARIJAT: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area868 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK, AU SMALL FINANCE BANK LIMITED
Secured amountRs 38.00 crore
CERSAI search filedYes
Declared on29 Oct 2025
LandownerVillageDistrict
NEHRU NAGAR OM CHS LTDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI5698.59
Proposed, not sanctioned5,699 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5 FLOOR KANAKIA ZILLION E WING KURLA
Estimated costRs 73.80 cr
Cost incurredRs 21.51 cr
Work done29.14%
BuildingWingEstimatedIncurred
RAGHAV PARIJATNARs 36.90 crRs 21.51 cr
-NARs 36.90 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMehul Vaghela
ArchitectCreative Consultancy
EngineerRupesh R Chowdhary
EngineerUnisteps Consulting
Chartered AccountantJain Gurjar And Associates Hardik jain
Chartered AccountantAgarwal Sanganeria & CO.
Chartered AccountantG.P. Sharma & Co. LLP
PartnerRole in project
RAGHAV Realty Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18122518736Dec 2025 → Dec 2026

Reason as filed by the promoterShortage of labour and construction materials

Litigation declared3

CaseCourtStatus
14250/2021High Court of BombayDecision pending
14250/2021HIGH COURT OF BOMBBAYOngoing
14250/2021Bombay High CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Dec 2026

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Raghav Parijat (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 Raghav Parijat (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 Raghav Parijat (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate March 2026.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate March 2026.pdf7 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate March 2026.pdf7 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate December 2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate Decemeber 2025.pdf7 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate September 2025.pdf7 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 CA Certificate March 2024.pdf3 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 CA Certificate March 2025.pdf3 Dec 2025
Form 1File: Form 1 Architects Certificate June 2025.pdf28 Oct 2025
Form 2File: Form 2 Engineers Certificate June 2025.pdf28 Oct 2025
Form 3File: Form 3 CA Certificate 25 June 2025.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure June 2025.pdf28 Oct 2025
Form 1File: Form 1 Architects Certificate June 2023.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate June 2023.pdf27 Oct 2025
Form 3File: Form 3 Parijat C A Certificate June 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure June 2023.pdf27 Oct 2025
Form 1File: Form 1 Architect's Certificate September 2023.pdf27 Oct 2025
Form 2File: Form 2 Engineer's Certificate September 2023.pdf27 Oct 2025
Form 3File: Form 3 CA Certificate September 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure September 2023.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate December 2023.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate December 2023.pdf27 Oct 2025
Form 3File: Form 3 C A Certificate December 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure December 2023.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate March 2024.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate March 2024.pdf27 Oct 2025
Form 3File: Form 3 CA Certificate March 2024.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure March 2024.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate June 2024.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate June 2024.pdf27 Oct 2025
Form 3File: Form 3 Parijat CA Certificate June 2024.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure June 2024.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate September 2024.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate September 2024.pdf27 Oct 2025
Form 3File: Form 3 CA Certificate September 2024.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure September 2024.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate December 2024.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate December 2024.pdf27 Oct 2025
Form 3File: Form 3 CA Certificate December 2024.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure December 2024.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate March 2025.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate March 2025.pdf27 Oct 2025
Form 3File: Form 3 CA Certificate March 2025.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat Disclosure March 2025.pdf27 Oct 2025
Form 1File: Form 1 Architects Certificate September 2025.pdf27 Oct 2025
Form 2File: Form 2 Engineers Certificate September 2025.pdf27 Oct 2025
Form 3File: Form 3 CA Certificate September 2025.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Raghav Parijat DisclosureSeptember 2025.pdf27 Oct 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation Demand Note -March 2025.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate June 2025.pdf7 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 25 June 2025.pdf7 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2025.pdf7 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2025.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2025.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2025.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate March 2025.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2024.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate December 2024.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate December 2024.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate December 2024.pdf7 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Further CC of BLDG No 72 upto 17th Floor Nehru Nagar.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PARIJAT FORM 5 CA Certificate March 2024.pdf12 Nov 2024
Declaration in FORM BFile: Form B- Parijat.pdf28 Oct 2024
Building plan approvalFile: CC revalidation.pdf21 Oct 2024
Declaration in FORM BFile: Form B- Extension.pdf21 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC revalidation-1-2.pdf21 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC revalidation.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold, Unsold Inventory- Parijat.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate September 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate September 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate September 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate September 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Parijat CA Certificate June 2024.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate June 2024.pdf7 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2024.pdf7 Jul 2024

How this compares with Mumbai Suburban

71%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAGHAV PARIJAT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla East6,700+ in Mumbai Suburban

2 kmRAGHAV PARIJATCompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: RAGHAV Realty Developers

RAGHAV Realty Developers has 1 registration on MahaRERA, including RAGHAV PARIJAT. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RAGHAV PARIJAT is delayed beyond 29 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAGHAV PARIJAT?

The registered promoter entity is RAGHAV Realty Developers, a partnership as per the filing. Its GSTIN 27ABEFR2586H1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAGHAV PARIJAT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAGHAV PARIJAT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAGHAV PARIJAT?

The professionals named in the filing: Architect: Mehul Vaghela; Architect: Creative Consultancy; Engineer: Rupesh R Chowdhary; Engineer: Unisteps Consulting; Chartered Accountant: Jain Gurjar And Associates Hardik jain; Chartered Accountant: Agarwal Sanganeria & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAGHAV PARIJAT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAGHAV PARIJAT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAGHAV PARIJAT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.