Home / Browse projects / Pune, Maharashtra / RADHIKA CO-OPERATIVE HOUSING SOCIETY

Completed No litigation declared Residential / Group Housing project

RADHIKA CO-OPERATIVE HOUSING SOCIETY

By GURUKRUPA CONSTRUCTIONS

RG-MH-73998 · RERA P52100049461 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
12 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

RADHIKA CO-OPERATIVE HOUSING SOCIETY is a Residential / Group Housing project by GURUKRUPA CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100049461 on 14 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 15 of the 27 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameRADHIKA CO-OPERATIVE HOUSING SOCIETY
  • TypeResidential / Group Housing
  • Location
    • NEAR ASHOK TAPOVAN MANDIR
    • PIMPRI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049461
  • ReraGenie IDRG-MH-73998

Builder

  • NameGURUKRUPA CONSTRUCTIONS
  • Entity typePartnership
  • PartnerASHISH HEERACHAND ASWANI

Key dates

this monthRegisteredFeb 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Feb 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed82 files

Current status

56%15 of 27 units booked
79.2%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA7714014
WING BNA7713013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24
BuildingClosed/CoveredTotal
WING A1212
WING B1212

Land and ownership19

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area923 sq m
Land owned byThe promoter, with other names on the file
Named landowners19
LandownerVillageDistrict
MR. KISAN LAXMAN THORATPimpri Chinchawad (M Corp.)Pune
MRS. TRUPTI KISAN THORATPimpri Chinchawad (M Corp.)Pune
MR.CHANDURLAL KALYANDASRELWANIPimpri Chinchawad (M Corp.)Pune
MRS. KAVITA CHANDURLALRELWANIPimpri Chinchawad (M Corp.)Pune
MR. LAKHAN CHANDURLAL RELWANIPimpri Chinchawad (M Corp.)Pune
MRS .REKHA MOHANLAL WADHWANIPimpri Chinchawad (M Corp.)Pune
NARESH HARGUNDAS KHANCHANDANIPimpri Chinchawad (M Corp.)Pune
MRS.SURABHI HARAGUNDA KHANCHANDANIPimpri Chinchawad (M Corp.)Pune
MRS. LACHIBAI SUDHAMONMAL PANJWANIPimpri Chinchawad (M Corp.)Pune
MRS. SANGEETA SUNEELKUMAR PANJWANIPimpri Chinchawad (M Corp.)Pune
MRS. BHARATI OMPRAKASH JHAMTANIPimpri Chinchawad (M Corp.)Pune
MRS. PUSHPADEVI MAHAVEER MITTALPimpri Chinchawad (M Corp.)Pune
MR. ASHOK GIRIDHARLAL LAKHANIPimpri Chinchawad (M Corp.)Pune
MISS. SHARMILA GIRIDHARLAL LAKHANIPimpri Chinchawad (M Corp.)Pune
MR. VINOD PRAKASH GIDWANIPimpri Chinchawad (M Corp.)Pune
SMT. NEELAM PRAKASH GIDWANIPimpri Chinchawad (M Corp.)Pune
MRS. RADHIKA DEEPAK TULSANIPimpri Chinchawad (M Corp.)Pune
MRS MANIMALA PURIPimpri Chinchawad (M Corp.)Pune
MRS MEENA C KHAMCHADANI ALIAS KHANCHANDANIPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI3215.82
Proposed, not sanctioned3,097 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKUDALE PALAZA, SURVEY NO 11/1/1, PIMPRI
Estimated costRs 8.62 cr
Cost incurredRs 6.83 cr
Work done79.21%
BuildingWingEstimatedIncurred
WING ANARs 4.33 crRs 3.54 cr
WING BNARs 4.02 crRs 3.29 cr
-NARs 27.40 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTRUPTI BHADARE
ArchitectTrupati Bhadre
EngineerAKSHAY SHELAR
Chartered AccountantHARY KURUP
Chartered AccountantPARAG S SAVALE & ASSOCIATES
PartnerRole in project
GURUKRUPA CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: AR CERTIFICATE _ FORM 4.pdf27 May 2026
Occupational CertificateFile: scan0003_compressed.pdf27 May 2026
Withdrawal Update Form 1File: Form-1.pdf2 Feb 2026
Withdrawal Update Form 1File: Form-1.pdf2 Feb 2026
Withdrawal Update Form 1File: Form-1.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf2 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf2 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf2 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf2 Feb 2026
Occupational CertificateFile: Completion Certificate.pdf2 Feb 2026
Withdrawal Update Form 1File: Architect Certificate.pdf12 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate - Form 2.pdf12 Nov 2025
Withdrawal Update Form 3File: Signed Form 3 - Q1 FY 25-26.pdf12 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 Q3.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY2024-25 Signed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 Final.pdf23 Apr 2025
Building plan approvalFile: scan0003 - converted.pdf17 Jan 2025
Building plan approvalFile: scan0004 - converted.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0003 - converted.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0004 - converted.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Final.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 final.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf16 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form-1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form-2.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE-Final.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signed.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR LETTER - FORM 1.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 - Signed.pdf15 Jan 2024
Building plan approvalFile: Plan 1.pdf29 Dec 2023
Building plan approvalFile: Plan 2.pdf29 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf29 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf29 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 20231226185917.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form-3 Gurukrupa Constructions.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE March 23.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE June 23.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 23.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cetificate - June 23.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gurukrupa Construction Form 3 - Mar 23 Signed.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gurukrupa Construction Form 3 - June 23 Signed.pdf25 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gurukrupa Construction - Form 5 Signed.pdf25 Aug 2023
Building plan approvalFile: 2_page (2).pdf16 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 2_page (2).pdf16 Jan 2023
Proforma of Agreement for saleFile: Draft Agreemant 11-01-2023.pdf11 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deve 11-01-2023.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Partner disclosure.pdf4 Jan 2023
Copy of the legal title reportFile: Search Report 12-12-2022.pdf16 Dec 2022
Layout approvalFile: Plan 1.pdf4 Dec 2022
Building plan approvalFile: Plan 2.pdf4 Dec 2022
PAN CardFile: Gurukrupa Construction Pan.pdf4 Dec 2022
Copy of Layout Approval (in case of layout)File: Plan 1.pdf4 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf4 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf4 Dec 2022
Declaration about Commencement CertificateFile: C C DEC.pdf4 Dec 2022
Declaration in FORM BFile: FORM - B (52051).pdf4 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Dec 2022
CERSAI detailsFile: CERSAI Search Report.pdf4 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gurukrupa_compressed.pdf4 Dec 2022
Proforma of Allotment letterFile: Allotment Letter.pdf4 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf4 Dec 2022
Deviation Report with respect to Allotment letterFile: DEV AL.pdf4 Dec 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CONCERNED TO FINANCE.pdf2 Dec 2022
Details of encumbrances concerned to FinanceFile: GURUKRUPA CONSTRUCTION - NO ENCUMBRANCES CONCERNS TO LEGAL.pdf2 Dec 2022
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CONCERNED TO FINANCE.pdf2 Dec 2022
Details of encumbrances concerned to LegalFile: GURUKRUPA CONSTRUCTION - NO ENCUMBRANCES CONCERNS TO LEGAL.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GURUKRUPA CONSTRUCTION - FORM 2.pdf2 Dec 2022

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RADHIKA CO-OPERATIVE HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPRI13,700+ in Pune

2 kmRADHIKA CO-OPERATIVE HOUCompleted 63Lapsed / revoked 37Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 235 registered projects within 2 km.

Builder: GURUKRUPA CONSTRUCTIONS

GURUKRUPA CONSTRUCTIONS has 1 registration on MahaRERA, including RADHIKA CO-OPERATIVE HOUSING SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RADHIKA CO-OPERATIVE HOUSING SOCIETY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RADHIKA CO-OPERATIVE HOUSING SOCIETY?

The registered promoter entity is GURUKRUPA CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RADHIKA CO-OPERATIVE HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RADHIKA CO-OPERATIVE HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RADHIKA CO-OPERATIVE HOUSING SOCIETY?

The professionals named in the filing: Architect: TRUPTI BHADARE; Architect: Trupati Bhadre; Engineer: AKSHAY SHELAR; Chartered Accountant: HARY KURUP; Chartered Accountant: PARAG S SAVALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RADHIKA CO-OPERATIVE HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RADHIKA CO-OPERATIVE HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RADHIKA CO-OPERATIVE HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.