Home / Browse projects / Pune, Maharashtra / RADHIKA CO-OPERATIVE HOUSING SOCIETY
RADHIKA CO-OPERATIVE HOUSING SOCIETY
RG-MH-73998 · RERA P52100049461 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RADHIKA CO-OPERATIVE HOUSING SOCIETY is a Residential / Group Housing project by GURUKRUPA CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100049461 on 14 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 15 of the 27 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameRADHIKA CO-OPERATIVE HOUSING SOCIETY
- TypeResidential / Group Housing
- Location
- NEAR ASHOK TAPOVAN MANDIR
- PIMPRI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411017
- Pincode411017
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049461
- ReraGenie IDRG-MH-73998
Builder
- NameGURUKRUPA CONSTRUCTIONS
- Entity typePartnership
- PartnerASHISH HEERACHAND ASWANI
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Feb 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed82 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 7 | 7 | 14 | 0 | 14 |
| WING B | NA | 7 | 7 | 13 | 0 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
WING A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 12 | 12 |
| WING B | 12 | 12 |
Land and ownership19
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MR. KISAN LAXMAN THORAT | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. TRUPTI KISAN THORAT | Pimpri Chinchawad (M Corp.) | Pune |
| MR.CHANDURLAL KALYANDASRELWANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. KAVITA CHANDURLALRELWANI | Pimpri Chinchawad (M Corp.) | Pune |
| MR. LAKHAN CHANDURLAL RELWANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS .REKHA MOHANLAL WADHWANI | Pimpri Chinchawad (M Corp.) | Pune |
| NARESH HARGUNDAS KHANCHANDANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS.SURABHI HARAGUNDA KHANCHANDANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. LACHIBAI SUDHAMONMAL PANJWANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. SANGEETA SUNEELKUMAR PANJWANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. BHARATI OMPRAKASH JHAMTANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. PUSHPADEVI MAHAVEER MITTAL | Pimpri Chinchawad (M Corp.) | Pune |
| MR. ASHOK GIRIDHARLAL LAKHANI | Pimpri Chinchawad (M Corp.) | Pune |
| MISS. SHARMILA GIRIDHARLAL LAKHANI | Pimpri Chinchawad (M Corp.) | Pune |
| MR. VINOD PRAKASH GIDWANI | Pimpri Chinchawad (M Corp.) | Pune |
| SMT. NEELAM PRAKASH GIDWANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS. RADHIKA DEEPAK TULSANI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS MANIMALA PURI | Pimpri Chinchawad (M Corp.) | Pune |
| MRS MEENA C KHAMCHADANI ALIAS KHANCHANDANI | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 4.33 cr | Rs 3.54 cr |
| WING B | NA | Rs 4.02 cr | Rs 3.29 cr |
| - | NA | Rs 27.40 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TRUPTI BHADARE |
| Architect | Trupati Bhadre |
| Engineer | AKSHAY SHELAR |
| Chartered Accountant | HARY KURUP |
| Chartered Accountant | PARAG S SAVALE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GURUKRUPA CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: AR CERTIFICATE _ FORM 4.pdf | 27 May 2026 |
| Occupational CertificateFile: scan0003_compressed.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf | 2 Feb 2026 |
| Occupational CertificateFile: Completion Certificate.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf | 12 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 Q3.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY2024-25 Signed.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 Final.pdf | 23 Apr 2025 |
| Building plan approvalFile: scan0003 - converted.pdf | 17 Jan 2025 |
| Building plan approvalFile: scan0004 - converted.pdf | 17 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0003 - converted.pdf | 17 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0004 - converted.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Final.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 final.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf | 16 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 16 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form-1.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form-2.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE-Final.pdf | 6 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf | 6 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signed.pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR LETTER - FORM 1.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 - Signed.pdf | 15 Jan 2024 |
| Building plan approvalFile: Plan 1.pdf | 29 Dec 2023 |
| Building plan approvalFile: Plan 2.pdf | 29 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 29 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 29 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 20231226185917.pdf | 29 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 7 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 7 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form-3 Gurukrupa Constructions.pdf | 7 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE March 23.pdf | 25 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE June 23.pdf | 25 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 23.pdf | 25 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cetificate - June 23.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gurukrupa Construction Form 3 - Mar 23 Signed.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gurukrupa Construction Form 3 - June 23 Signed.pdf | 25 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gurukrupa Construction - Form 5 Signed.pdf | 25 Aug 2023 |
| Building plan approvalFile: 2_page (2).pdf | 16 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_page (2).pdf | 16 Jan 2023 |
| Proforma of Agreement for saleFile: Draft Agreemant 11-01-2023.pdf | 11 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deve 11-01-2023.pdf | 11 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Partner disclosure.pdf | 4 Jan 2023 |
| Copy of the legal title reportFile: Search Report 12-12-2022.pdf | 16 Dec 2022 |
| Layout approvalFile: Plan 1.pdf | 4 Dec 2022 |
| Building plan approvalFile: Plan 2.pdf | 4 Dec 2022 |
| PAN CardFile: Gurukrupa Construction Pan.pdf | 4 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 4 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 4 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 4 Dec 2022 |
| Declaration about Commencement CertificateFile: C C DEC.pdf | 4 Dec 2022 |
| Declaration in FORM BFile: FORM - B (52051).pdf | 4 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Dec 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 4 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gurukrupa_compressed.pdf | 4 Dec 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 4 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf | 4 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: DEV AL.pdf | 4 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CONCERNED TO FINANCE.pdf | 2 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: GURUKRUPA CONSTRUCTION - NO ENCUMBRANCES CONCERNS TO LEGAL.pdf | 2 Dec 2022 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CONCERNED TO FINANCE.pdf | 2 Dec 2022 |
| Details of encumbrances concerned to LegalFile: GURUKRUPA CONSTRUCTION - NO ENCUMBRANCES CONCERNS TO LEGAL.pdf | 2 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GURUKRUPA CONSTRUCTION - FORM 2.pdf | 2 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
Keep RADHIKA CO-OPERATIVE HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIMPRI13,700+ in Pune
Filed coordinates, straight-line distance. 235 registered projects within 2 km.
VARDHAMAN SKYTOWN
VARDHAMAN ASSOCIATES
Tamara
Goldfinger Kataria Urban Developments
Sindhu Skies
G K Wonders
Legacy Kairos A and B Building
Legacy Lifespaces LLP
Amberwood Phase 1
SMP NAMRATA ASSOCIATES
121 Paradise Phase I
Wamanbhau & Daga Realtors LLP
Builder: GURUKRUPA CONSTRUCTIONS
GURUKRUPA CONSTRUCTIONS has 1 registration on MahaRERA, including RADHIKA CO-OPERATIVE HOUSING SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if RADHIKA CO-OPERATIVE HOUSING SOCIETY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RADHIKA CO-OPERATIVE HOUSING SOCIETY?
The registered promoter entity is GURUKRUPA CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RADHIKA CO-OPERATIVE HOUSING SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RADHIKA CO-OPERATIVE HOUSING SOCIETY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RADHIKA CO-OPERATIVE HOUSING SOCIETY?
The professionals named in the filing: Architect: TRUPTI BHADARE; Architect: Trupati Bhadre; Engineer: AKSHAY SHELAR; Chartered Accountant: HARY KURUP; Chartered Accountant: PARAG S SAVALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RADHIKA CO-OPERATIVE HOUSING SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback