Home / Browse projects / Mumbai Suburban, Maharashtra / RAGHAV NOVA

Registration lapsed No litigation declared Residential / Group Housing project

RAGHAV NOVA

By VAIDEHI CONSTRUCTION & DEVELOPERS

RG-MH-30437 · RERA P51800030949 · Last updated on MahaRERA portal: 3 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 29 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

RAGHAV NOVA is a Residential / Group Housing project by VAIDEHI CONSTRUCTION & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030949 on 29 Sep 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 29 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRAGHAV NOVA
  • TypeResidential / Group Housing
  • Location
    • P V MARG
    • NEHRU NAGAR KURLA EAST
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030949
  • ReraGenie IDRG-MH-30437

Builder

  • NameVAIDEHI CONSTRUCTION & DEVELOPERS
  • Entity typePartnership
  • GSTIN27AALFV5277H1ZL
  • PartnersSudhanshu Ramavtar Agarwal, Sushma Sudhanshu Agarwal

Key dates

10 months past promisethis monthRegisteredSep 2021First promiseJul 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Jul 2023)
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAGHAV NOVANA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

RAGHAV NOVA: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered1
Open Space20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,069 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI4281.23
Proposed, not sanctioned4,184 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR MAURYA ESTATE LINK ROAD ANDHERI WEST MUMBAI 400053

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCreative Consultancy
ArchitectM/s Creative Consultancy
EngineerRupesh Choudhary
EngineerUniSteps Consulting
Chartered AccountantAGARWAL SANGNERIA AND CO
Chartered AccountantG.P. Sharma & Co. LLP
Chartered AccountantAgarwal Sanganeria & CO.
PartnerRole in project
VAIDEHI CONSTRUCTION & DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024138Jul 2023 → Dec 2024

Reason as filed by the promoterDear respected members of the MahaRERA, Despite our meticulous planning and rigorous efforts to adhere to the original timeline, we have encountered several unforeseen challenges that have impacted the progress & completion of our ongoing residential project, RAGHAV NOVA, located at Nehru Nagar, Kurla (E), Mumbai 400 024. Therefore, we request an extension for the completion of our near completed Project. The following are the brief details of our request: 1. Project details: RAGHAV NOVA, located at Nehru Nagar, Kurla (E), Mumbai 400 024. 2. Current stage of the Project: 95% completed, with pa

EXT51800013145Jul 2023 → Jul 2024

Reason as filed by the promoterSupply chain issue, material supply delays, unforeseen situations in construction and Local festivals - no construction possible during navratri & ganesh festivals

EXT51800027962Jul 2023 → Dec 2025

Reason as filed by the promoterWe have successfully completed the construction of our composite building and are ready to hand over possession. The CFO NOC has been obtained, and we have submitted our application for the OCC. Due to unanticipated delays in obtaining the necessary approvals, we kindly request an extension for the completion of our project

Litigation declared1

CaseCourtStatus
2009/2020HIGH COURTDismissed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501515Aniket Chandrakant SonawaneVAIDEHI CONSTRUCTION & DEVELOPERS06/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Apr 2025

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2021-2022)File: FORM 5 CA Certificate March 2022.pdf3 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 CA Certificate March 2023.pdf3 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 CA Certificate March 2024.pdf3 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 CA Certificate March 2025.pdf28 Nov 2025
Commencement Certificates / NA Order for plotted developmentFile: Maheshwar CC re-endorsed cum Full CC to Sale Wing.pdf25 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Maheshwar Amended cum Part OCC to Composite Bldg.pdf25 Apr 2025
Declaration about Commencement CertificateFile: Maheshwar CC re-endorsed cum Full CC to Sale Wing.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Status- Raghav Nova.pdf24 Apr 2025
Declaration in FORM BFile: Form B-Declaration by Promoter-NOVA- Extension.pdf16 Apr 2025
Declaration in FORM BFile: Form B-Declaration by Society -NOVA- Extension.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025 (2).pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2025.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2025.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate March 2025.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2024.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate December 2024.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate December 2024.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate December 2024.pdf7 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Certificate March 2024.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- NOVA.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate September 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate September 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate September 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate September 2024.pdf7 Oct 2024
Layout approvalFile: Layout Plan (Nova) 1 to 7.pdf15 Jul 2024
Layout approvalFile: Layout Plan (Nova) 1 to 7.pdf15 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Plan (Nova) 1 to 7.pdf15 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Plan (Nova) 1 to 7.pdf15 Jul 2024
Layout approvalFile: Annexure - 1 layout plan nova.pdf10 Jul 2024
Layout approvalFile: Annexure - 1 layout plan nova.pdf10 Jul 2024
Copy of Layout Approval (in case of layout)File: Annexure - 1 layout plan nova.pdf10 Jul 2024
Copy of Layout Approval (in case of layout)File: Annexure - 1 layout plan nova.pdf10 Jul 2024
Declaration in FORM BFile: Form B (Developer).pdf10 Jul 2024
Declaration in FORM BFile: Form B (Society).pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024 (1).pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory (Raghav Nova).pdf9 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: VCD (RERA) (Format A) (1).pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate June 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate June 2024.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest In Other Real Estate Organization.pdf28 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest In Other Real Estate Organization.pdf28 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest In Other Real Estate Organization SA.pdf28 Jun 2024
Declaration in FORM BFile: Affidivat cum Declaration Form B.pdf27 Jun 2024
Declaration in FORM BFile: Affidivat cum Declaration Form B 1.pdf27 Jun 2024
Home Buyer /Allottee Grievance Redressal CellFile: GRO- Declaration- Nova.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2024.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA Certificate March 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2024.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate December 2023.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2023.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate December 2023.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer QA Certificate December 2023.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Certificate March 2023.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 September 2023.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2023.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A September 2023.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineers QA Certificate June 2023.pdf8 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Annexure A June 2023.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2023.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nova C A Certificate June 2023.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March 2023.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March 2023.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qualty Certificate March 2023.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate March 2023.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CA Certificate.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 2022.pdf7 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Dec 2022.pdf7 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer Certificate QA Dec 2022.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate Dec 2022.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 FY 2020-21.pdf4 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA Certificate March 2022.pdf9 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A QA certificate (September 2022).pdf15 Oct 2022
CERSAI detailsFile: CERSAI Details NOVA.pdf15 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory (30 Sept 2022).pdf15 Oct 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 29 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAGHAV NOVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEHRU NAGAR KURLA EAST6,700+ in Mumbai Suburban

2 kmRAGHAV NOVACompleted 159Lapsed / revoked 138Other 168Dot size: filed unitsN

Filed coordinates, straight-line distance. 465 registered projects within 2 km.

Builder: VAIDEHI CONSTRUCTION & DEVELOPERS

VAIDEHI CONSTRUCTION & DEVELOPERS has 1 registration on MahaRERA, including RAGHAV NOVA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that RAGHAV NOVA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RAGHAV NOVA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAGHAV NOVA?

The registered promoter entity is VAIDEHI CONSTRUCTION & DEVELOPERS, a partnership as per the filing. Its GSTIN 27AALFV5277H1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAGHAV NOVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAGHAV NOVA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAGHAV NOVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAGHAV NOVA?

The professionals named in the filing: Architect: Creative Consultancy; Architect: M/s Creative Consultancy; Engineer: Rupesh Choudhary; Engineer: UniSteps Consulting; Chartered Accountant: AGARWAL SANGNERIA AND CO; Chartered Accountant: G.P. Sharma & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAGHAV NOVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAGHAV NOVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAGHAV NOVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.